The bill of material for a 1 KM 11 KV line includes various components such as conductors, insulators, transformers, and poles.
Conductors: Copper or aluminum cables used to transmit electricity.
Insulators: Materials like porcelain or polymer used to support and isolate the conductors.
Transformers: Devices used to step up or step down the voltage.
Poles: Structures to support the conductors and maintain their position.
Ot...
The bill of material for a 1 KM AB cable line includes various components.
The cable itself
Insulators
Connectors
Poles or towers
Grounding equipment
Hardware such as bolts and clamps
Tools for installation
Safety equipment
Transportation costs
Labor costs
The bill of material for a 1KM underground line with 33KV, 11KV, and LT lines.
The bill of material should include all necessary components for the underground line.
Components may include cables, transformers, switchgear, and other electrical equipment.
The quantity of each component should be specified in the bill of material.
The bill of material should also include any necessary accessories such as clamps, connectors,
Testing and commissioning of RMU and relay setting is a crucial aspect of project engineering.
Testing and commissioning of RMU involves verifying the functionality of the switchgear and ensuring it is safe for operation.
Relay setting involves configuring the protection relays to ensure they operate correctly in the event of a fault.
Testing and commissioning should be carried out in accordance with relevant standards an...
A lightning arrestor is a device used to protect electrical equipment from lightning strikes.
It is also known as a surge arrester or lightning diverter.
It works by providing a low-impedance path for lightning current to flow to the ground.
It is commonly used in power distribution systems, telecommunication networks, and buildings.
Examples include metal oxide varistors, gas discharge tubes, and carbon block arrestors.
Discharge rods are grounding devices used to discharge static electricity from equipment or machinery.
Also known as grounding rods or earthing rods
Typically made of copper or aluminum
Used in industries such as oil and gas, chemical, and manufacturing
Prevents damage to equipment and potential safety hazards
Example: Discharge rods are commonly used in refineries to prevent explosions caused by static electricity buildup.
The size of conductors and cables is an important factor in determining their electrical properties and performance.
The size of a conductor is determined by its cross-sectional area, which affects its resistance and current-carrying capacity.
Cable size is determined by the current it needs to carry and the distance it needs to travel.
Larger conductors and cables can carry more current and have lower resistance, but may...
GTP is a protocol used in cellular communication. MQP and FQP are not commonly used acronyms.
GTP stands for GPRS Tunnelling Protocol
It is used in cellular communication to allow data transfer between different networks
MQP and FQP are not commonly used acronyms and may refer to specific organizations or products
HDD machine is a drilling machine used for horizontal directional drilling.
HDD stands for Horizontal Directional Drilling
It is used for underground drilling without disturbing the surface
It is commonly used for laying pipelines, cables, and conduits
The machine uses a drill stem and a drilling fluid to bore through the ground
It requires skilled operators and engineers to operate and plan the drilling process
Jointing of cables and conductors is a crucial aspect of project engineering.
Jointing involves connecting two or more cables or conductors to ensure continuity of electrical flow.
Various methods of jointing include crimping, soldering, and welding.
Factors such as the type of cable, voltage, and current capacity must be considered when selecting a jointing method.
Proper insulation and sealing of joints is essential to p...
Experienced project engineer with a background in civil engineering and a passion for problem-solving and team collaboration.
Bachelor's degree in Civil Engineering
5+ years of experience in project management
Proficient in AutoCAD and project management software
Strong communication and leadership skills
Successfully led a team in completing a major infrastructure project on time and within budget
I applied via Walk-in and was interviewed before Jun 2023. There were 3 interview rounds.
The quantity of steel in overhead tanks varies based on their capacities.
The quantity of steel required for an overhead tank depends on the size and shape of the tank.
Calculations involve determining the surface area of the tank walls and base, and the thickness of the steel used.
Different capacities of overhead tanks will require different amounts of steel.
For example, a 1000 liter tank will require less steel compare
The time it takes to finish an overhead tank depends on various factors such as size, materials used, labor availability, and weather conditions.
Factors affecting the time to finish an overhead tank include size of the tank, materials used, labor availability, and weather conditions.
For example, a small overhead tank made of concrete may take a few days to finish, while a larger tank made of steel could take weeks.
Effi...
Hydro pressure testing of a line involves filling the line with water and pressurizing it to check for leaks or weaknesses.
Fill the line with water to the required pressure level
Monitor the pressure for a specified duration to ensure it remains stable
Inspect the line for any leaks or weaknesses
Release the pressure and drain the water from the line after testing
Document the results and any necessary repairs or maintenan
High Density Polyethylene pipe
HDPE stands for High Density Polyethylene
HDPE pipes are commonly used in water supply, drainage, and gas distribution systems
They are known for their durability, flexibility, and resistance to corrosion
HDPE pipes are lightweight and easy to install, making them a popular choice in construction projects
Vendor development of execution work involves building relationships with vendors to ensure successful completion of project tasks.
Identify potential vendors who can provide the required services or products
Negotiate contracts and agreements with vendors to establish terms and conditions
Monitor vendor performance to ensure they meet project requirements and deadlines
Provide feedback to vendors to improve their performa...
Managed multiple projects simultaneously, overseeing timelines, budgets, and resources.
Led cross-functional teams to ensure project goals were met
Developed project plans and schedules
Monitored project progress and reported updates to stakeholders
Identified and resolved project issues and risks
Managed project budgets and resources effectively
I have researched the average salary range for Project Managers in this industry and location.
Researched average salary range for Project Managers in industry and location
Considered my experience, skills, and qualifications when determining salary expectations
Open to negotiation based on benefits package and growth opportunities
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
Analytical test is conducted to understand the candidate how well the though process in solving problems
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 3 interview rounds.
I have experience in identifying and managing risks and issues in various projects.
Conducted risk assessments and created mitigation plans for a software development project
Identified a potential issue with a vendor's delivery timeline and proactively communicated with stakeholders to find a solution
Managed a team to address a critical issue with a product launch and successfully resolved the issue within the deadline
I...
There are three types of PMO: Supportive, Controlling, and Directive.
Supportive PMO provides support and guidance to project managers.
Controlling PMO monitors and controls project management processes.
Directive PMO takes control of the projects and manages them directly.
PMOs can also be categorized as enterprise, departmental, or project-specific.
Enterprise PMO manages organization-wide projects and programs.
Department...
Handled tough situations by actively listening, empathizing, and finding creative solutions.
Actively listened to the customer's concerns and frustrations
Empathized with the customer's emotions and validated their feelings
Identified the root cause of the problem and proposed creative solutions
Collaborated with the team to implement the solutions effectively
Followed up with the customer to ensure their satisfaction
Network deployment strategies involve planning, designing, and implementing a network infrastructure. Risks include security breaches, downtime, and compatibility issues.
Network deployment strategies involve assessing business needs and designing a network infrastructure that meets those needs.
Risks include security breaches, which can compromise sensitive data and damage the organization's reputation.
Downtime can resu...
Yes
Yes, I am willing to relocate for the right opportunity.
I am also open to working UK shifts as required.
I left my last job due to limited growth opportunities and a desire for new challenges.
Inclusiveness means creating an environment where everyone feels valued and respected.
Inclusiveness involves actively seeking out and including diverse perspectives and backgrounds.
It means ensuring that everyone has equal opportunities to participate and contribute.
Inclusiveness requires open communication, empathy, and a willingness to learn from others.
Examples of inclusiveness in project management include involvin...
I applied via LinkedIn and was interviewed before May 2023. There were 2 interview rounds.
Maths , logical , english
based on 1 interview
Interview experience
based on 11 reviews
Rating in categories
Project Coordinator
83
salaries
| ₹2.8 L/yr - ₹5 L/yr |
QA Analyst
49
salaries
| ₹3 L/yr - ₹8 L/yr |
Project Manager
43
salaries
| ₹4.6 L/yr - ₹12 L/yr |
Junior Project Manager
35
salaries
| ₹4 L/yr - ₹7 L/yr |
Clinical Document Specialist
32
salaries
| ₹2 L/yr - ₹4 L/yr |
Sterlite Technologies
Indus Towers
Cisco
BT Business