Add office photos
Torrent Power logo
Engaged Employer

Torrent Power

Verified
3.7
based on 1.5k Reviews
Video summary
Filter interviews by
Executive
Experienced
Clear (1)

Torrent Power Executive Interview Questions and Answers

Updated 6 Jan 2025

Q1. Ratings & specifications of different electrical equipment which u hve mentioned in the cv

Ans.

I have mentioned ratings and specifications of various electrical equipment in my CV.

  • I have mentioned the voltage and current ratings of transformers and motors.

  • I have listed the power ratings and efficiency of generators and inverters.

  • I have included the frequency and phase ratings of electrical systems.

  • I have specified the insulation class and protection rating of electrical equipment.

  • I have mentioned the type and size of cables and wires used in electrical installations.

Add your answer
right arrow

Q2. Processes and valuable approach which was taken by you in it?

Ans.

Implemented a streamlined project management process to increase efficiency and productivity.

  • Introduced weekly project status meetings to ensure alignment and accountability

  • Utilized project management software to track progress and identify bottlenecks

  • Established clear communication channels for team members to collaborate effectively

Add your answer
right arrow

Q3. What you know about torrent group and power

Ans.

Torrent groups are online communities that share files through the BitTorrent protocol, often involving copyrighted material. Power within these groups can refer to influence, control, or hierarchy.

  • Torrent groups are online communities that use the BitTorrent protocol to share files.

  • These groups often involve sharing copyrighted material, leading to legal issues.

  • Power within torrent groups can refer to influence over the community, control of resources, or hierarchy among mem...read more

Add your answer
right arrow

Q4. Types of O&M in power distribution

Ans.

There are two types of O&M in power distribution: preventive and corrective.

  • Preventive maintenance involves regular inspections, testing, and servicing of equipment to prevent breakdowns and prolong the life of the equipment.

  • Corrective maintenance involves repairing or replacing equipment that has failed or is not functioning properly.

  • Examples of preventive maintenance include cleaning and lubricating equipment, tightening connections, and replacing worn parts.

  • Examples of cor...read more

View 1 answer
right arrow
Discover Torrent Power interview dos and don'ts from real experiences

Q5. Load capacity of transformer

Ans.

Load capacity of a transformer depends on its kVA rating and voltage level.

  • The load capacity of a transformer is measured in kVA (kilovolt-amperes).

  • The higher the kVA rating of a transformer, the greater its load capacity.

  • The voltage level of a transformer also affects its load capacity.

  • For example, a 500 kVA transformer with a voltage level of 480V has a load capacity of 625 amps.

  • Transformers can be overloaded, which can cause damage or failure.

  • It is important to properly si...read more

Add your answer
right arrow

Q6. Transformer tests describe in brief

Ans.

Transformer tests are conducted to ensure the transformer's performance and reliability.

  • Transformer turns ratio test checks the turns ratio between primary and secondary windings.

  • Insulation resistance test measures the insulation resistance between windings and ground.

  • Transformer winding resistance test measures the resistance of the windings.

  • Transformer polarity test checks the polarity of the windings.

  • Transformer open circuit and short circuit tests determine the equivalent...read more

Add your answer
right arrow

Q7. Types of conductor

Ans.

Conductors can be classified into different types based on their properties and applications.

  • Metallic conductors: copper, aluminum, silver, gold

  • Non-metallic conductors: graphite, electrolytes

  • Superconductors: zero resistance at low temperatures

  • Semiconductors: intermediate conductivity

  • Insulators: high resistance to electric current

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Torrent Power Executive

based on 15 interviews
3 Interview rounds
Technical Round - 1
HR Round
Technical Round - 2
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Executive Interview Questions from Similar Companies

MSN Laboratories Logo
3.7
 • 20 Interview Questions
Aurobindo Pharma Logo
4.0
 • 13 Interview Questions
Cipla Logo
4.1
 • 11 Interview Questions
View all
Recently Viewed
LIST OF COMPANIES
Credit Bajaar
Overview
PHOTOS
InsuranceDekho
3 office photos
INTERVIEWS
Torrent Power
No Interviews
JOBS
Shree Shakambari Ferro Alloys
No Jobs
INTERVIEWS
Torrent Power
No Interviews
LIST OF COMPANIES
Siemens Gamesa Renewable Power Private Limited
Overview
LIST OF COMPANIES
Power Grid Corporation of India
Overview
JOBS
Siemens Gamesa Renewable Power Private Limited
No Jobs
JOBS
Siemens Gamesa Renewable Power Private Limited
No Jobs
INTERVIEWS
Wind World
No Interviews
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter