Filter interviews by
CO2 welding is a welding process that uses carbon dioxide gas as a shielding gas to protect the weld pool from atmospheric contamination.
CO2 welding is also known as MIG welding (Metal Inert Gas welding)
It is commonly used in the automotive industry for welding car bodies and frames
CO2 welding produces a strong and durable weld
The welding process is relatively easy to learn and can be used on a variety of metals
Family ...
I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.
Top trending discussions
posted on 12 Jun 2022
I applied via Approached by Company and was interviewed in May 2022. There were 2 interview rounds.
TPM is a maintenance strategy to maximize equipment effectiveness. TEC time is the time taken to produce one unit. Shaping is a manufacturing process. Tolerance is the allowable deviation from a specified dimension. Employee morale is the overall outlook and attitude of employees towards their work and workplace.
TPM stands for Total Productive Maintenance and involves a proactive approach to maintenance to minimize dow...
Materials used in mechanical production and the FTR ratio.
Common materials include metals, plastics, ceramics, and composites.
FTR ratio refers to the ratio of the number of good parts produced to the total number of parts produced.
FTR ratio is an important metric for measuring production efficiency and quality control.
Handover and take over is the process of transferring responsibility and accountability from one person or team to another to ensure the smooth operation and maintenance of a plant.
Handover and take over involves transferring information, knowledge, and resources from the outgoing team to the incoming team.
It is important to ensure that all necessary documentation, such as maintenance logs and operating procedures, are...
Reducing downtime can be achieved through proper maintenance, training, and monitoring.
Regular maintenance and inspections can prevent breakdowns and identify potential issues.
Providing training to operators and maintenance staff can improve efficiency and reduce errors.
Monitoring equipment performance and analyzing data can help identify patterns and areas for improvement.
Implementing a preventive maintenance program ...
To reduce line stoppage, implement preventive maintenance, train operators, and analyze root causes of stoppages.
Implement a preventive maintenance program
Train operators on proper equipment usage and maintenance
Analyze root causes of stoppages and implement corrective actions
Use real-time monitoring and data analysis to identify potential issues
Ensure adequate spare parts inventory
Regularly review and update productio...
To achieve our target, we need to set clear goals, develop a plan, allocate resources, monitor progress, and make necessary adjustments.
Set clear and specific goals
Develop a detailed plan with timelines and milestones
Allocate necessary resources, including personnel and budget
Monitor progress regularly and track key performance indicators
Make necessary adjustments and course corrections as needed
Defect-free products can be achieved through proper quality control measures and adherence to industry standards.
Establishing quality control procedures and standards
Regular inspection and testing of products
Training employees on quality control measures
Using high-quality raw materials
Maintaining equipment and machinery
Implementing corrective actions when defects are found
Skilling manpower requires a comprehensive approach that includes training, mentoring, and continuous learning.
Identify skill gaps and create a training plan
Provide on-the-job training and mentoring
Encourage continuous learning through workshops and seminars
Offer incentives for upskilling and career development
Create a culture of learning and development within the organization
Quality control checkpoints ensure product quality and consistency.
Inspection of raw materials
In-process inspections
Final product inspections
Testing and analysis
Documentation and record-keeping
Plant moral can be managed by creating a positive work environment and promoting employee engagement.
Encourage open communication and feedback
Recognize and reward employee achievements
Provide opportunities for professional development
Promote work-life balance
Foster a culture of teamwork and collaboration
5S methodology for workplace organization and efficiency
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain
The methodology is used to improve workplace organization, efficiency, and safety
The rule is to follow the 5S steps in order to maintain a clean and organized workspace
Check the rule by regularly auditing the workspace and making improvements
Keep the rule by training employees and making it a part of...
posted on 9 Sep 2021
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.
A time table is a schedule that outlines the allocation of time for different activities or events.
A time table helps in organizing and managing tasks efficiently.
It provides a clear timeline for activities, ensuring they are completed on time.
Time tables are commonly used in schools, colleges, and workplaces to plan classes, meetings, and projects.
They can be in the form of daily, weekly, or monthly schedules.
Time tab...
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I was interviewed before May 2021.
Round duration - 45 Minutes
Round difficulty - Medium
A class booking application for students to schedule and manage their classes.
Create a class booking system where students can view available classes, book classes, and manage their schedule.
Include features like class search, class details, booking confirmation, and calendar view.
Implement user authentication to ensure only registered students can book classes.
Allow students to cancel or reschedule classes with proper...
Round duration - 60 Minutes
Round difficulty - Medium
The interviewer understand the current problem statement I was working on.
Asked the clarifying questions and alternative approaches to solve the same and their tradeoffs.
Also, asked about the technologies I was using in depth and reason for choosing the same.
You have a car with a gas tank of infinite capacity. There are 'N' gas stations located along a circular route, numbered from 0 to N-1. You begin your journey with an empty tank...
Find the starting gas station index to complete a circular route with gas and cost arrays.
Iterate through gas stations, keeping track of gas remaining after each station
If gas remaining is negative, reset starting station to current station + 1
If total gas remaining at the end is greater than or equal to total cost, return starting station index
Round duration - 45 Minutes
Round difficulty - Medium
This round was their with the CTO and was mostly the culture fitment round.
Round duration - 30 Minutes
Round difficulty - Easy
This round was with the cofounder and was mostly culture fitment.
Tip 1 : Practice questions on leetcode
Tip 2 : Understand the best solutions in depth and algorithm used
Tip 3 : Ask clarifying questions to the interviewer and break the problem to smaller sub parts
Tip 1 : Highlight your most impactful work on the resume
Tip 2 : Keep it easy to understand
I applied via Campus Placement
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I faced a defect in plastic commodity related to poor quality control during the manufacturing process.
The defect was in the form of cracks and breakages in the plastic products.
It was caused by inadequate monitoring and supervision during the molding and cooling stages.
The defect resulted in a high number of rejected products and customer complaints.
To address the issue, we implemented stricter quality control measure...
I applied via Campus Placement and was interviewed before Aug 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
Store Executive
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Quality Engineer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Mahindra Logistics
Tata Motors
Ashok Leyland
Eicher Motors