Filter interviews by
Clear (1)
I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.
To maintain an air compressor, regular maintenance and inspections are necessary.
Check and change the oil regularly
Inspect and clean the air filters
Drain moisture from the tank
Inspect and tighten all connections
Keep the compressor in a clean and well-ventilated area
Follow manufacturer's guidelines for maintenance
AutoCAD is a computer-aided design software used for creating 2D and 3D designs.
AutoCAD is a software developed by Autodesk.
It is widely used in various industries like architecture, engineering, and construction.
It allows users to create precise and detailed drawings using a variety of tools and commands.
AutoCAD supports both 2D and 3D modeling.
Users can create objects, apply dimensions, add annotations, and perform s...
Top trending discussions
I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Oct 2019. There were 4 interview rounds.
I applied via Job Fair and was interviewed before Feb 2021. There was 1 interview round.
I was interviewed in Jun 2020.
posted on 22 Jul 2021
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 4 interview rounds.
posted on 16 Jul 2024
I applied via LinkedIn and was interviewed before Jul 2023. There were 2 interview rounds.
The impact of automation on warehouse efficiency," "Optimizing ergonomics in material handling operations," "Safety protocols for forklift operations.
Material pile height refers to the vertical measurement of stacked materials, crucial for storage and safety in various industries.
Material pile height is essential for optimizing storage space in warehouses.
Excessive pile height can lead to safety hazards, such as collapse.
For example, in construction, the height of stacked bricks must be regulated.
Different materials have different safe pile heights; for instance, lo...
Effective strategies to address and reduce stacking time issues in operations.
Identify bottlenecks: Analyze the workflow to find where delays occur, such as slow equipment or processes.
Implement lean principles: Streamline operations by eliminating waste and optimizing resource use, like reducing unnecessary steps in a process.
Enhance communication: Foster clear communication among team members to ensure everyone is aw...
To mitigate incidents from previous plants, I would analyze, implement safety measures, and train staff effectively.
Conduct a thorough incident analysis to identify root causes.
Implement corrective actions based on findings, such as upgrading equipment.
Enhance safety protocols and standard operating procedures.
Provide comprehensive training for staff on new safety measures.
Establish a regular review process to monitor
based on 1 interview
Interview experience
based on 14 reviews
Rating in categories
Assistant Manager
102
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
38
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Vedanta Limited