i
Thermopads
Filter interviews by
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
Ratio an proportion,
Ohm's Law states that the current flowing through a conductor is directly proportional to the voltage applied across it, and inversely proportional to the resistance of the conductor.
Ohm's Law is represented by the formula V = I * R, where V is the voltage, I is the current, and R is the resistance.
It helps in calculating the current, voltage, or resistance in a circuit when the other two values are known.
For example, ...
Top trending discussions
I applied via Job Portal and was interviewed before Sep 2020. There was 1 interview round.
Cable manufacturing involves several steps including wire drawing, stranding, insulation, and jacketing.
Wire drawing involves pulling metal through a die to reduce its diameter.
Stranding involves twisting multiple wires together to form a cable.
Insulation is added to protect the wires from damage and prevent electrical interference.
Jacketing is the final step where a protective outer layer is added to the cable.
Quality...
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via LinkedIn and was interviewed in Nov 2023. There was 1 interview round.
I appeared for an interview in Dec 2024.
I appeared for an interview in Jan 2025.
Modem can be connected with CCMS using a physical cable or wirelessly through a network connection.
Connect the modem to the CCMS using an Ethernet cable for a wired connection.
Configure the modem to connect to the CCMS network wirelessly through Wi-Fi or cellular data.
Ensure proper settings and security protocols are in place for a secure connection.
Test the connection to ensure data transfer and communication between
I integrate with CCMS by collaborating with cross-functional teams, utilizing CCMS tools for documentation, and ensuring consistency and accuracy in content.
Collaborate with cross-functional teams to understand content requirements
Utilize CCMS tools for creating, editing, and managing documentation
Ensure consistency and accuracy in content by following style guides and best practices
The lights on the dashboard indicate various issues or statuses of the vehicle.
Lights are controlled by sensors that monitor different aspects of the vehicle
Different colors indicate different levels of urgency or severity
Common lights include check engine, oil pressure, battery, and brake system
Refer to the vehicle's manual for specific meanings of each light
There are various types of meters used for different purposes such as measuring electricity, water, gas, etc.
Electricity meters: measure the amount of electricity consumed by a household or business
Water meters: measure the volume of water used in a residential or commercial building
Gas meters: measure the amount of gas consumed for heating or cooking purposes
Smart meters: digital devices that record energy consumption...
posted on 1 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
Aptitude Test, Excel and PowerPoint proctored online test
Kaizen is a continuous improvement philosophy that can be applied to projects to enhance efficiency and quality.
Kaizen involves making small, incremental changes to processes or projects to improve overall performance.
Projects can benefit from Kaizen by identifying areas for improvement, implementing changes, and continuously monitoring and adjusting.
Examples of Kaizen in projects include streamlining workflows, reduci...
posted on 18 Oct 2024
I applied via Naukri.com and was interviewed before Oct 2023. There were 2 interview rounds.
Type of personality test
Led a team to successfully implement a new software system, resulting in a 20% increase in efficiency.
Led team in implementing new software system
Achieved 20% increase in efficiency
Received recognition for successful project completion
To solve any problem, break it down into smaller parts, analyze the root cause, brainstorm solutions, and implement the best one.
Break down the problem into smaller, manageable parts
Identify the root cause of the problem
Brainstorm potential solutions
Evaluate and choose the best solution
Implement the chosen solution and monitor its effectiveness
posted on 7 Oct 2022
I applied via Naukri.com and was interviewed before Oct 2021. There were 3 interview rounds.
Basic science questions are give in a written form questionare
Seven wastes are non-value adding activities in a process that lead to inefficiency and increased costs.
Transportation waste
Inventory waste
Motion waste
Waiting waste
Overproduction waste
Overprocessing waste
Defects waste
posted on 5 Mar 2022
I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
16
salaries
| ₹5 L/yr - ₹9.8 L/yr |
Senior Engineer
15
salaries
| ₹3.7 L/yr - ₹6.4 L/yr |
Engineer
14
salaries
| ₹2 L/yr - ₹5 L/yr |
Senior Production Engineer
7
salaries
| ₹4.4 L/yr - ₹9 L/yr |
Deputy Manager
7
salaries
| ₹6 L/yr - ₹13.5 L/yr |
Polycab Wires
Medha Servo Drives
Amphenol Interconnect
Raychem RPG