Filter interviews by
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed before Jun 2023. There were 3 interview rounds.
The quantity of steel in overhead tanks varies based on their capacities.
The quantity of steel required for an overhead tank depends on the size and shape of the tank.
Calculations involve determining the surface area of the tank walls and base, and the thickness of the steel used.
Different capacities of overhead tanks will require different amounts of steel.
For example, a 1000 liter tank will require less steel compare
The time it takes to finish an overhead tank depends on various factors such as size, materials used, labor availability, and weather conditions.
Factors affecting the time to finish an overhead tank include size of the tank, materials used, labor availability, and weather conditions.
For example, a small overhead tank made of concrete may take a few days to finish, while a larger tank made of steel could take weeks.
Effi...
Hydro pressure testing of a line involves filling the line with water and pressurizing it to check for leaks or weaknesses.
Fill the line with water to the required pressure level
Monitor the pressure for a specified duration to ensure it remains stable
Inspect the line for any leaks or weaknesses
Release the pressure and drain the water from the line after testing
Document the results and any necessary repairs or maintenan
High Density Polyethylene pipe
HDPE stands for High Density Polyethylene
HDPE pipes are commonly used in water supply, drainage, and gas distribution systems
They are known for their durability, flexibility, and resistance to corrosion
HDPE pipes are lightweight and easy to install, making them a popular choice in construction projects
Vendor development of execution work involves building relationships with vendors to ensure successful completion of project tasks.
Identify potential vendors who can provide the required services or products
Negotiate contracts and agreements with vendors to establish terms and conditions
Monitor vendor performance to ensure they meet project requirements and deadlines
Provide feedback to vendors to improve their performa...
Managed multiple projects simultaneously, overseeing timelines, budgets, and resources.
Led cross-functional teams to ensure project goals were met
Developed project plans and schedules
Monitored project progress and reported updates to stakeholders
Identified and resolved project issues and risks
Managed project budgets and resources effectively
I have researched the average salary range for Project Managers in this industry and location.
Researched average salary range for Project Managers in industry and location
Considered my experience, skills, and qualifications when determining salary expectations
Open to negotiation based on benefits package and growth opportunities
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
Analytical test is conducted to understand the candidate how well the though process in solving problems
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
posted on 12 Jul 2022
I applied via LinkedIn and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 12 Jan 2025
posted on 29 Dec 2023
I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before Jun 2023. There were 3 interview rounds.
The quantity of steel in overhead tanks varies based on their capacities.
The quantity of steel required for an overhead tank depends on the size and shape of the tank.
Calculations involve determining the surface area of the tank walls and base, and the thickness of the steel used.
Different capacities of overhead tanks will require different amounts of steel.
For example, a 1000 liter tank will require less steel compare
The time it takes to finish an overhead tank depends on various factors such as size, materials used, labor availability, and weather conditions.
Factors affecting the time to finish an overhead tank include size of the tank, materials used, labor availability, and weather conditions.
For example, a small overhead tank made of concrete may take a few days to finish, while a larger tank made of steel could take weeks.
Effi...
Hydro pressure testing of a line involves filling the line with water and pressurizing it to check for leaks or weaknesses.
Fill the line with water to the required pressure level
Monitor the pressure for a specified duration to ensure it remains stable
Inspect the line for any leaks or weaknesses
Release the pressure and drain the water from the line after testing
Document the results and any necessary repairs or maintenan
High Density Polyethylene pipe
HDPE stands for High Density Polyethylene
HDPE pipes are commonly used in water supply, drainage, and gas distribution systems
They are known for their durability, flexibility, and resistance to corrosion
HDPE pipes are lightweight and easy to install, making them a popular choice in construction projects
Vendor development of execution work involves building relationships with vendors to ensure successful completion of project tasks.
Identify potential vendors who can provide the required services or products
Negotiate contracts and agreements with vendors to establish terms and conditions
Monitor vendor performance to ensure they meet project requirements and deadlines
Provide feedback to vendors to improve their performa...
Managed multiple projects simultaneously, overseeing timelines, budgets, and resources.
Led cross-functional teams to ensure project goals were met
Developed project plans and schedules
Monitored project progress and reported updates to stakeholders
Identified and resolved project issues and risks
Managed project budgets and resources effectively
I have researched the average salary range for Project Managers in this industry and location.
Researched average salary range for Project Managers in industry and location
Considered my experience, skills, and qualifications when determining salary expectations
Open to negotiation based on benefits package and growth opportunities
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 3 interview rounds.
I have experience in identifying and managing risks and issues in various projects.
Conducted risk assessments and created mitigation plans for a software development project
Identified a potential issue with a vendor's delivery timeline and proactively communicated with stakeholders to find a solution
Managed a team to address a critical issue with a product launch and successfully resolved the issue within the deadline
I...
There are three types of PMO: Supportive, Controlling, and Directive.
Supportive PMO provides support and guidance to project managers.
Controlling PMO monitors and controls project management processes.
Directive PMO takes control of the projects and manages them directly.
PMOs can also be categorized as enterprise, departmental, or project-specific.
Enterprise PMO manages organization-wide projects and programs.
Department...
Handled tough situations by actively listening, empathizing, and finding creative solutions.
Actively listened to the customer's concerns and frustrations
Empathized with the customer's emotions and validated their feelings
Identified the root cause of the problem and proposed creative solutions
Collaborated with the team to implement the solutions effectively
Followed up with the customer to ensure their satisfaction
Network deployment strategies involve planning, designing, and implementing a network infrastructure. Risks include security breaches, downtime, and compatibility issues.
Network deployment strategies involve assessing business needs and designing a network infrastructure that meets those needs.
Risks include security breaches, which can compromise sensitive data and damage the organization's reputation.
Downtime can resu...
Yes
Yes, I am willing to relocate for the right opportunity.
I am also open to working UK shifts as required.
I left my last job due to limited growth opportunities and a desire for new challenges.
Inclusiveness means creating an environment where everyone feels valued and respected.
Inclusiveness involves actively seeking out and including diverse perspectives and backgrounds.
It means ensuring that everyone has equal opportunities to participate and contribute.
Inclusiveness requires open communication, empathy, and a willingness to learn from others.
Examples of inclusiveness in project management include involvin...
based on 7 reviews
Rating in categories
Project Coordinator
82
salaries
| ₹2.8 L/yr - ₹5 L/yr |
QA Analyst
49
salaries
| ₹3 L/yr - ₹8.9 L/yr |
Project Manager
40
salaries
| ₹4.6 L/yr - ₹12 L/yr |
Junior Project Manager
33
salaries
| ₹4 L/yr - ₹7 L/yr |
Clinical Document Specialist
29
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Sterlite Technologies
Indus Towers
Nokia Networks
Cisco