Filter interviews by
I applied via Referral and was interviewed before May 2021. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
posted on 16 May 2021
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
posted on 10 Jul 2022
I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 20 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
A random cylinder is a geometric shape defined by a random height and radius, often used in probability and statistics.
A random cylinder can be defined by its height (h) and radius (r), which can vary randomly.
In probability, random cylinders can model real-world phenomena, like the distribution of particles in a volume.
Example: If the height of a cylinder is uniformly distributed between 1 and 10 units, and the radius...
OEE stands for Overall Equipment Effectiveness, a metric used to measure manufacturing productivity.
OEE is calculated using three components: Availability, Performance, and Quality.
Availability = (Operating Time / Planned Production Time) x 100%. Example: If a machine runs for 8 hours but is down for 1 hour, availability is 87.5%.
Performance = (Actual Output / Maximum Possible Output) x 100%. Example: If a machine prod...
posted on 10 Aug 2022
I applied via Walk-in
based on 2 reviews
Rating in categories
Senior Engineer
76
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Deputy Engineer
33
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Junior Manager
31
salaries
| ₹3.2 L/yr - ₹4.7 L/yr |
Assistant Manager
20
salaries
| ₹3.6 L/yr - ₹6.5 L/yr |
Engineer
17
salaries
| ₹1.8 L/yr - ₹4 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda