Filter interviews by
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
List and graph algorithm
General maths
Top trending discussions
I applied via Naukri.com and was interviewed in Sep 2024. There were 3 interview rounds.
I designed HMI screens by first understanding user requirements, creating wireframes, selecting appropriate design tools, and conducting user testing.
Understand user requirements before starting the design process
Create wireframes to visualize layout and functionality
Select appropriate design tools such as Adobe XD or Sketch
Conduct user testing to gather feedback and make necessary adjustments
CV2X, CV2I, CV2G are different communication technologies used in the automotive industry for vehicle-to-everything communication.
CV2X stands for Cellular Vehicle-to-Everything and uses cellular networks for communication between vehicles, infrastructure, pedestrians, and other devices.
CV2I stands for Cellular Vehicle-to-Infrastructure and focuses on communication between vehicles and infrastructure such as traffic lig...
I have extensive experience working onsite at various client locations, collaborating with cross-functional teams to deliver successful projects.
Managed onsite team to ensure project milestones were met
Facilitated communication between onsite and offsite teams
Resolved technical issues on-site to keep project on track
I performed bench testing on various components to ensure functionality and reliability.
Tested electronic components for voltage and current levels
Conducted stress tests on mechanical parts to assess durability
Analyzed data from bench tests to identify any issues or improvements needed
Yes, I am willing to travel to Trivandrum for the role of Lead Engineer.
I am open to travel for work opportunities
I have previous experience traveling for work
I am excited about the prospect of working in Trivandrum
I have appeared for interviews at companies like Google, Amazon, and Microsoft.
Amazon
Microsoft
Unresolved reference is an error in programming where a variable or function is used without being defined or declared.
Occurs when a variable or function is used before it is declared or defined
Can also happen when a variable or function is misspelled
Common in programming languages like Python, Java, and C++
Clock gating is used to disable the clock signal to certain parts of a circuit to save power, while normal gating is used to control the flow of data within the circuit.
Clock gating is used for power optimization by disabling the clock signal to unused parts of the circuit.
Normal gating is used to control the flow of data within the circuit by enabling or disabling certain paths.
Clock gating helps in reducing power con...
This question is likely related to a discrepancy between a library and netlist causing a difference in the size of PMOS transistors.
Mismatch between the library and netlist can lead to incorrect sizing of transistors
Ensure consistency between the library files and netlist to avoid discrepancies
Check for any errors or warnings related to library and netlist mismatch in the design tool logs
Verify the sizing of PMOS trans
BOM stands for Bill of Materials, which is a comprehensive list of components, parts, and materials needed to manufacture a product.
BOM includes detailed information about each component such as part number, description, quantity, and unit of measure.
It helps in tracking and managing inventory, ordering materials, and estimating production costs.
BOM can be hierarchical, with sub-assemblies listed under main components.
...
Drafting through Zuken involves using their software tools for creating and editing electronic designs.
Use Zuken's software tools like CR-8000 or CADSTAR for drafting electronic designs
Create schematics, layout designs, and PCB designs using Zuken's software
Utilize features like auto-routing, design rule checks, and 3D visualization for efficient drafting
Collaborate with team members by sharing and reviewing designs wi
I applied via Approached by Company and was interviewed in Jul 2023. There was 1 interview round.
It was to document the vision statement aligned to the purpose.
It is to find the actionable and measurability .
I applied via Company Website and was interviewed in Aug 2022. There were 2 interview rounds.
I was interviewed before Jul 2023.
I applied via Approached by Company and was interviewed in Sep 2017. There were 5 interview rounds.
I applied via Walk-in and was interviewed in May 2024. There were 3 interview rounds.
Turbine startup involves several steps to safely bring the turbine to operating speed.
Perform pre-start checks to ensure all systems are ready
Open steam inlet valves to allow steam to flow into the turbine
Gradually increase steam flow to bring the turbine up to speed
Monitor temperature and pressure levels throughout the startup process
Verify all systems are functioning properly before reaching full operating speed
based on 5 reviews
Rating in categories
Process Engineer
69
salaries
| ₹7.5 L/yr - ₹21.6 L/yr |
Senior Process Engineer
41
salaries
| ₹13 L/yr - ₹26.2 L/yr |
Senior Engineer
38
salaries
| ₹13 L/yr - ₹26.5 L/yr |
Senior Engineer Mechanical
15
salaries
| ₹10.3 L/yr - ₹28 L/yr |
Senior Associate
15
salaries
| ₹7.5 L/yr - ₹12.3 L/yr |
Linde India
TKIL
GE Vernova
Siemens