Q1. what is one point lesson in Ncc parts
One point lesson in Ncc parts is a concise and easy-to-understand instruction on how to improve quality and productivity.
It is a single-page document that summarizes a specific improvement idea.
It is used to train employees and ensure consistent implementation of best practices.
Examples include reducing defects, improving cycle time, and increasing efficiency.
It is an effective tool for continuous improvement in manufacturing processes.
Q2. what is sop in displayed machine
SOP in displayed machine refers to Standard Operating Procedure for operating the machine.
SOP is a set of step-by-step instructions for operating the machine.
It ensures consistency in operation and reduces the risk of errors.
SOP includes safety instructions, maintenance procedures, and troubleshooting steps.
Examples of displayed machines include medical equipment, manufacturing machinery, and computer systems.
Q3. How to handle 7qc tools
The 7QC tools are used to identify and solve quality problems. They include flowcharts, histograms, Pareto charts, and more.
Understand the purpose of each tool and when to use them
Collect and analyze data using the appropriate tool
Use the tools to identify the root cause of quality problems
Implement solutions based on the findings
Continuously monitor and improve the process
Examples of tools include flowcharts, histograms, Pareto charts, control charts, scatter diagrams, cause...read more
Q4. How to summit g8d
G8D (Global 8D) is a problem-solving methodology used to identify, correct, and eliminate recurring problems.
Define the problem and establish a team
Containment action to prevent further issues
Root cause analysis and corrective action
Implement corrective action and verify effectiveness
Prevent recurrence and congratulate the team
Document the process and share the learning
Q5. Hoe to handle ppm in monthly
PPM can be handled in monthly by tracking the number of defects and dividing it by the total number of units produced in a month.
Calculate the total number of units produced in a month
Track the number of defects in the same month
Divide the number of defects by the total number of units produced and multiply by 1,000,000 to get PPM
Analyze the PPM trend over time to identify areas for improvement
Q6. what is mean by QARP
QARP stands for Quality Assurance Review Process.
QARP is a systematic approach to evaluate and improve the quality of a product or service.
It involves reviewing and analyzing processes, procedures, and documentation to identify areas for improvement.
QARP helps to ensure that products and services meet customer requirements and comply with industry standards.
Examples of QARP activities include audits, inspections, and testing.
QARP is an important part of quality management sys...read more
Q7. How did you compress schedule duration ?
Q8. Power plant project life cycle
The power plant project life cycle involves planning, design, construction, operation, and decommissioning.
Planning phase involves site selection, feasibility studies, and obtaining permits.
Design phase includes creating detailed engineering plans and selecting equipment.
Construction phase involves building the power plant according to the design.
Operation phase includes testing, commissioning, and regular maintenance.
Decommissioning phase involves shutting down the plant and...read more
Q9. How to handle pressure
I handle pressure by prioritizing tasks, taking breaks, and seeking support when needed.
I prioritize tasks based on urgency and importance
I take breaks to clear my mind and recharge
I seek support from colleagues or supervisors when necessary
I practice stress-reducing techniques such as meditation or exercise
I maintain a positive attitude and focus on solutions rather than problems
Q10. What is permanent noukri
Q11. Turbine erection procedure.
The turbine erection procedure involves the step-by-step process of assembling and installing a turbine.
Prepare the foundation for the turbine installation
Assemble the turbine components, including the rotor, blades, and generator
Install the turbine tower and secure it to the foundation
Connect the turbine to the electrical grid
Perform necessary tests and inspections to ensure proper functioning
Q12. Site management practices
Site management practices involve overseeing and coordinating various aspects of a site to ensure efficiency and safety.
Developing and implementing site policies and procedures
Managing site resources and equipment
Ensuring compliance with safety regulations
Coordinating with different teams and stakeholders
Monitoring and evaluating site performance
Addressing any issues or challenges that arise
Q13. What is Sallrey