Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
posted on 24 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
posted on 18 Nov 2023
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
posted on 18 Oct 2023
I applied via Referral and was interviewed in Sep 2023. There were 3 interview rounds.
posted on 14 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
The code of overlap of steel is IS:800-2007.
The code of overlap of steel is specified in IS:800-2007.
The code provides guidelines for the design and construction of steel structures.
It covers aspects such as material properties, design considerations, and construction practices.
Admixtures are chemicals added to concrete or mortar to modify its properties.
Admixtures can improve workability, durability, and strength of concrete.
They can reduce water content, increase setting time, or enhance color.
Examples include water-reducing admixtures, air-entraining admixtures, and accelerating admixtures.
posted on 21 Oct 2023
posted on 12 Oct 2021
I applied via Naukri.com and was interviewed before Oct 2020. There were 5 interview rounds.
posted on 4 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
Civil Site Engineer
9
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Executive Accountant
6
salaries
| ₹3 L/yr - ₹4 L/yr |
Civil Engineer
6
salaries
| ₹3.2 L/yr - ₹4.8 L/yr |
Accountant
5
salaries
| ₹2 L/yr - ₹4 L/yr |
Mechanical Engineer
5
salaries
| ₹1.8 L/yr - ₹2.7 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Reliance Industries