Upload Button Icon Add office photos

Filter interviews by

TransPerfect Project Coordinator Interview Questions and Answers

Updated 8 Nov 2024

TransPerfect Project Coordinator Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
Round 2 - Technical 

(1 Question)

  • Q1. Tell me how did you handle clients?

Project Coordinator Jobs at TransPerfect

View all

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. They are asking for my previous experience details & FTTH,NLD,MT, related questions

I applied via Naukri.com and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Oprical fiber

Interview Preparation Tips

Interview preparation tips for other job seekers - All question od OFC project , Rout survey, ROW solve, T&D (HDD, OT) ,blowing ,spliceing,chamber & Rout markar installation,Rout AT, and all rout document part

Interview Questionnaire 

23 Questions

  • Q1. Bill of material of 1 KM 11 KV line
  • Ans. 

    The bill of material for a 1 KM 11 KV line includes various components such as conductors, insulators, transformers, and poles.

    • Conductors: Copper or aluminum cables used to transmit electricity.

    • Insulators: Materials like porcelain or polymer used to support and isolate the conductors.

    • Transformers: Devices used to step up or step down the voltage.

    • Poles: Structures to support the conductors and maintain their position.

    • Ot...

  • Answered by AI
  • Q2. Bill of material of 1 KM AB cable line
  • Ans. 

    The bill of material for a 1 KM AB cable line includes various components.

    • The cable itself

    • Insulators

    • Connectors

    • Poles or towers

    • Grounding equipment

    • Hardware such as bolts and clamps

    • Tools for installation

    • Safety equipment

    • Transportation costs

    • Labor costs

  • Answered by AI
  • Q3. Bill of material of 1KM underground line 33 KV ,11,KV,LT lines
  • Ans. 

    The bill of material for a 1KM underground line with 33KV, 11KV, and LT lines.

    • The bill of material should include all necessary components for the underground line.

    • Components may include cables, transformers, switchgear, and other electrical equipment.

    • The quantity of each component should be specified in the bill of material.

    • The bill of material should also include any necessary accessories such as clamps, connectors,

  • Answered by AI
  • Q4. Testing commissioning of RMU ,relay setting
  • Ans. 

    Testing and commissioning of RMU and relay setting is a crucial aspect of project engineering.

    • Testing and commissioning of RMU involves verifying the functionality of the switchgear and ensuring it is safe for operation.

    • Relay setting involves configuring the protection relays to ensure they operate correctly in the event of a fault.

    • Testing and commissioning should be carried out in accordance with relevant standards an...

  • Answered by AI
  • Q5. Transformer earthing
  • Q6. What is lightning arrestor
  • Ans. 

    A lightning arrestor is a device used to protect electrical equipment from lightning strikes.

    • It is also known as a surge arrester or lightning diverter.

    • It works by providing a low-impedance path for lightning current to flow to the ground.

    • It is commonly used in power distribution systems, telecommunication networks, and buildings.

    • Examples include metal oxide varistors, gas discharge tubes, and carbon block arrestors.

  • Answered by AI
  • Q7. Soil conductivity test
  • Q8. Transformer testing
  • Q9. ACSR conductor testing ABC testing Pannel testing Structure testing
  • Q10. Earthing Earthing of transformer Earthing of lightning arrester Earthing of sub station Earthing of single pole Earthing of pannels
  • Q11. What is discharge rods
  • Ans. 

    Discharge rods are grounding devices used to discharge static electricity from equipment or machinery.

    • Also known as grounding rods or earthing rods

    • Typically made of copper or aluminum

    • Used in industries such as oil and gas, chemical, and manufacturing

    • Prevents damage to equipment and potential safety hazards

    • Example: Discharge rods are commonly used in refineries to prevent explosions caused by static electricity buildup.

  • Answered by AI
  • Q12. Size of conductors Size of cables
  • Ans. 

    The size of conductors and cables is an important factor in determining their electrical properties and performance.

    • The size of a conductor is determined by its cross-sectional area, which affects its resistance and current-carrying capacity.

    • Cable size is determined by the current it needs to carry and the distance it needs to travel.

    • Larger conductors and cables can carry more current and have lower resistance, but may...

  • Answered by AI
  • Q13. What is GTP What is MQP What is FQP
  • Ans. 

    GTP is a protocol used in cellular communication. MQP and FQP are not commonly used acronyms.

    • GTP stands for GPRS Tunnelling Protocol

    • It is used in cellular communication to allow data transfer between different networks

    • MQP and FQP are not commonly used acronyms and may refer to specific organizations or products

  • Answered by AI
  • Q14. Transformer oil testing
  • Q15. Cable insulation testing Continuity testing High pot test
  • Q16. What is HDD machine
  • Ans. 

    HDD machine is a drilling machine used for horizontal directional drilling.

    • HDD stands for Horizontal Directional Drilling

    • It is used for underground drilling without disturbing the surface

    • It is commonly used for laying pipelines, cables, and conduits

    • The machine uses a drill stem and a drilling fluid to bore through the ground

    • It requires skilled operators and engineers to operate and plan the drilling process

  • Answered by AI
  • Q17. PSC pole STP pole RS joist pole Rail pole
  • Q18. HDPE PIPE GI PIPE PLB duct
  • Q19. Chemical earthing Electrical earthing
  • Q20. Jointing of cables Jointing of conductors
  • Ans. 

    Jointing of cables and conductors is a crucial aspect of project engineering.

    • Jointing involves connecting two or more cables or conductors to ensure continuity of electrical flow.

    • Various methods of jointing include crimping, soldering, and welding.

    • Factors such as the type of cable, voltage, and current capacity must be considered when selecting a jointing method.

    • Proper insulation and sealing of joints is essential to p...

  • Answered by AI
  • Q21. Tell me about yourself
  • Ans. 

    Experienced project engineer with a background in civil engineering and a passion for problem-solving and team collaboration.

    • Bachelor's degree in Civil Engineering

    • 5+ years of experience in project management

    • Proficient in AutoCAD and project management software

    • Strong communication and leadership skills

    • Successfully led a team in completing a major infrastructure project on time and within budget

  • Answered by AI
  • Q22. Previous company and project details
  • Q23. Salary discussion

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 3 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. Quantity of steel in over head tanks of various capacities.
  • Ans. 

    The quantity of steel in overhead tanks varies based on their capacities.

    • The quantity of steel required for an overhead tank depends on the size and shape of the tank.

    • Calculations involve determining the surface area of the tank walls and base, and the thickness of the steel used.

    • Different capacities of overhead tanks will require different amounts of steel.

    • For example, a 1000 liter tank will require less steel compare

  • Answered by AI
  • Q2. How many days a over head tank take to finish?
  • Ans. 

    The time it takes to finish an overhead tank depends on various factors such as size, materials used, labor availability, and weather conditions.

    • Factors affecting the time to finish an overhead tank include size of the tank, materials used, labor availability, and weather conditions.

    • For example, a small overhead tank made of concrete may take a few days to finish, while a larger tank made of steel could take weeks.

    • Effi...

  • Answered by AI
  • Q3. Process of hydro pressure tesing of line .
  • Ans. 

    Hydro pressure testing of a line involves filling the line with water and pressurizing it to check for leaks or weaknesses.

    • Fill the line with water to the required pressure level

    • Monitor the pressure for a specified duration to ensure it remains stable

    • Inspect the line for any leaks or weaknesses

    • Release the pressure and drain the water from the line after testing

    • Document the results and any necessary repairs or maintenan

  • Answered by AI
  • Q4. Full form of HDPE pipe .
  • Ans. 

    High Density Polyethylene pipe

    • HDPE stands for High Density Polyethylene

    • HDPE pipes are commonly used in water supply, drainage, and gas distribution systems

    • They are known for their durability, flexibility, and resistance to corrosion

    • HDPE pipes are lightweight and easy to install, making them a popular choice in construction projects

  • Answered by AI
  • Q5. Process of air valve, sluice valve and scour valve and fire hydrant fixing .
Round 2 - Technical 

(2 Questions)

  • Q1. Vendor development of execution work .
  • Ans. 

    Vendor development of execution work involves building relationships with vendors to ensure successful completion of project tasks.

    • Identify potential vendors who can provide the required services or products

    • Negotiate contracts and agreements with vendors to establish terms and conditions

    • Monitor vendor performance to ensure they meet project requirements and deadlines

    • Provide feedback to vendors to improve their performa...

  • Answered by AI
  • Q2. Team management
Round 3 - HR 

(3 Questions)

  • Q1. Previous employment salery
  • Q2. Previous employment roles and responsibilities
  • Ans. 

    Managed multiple projects simultaneously, overseeing timelines, budgets, and resources.

    • Led cross-functional teams to ensure project goals were met

    • Developed project plans and schedules

    • Monitored project progress and reported updates to stakeholders

    • Identified and resolved project issues and risks

    • Managed project budgets and resources effectively

  • Answered by AI
  • Q3. Expectations of salery
  • Ans. 

    I have researched the average salary range for Project Managers in this industry and location.

    • Researched average salary range for Project Managers in industry and location

    • Considered my experience, skills, and qualifications when determining salary expectations

    • Open to negotiation based on benefits package and growth opportunities

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. 1m3 concrete use cement
  • Q2. 1sqm2 plaster use cement kg

Interview Questionnaire 

1 Question

  • Q1. Basic knowledge of PM, Risk MGT, People MGT, scenario base

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, communication
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Analytical test is conducted to understand the candidate how well the though process in solving problems

Round 3 - One-on-one 

(2 Questions)

  • Q1. Walk me through your CV
  • Q2. Why do you want to join BT.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep a clear thought and do not make up bookish knowledge if u have not been working on some technology.

I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Give past examples or risk and issue management
  • Ans. 

    I have experience in identifying and managing risks and issues in various projects.

    • Conducted risk assessments and created mitigation plans for a software development project

    • Identified a potential issue with a vendor's delivery timeline and proactively communicated with stakeholders to find a solution

    • Managed a team to address a critical issue with a product launch and successfully resolved the issue within the deadline

    • I...

  • Answered by AI
  • Q2. What are different types of PMO
  • Ans. 

    There are three types of PMO: Supportive, Controlling, and Directive.

    • Supportive PMO provides support and guidance to project managers.

    • Controlling PMO monitors and controls project management processes.

    • Directive PMO takes control of the projects and manages them directly.

    • PMOs can also be categorized as enterprise, departmental, or project-specific.

    • Enterprise PMO manages organization-wide projects and programs.

    • Department...

  • Answered by AI
  • Q3. Give past example of how you handled tough situations or customers
  • Ans. 

    Handled tough situations by actively listening, empathizing, and finding creative solutions.

    • Actively listened to the customer's concerns and frustrations

    • Empathized with the customer's emotions and validated their feelings

    • Identified the root cause of the problem and proposed creative solutions

    • Collaborated with the team to implement the solutions effectively

    • Followed up with the customer to ensure their satisfaction

  • Answered by AI
  • Q4. Network deployment strategies and risks
  • Ans. 

    Network deployment strategies involve planning, designing, and implementing a network infrastructure. Risks include security breaches, downtime, and compatibility issues.

    • Network deployment strategies involve assessing business needs and designing a network infrastructure that meets those needs.

    • Risks include security breaches, which can compromise sensitive data and damage the organization's reputation.

    • Downtime can resu...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Willing to relocate, ok with UK shifts, why did you leave your last job etc
  • Ans. 

    Yes

    • Yes, I am willing to relocate for the right opportunity.

    • I am also open to working UK shifts as required.

    • I left my last job due to limited growth opportunities and a desire for new challenges.

  • Answered by AI
  • Q2. What does "inclusiveness" mean to you?
  • Ans. 

    Inclusiveness means creating an environment where everyone feels valued and respected.

    • Inclusiveness involves actively seeking out and including diverse perspectives and backgrounds.

    • It means ensuring that everyone has equal opportunities to participate and contribute.

    • Inclusiveness requires open communication, empathy, and a willingness to learn from others.

    • Examples of inclusiveness in project management include involvin...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your 1-min pitch ready for each interview round. Explain your experiences and showcase how it fits with the job description. Give past work examples to behavioural questions, back your claims with figures/stats. Don't give overly generalized or vague answers to interview questions. Dress to impress and maintain positive attitude. BT HR doesn't negotiate much with their offer and they can rescind it anytime so beware of it.

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Maths , logical , english

Round 2 - Technical 

(1 Question)

  • Q1. Prince 2 and ITIL related question

Interview Preparation Tips

Interview preparation tips for other job seekers - Domain Related scenario based question

TransPerfect Interview FAQs

How many rounds are there in TransPerfect Project Coordinator interview?
TransPerfect interview process usually has 2 rounds. The most common rounds in the TransPerfect interview process are HR and Technical.
How to prepare for TransPerfect Project Coordinator interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at TransPerfect. The most common topics and skills that interviewers at TransPerfect expect are Project Coordination, Project Documentation, Budgeting, Project Management and Proof Reading.

Tell us how to improve this page.

TransPerfect Project Coordinator Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Cisco Interview Questions
4.2
 • 375 Interviews
Indus Towers Interview Questions
3.8
 • 183 Interviews
Nvidia Interview Questions
3.7
 • 108 Interviews
BT Business Interview Questions
4.0
 • 81 Interviews
Arista Networks Interview Questions
4.2
 • 43 Interviews
View all
TransPerfect Project Coordinator Salary
based on 83 salaries
₹2.8 L/yr - ₹5 L/yr
22% less than the average Project Coordinator Salary in India
View more details

TransPerfect Project Coordinator Reviews and Ratings

based on 11 reviews

3.2/5

Rating in categories

3.1

Skill development

3.1

Work-life balance

2.9

Salary

3.6

Job security

3.4

Company culture

2.9

Promotions

3.3

Work satisfaction

Explore 11 Reviews and Ratings
Project Coordinator
83 salaries
unlock blur

₹2.8 L/yr - ₹5 L/yr

QA Analyst
49 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Project Manager
43 salaries
unlock blur

₹4.6 L/yr - ₹12 L/yr

Junior Project Manager
35 salaries
unlock blur

₹4 L/yr - ₹7 L/yr

Clinical Document Specialist
32 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Explore more salaries
Compare TransPerfect with

Sterlite Technologies

3.8
Compare

Indus Towers

3.8
Compare

Cisco

4.2
Compare

BT Business

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview