i
Filter interviews by
Pneumatic systems use compressed air to transmit power for various applications.
Compressed air is stored in a tank and released through valves to actuate cylinders or motors.
Pneumatic systems are commonly used in industries for automation, such as in manufacturing processes.
Examples include pneumatic drills, robotic arms, and air brakes in vehicles.
Sensors are devices that detect and respond to physical input from the environment.
Temperature sensors - detect changes in temperature
Pressure sensors - measure pressure changes
Motion sensors - detect movement
Proximity sensors - detect nearby objects
Light sensors - measure light intensity
MTTR stands for Mean Time To Repair, the average time taken to repair a failed component. MTBF stands for Mean Time Between Failures, the average time between failures of a component.
MTTR is the average time taken to repair a failed component.
MTBF is the average time between failures of a component.
MTTR = Total downtime / Number of failures
MTBF = Total uptime / Number of failures
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power to apparent power in an electrical system.
It is important for efficient power transmission and distribution.
Power factor is maintained by using power factor correction devices like capacitors.
A power factor of 1 indicates all power is being used effectively, while a lower power factor means s...
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
Aptitude Test, Excel and PowerPoint proctored online test
Kaizen is a continuous improvement philosophy that can be applied to projects to enhance efficiency and quality.
Kaizen involves making small, incremental changes to processes or projects to improve overall performance.
Projects can benefit from Kaizen by identifying areas for improvement, implementing changes, and continuously monitoring and adjusting.
Examples of Kaizen in projects include streamlining workflows, reduci...
ATLBattery Technology (India) Private Limited interview questions for popular designations
Electrical engineering project
Get interview-ready with Top ATLBattery Technology (India) Private Limited Interview Questions
I applied via Campus Placement and was interviewed in Aug 2023. There were 2 interview rounds.
Hr studied my resume and a test sheet which is given by HR to us to solve some maths queries in the paper
And some English to Hindi translations words
Quality is more important than quantity as it ensures that the desired standards are met.
Quality ensures customer satisfaction and loyalty.
Quality products or services have a longer lifespan and require fewer repairs or replacements.
Quality leads to improved efficiency and productivity.
Quality reduces waste and costs in the long run.
Quantity alone does not guarantee customer satisfaction or business success.
Examples: A...
mAh stands for milliampere-hour, which is a unit of measurement for the capacity of a battery.
mAh is used to measure the amount of electrical charge a battery can hold.
It represents the amount of current a battery can deliver over a specific period of time.
The higher the mAh rating, the longer the battery will last before needing to be recharged.
For example, a battery with a capacity of 2000mAh can deliver a current of
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 3 interview rounds.
PM maintenance in machines refers to planned maintenance activities carried out to prevent breakdowns and ensure optimal performance.
PM maintenance involves scheduled inspections, cleaning, lubrication, and replacement of parts to prevent unexpected failures.
It helps in identifying potential issues early on and addressing them before they escalate into major problems.
Examples of PM maintenance tasks include changing fi...
Basic knowledge of Acb, Vcb, T/F, SOP floor maintenance, UPS, and Compressor includes understanding of electrical equipment, transformers, standard operating procedures for maintenance, and backup power systems.
Understanding of Air Circuit Breaker (ACB) and Vacuum Circuit Breaker (VCB) operation and maintenance
Knowledge of Transformers (T/F) and their maintenance requirements
Familiarity with Standard Operating Procedur...
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the ATLBattery Technology (India) Private Limited interview -
The duration of ATLBattery Technology (India) Private Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 28 interviews
Interview experience
based on 116 reviews
Rating in categories
Junior Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Technician
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Exide Industries
Amara Raja Energy & Mobility
Luminous Power Technologies
Su-Kam Power Systems