I was interviewed in Dec 2021.
Machining techniques and toolings are essential for efficient planning and execution of manufacturing processes.
Machining techniques involve cutting, drilling, shaping, and finishing of materials using various tools and machines.
Toolings refer to the tools and equipment used in machining processes, such as drills, lathes, milling machines, and grinders.
Proper selection and use of machining techniques and toolings can i...
Top trending discussions
posted on 5 Jun 2024
Optimistic costing involves estimating project costs on the lower end of the spectrum.
Identify all potential cost-saving measures and efficiencies in the project plan.
Use historical data and benchmarks to estimate costs on the lower side.
Consider best-case scenarios and optimistic assumptions when estimating costs.
Collaborate with stakeholders to gather insights and input on cost-saving opportunities.
Regularly review a...
posted on 25 Jun 2024
Grid code defines technical requirements for connecting to the grid. Critical path is the longest sequence of tasks determining project duration. Project performance measures how well project objectives are being met.
Grid code sets out technical standards and requirements for connecting power plants to the grid
Critical path is the longest sequence of tasks that determines the overall duration of a project
Project perfor...
Managing clients involves clear communication, setting expectations, building relationships, and delivering results.
Establish clear communication channels with the client to ensure understanding of project goals and timelines
Set realistic expectations and manage client's expectations throughout the project
Build a strong relationship with the client based on trust and transparency
Regularly update the client on project p...
posted on 5 Jun 2024
Optimistic costing involves estimating project costs on the lower end of the spectrum.
Identify all potential cost-saving measures and efficiencies in the project plan.
Use historical data and benchmarks to estimate costs on the lower side.
Consider best-case scenarios and optimistic assumptions when estimating costs.
Collaborate with stakeholders to gather insights and input on cost-saving opportunities.
Regularly review a...
Electrical Engineer
5
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Quality Engineer
4
salaries
| ₹1.8 L/yr - ₹1.9 L/yr |
Design Engineer
3
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Huawei Technologies
ABCI Infrastructures
Marelli
Seoyon E-hwa Automotive