I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
IS code 1200 is preferred for measurement, and it has 3 parts.
IS code 1200 is used for measurement of buildings and civil engineering works.
It has 3 parts: Part 1 deals with Earthwork, Part 2 deals with Concrete work, and Part 3 deals with Reinforcement work.
The code provides guidelines for measurement, billing, and payment of construction works.
Offset for any foundation as per IS 1200 part-1.
As per IS 1200 part-1, the offset for any foundation should be 75mm.
Offset is the distance between the center of the column and the center of the foundation.
This offset is necessary to ensure that the load from the column is transferred to the foundation evenly.
For example, if the center of the column is 1000mm from the edge of the foundation, the center of the foundation
Yes, I have experience in shore piling, skin concrete, and waterproofing of basement.
I have worked on several projects involving shore piling, including the installation of sheet piles and soldier piles.
I have experience in the application of skin concrete to provide a durable and aesthetically pleasing finish to concrete surfaces.
I have also worked on waterproofing basement structures using various methods such as mem
Top trending discussions
I was interviewed in Jul 2020.
I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.
My current position involves leading cross-functional teams and driving technical innovation.
I am responsible for leading a team of engineers in developing new products and technologies.
I work closely with other departments such as marketing and sales to ensure alignment on project goals.
I am involved in setting technical direction and strategy for the team, as well as mentoring junior engineers.
I have successfully imp...
I applied via Company Website and was interviewed in May 2019. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.
Test based on basic Mining knowledge
I applied via Indeed and was interviewed in Jul 2023. There were 2 interview rounds.
The erection of a cement mill involves the installation and assembly of the mill equipment and machinery.
The cement mill is typically a large cylindrical structure where raw materials are ground into fine powder.
The erection process includes the installation of the mill shell, liners, diaphragm, and grinding media.
Proper alignment and leveling of the mill components are crucial for efficient operation.
Electrical and me...
The procedure of erection involves the process of assembling and installing structural components to create a stable and functional structure.
Planning and preparation
Site preparation and foundation
Assembly of structural components
Installation of utilities and systems
Finishing and testing
Final inspection and handover
Planning of the erection involves creating a detailed plan for the construction process.
Identify the scope and objectives of the project
Determine the sequence of activities and their dependencies
Allocate resources and manpower
Create a schedule and timeline
Consider safety measures and risk management
Coordinate with other teams and stakeholders
Monitor progress and make adjustments as necessary
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Some of the top questions asked at the Unique Concrete Technologies Billing Engineer interview -
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Site Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Incharge
3
salaries
| ₹0 L/yr - ₹0 L/yr |
ACC
UltraTech Cement
Ambuja Cements
JK Cement