i
Thermax
Limited
Filter interviews by
Pressure vessel manufacturing involves design, material selection, fabrication, inspection, and testing to ensure safety and compliance.
Design: Engineers create detailed specifications based on pressure and temperature requirements.
Material Selection: Common materials include carbon steel, stainless steel, and alloys, chosen for strength and corrosion resistance.
Fabrication: Processes like welding, forming, and ma...
In an emergency, prioritize safety, assess the situation, and follow established protocols to manage the plant effectively.
Immediately activate the emergency shutdown system if necessary to prevent accidents.
Assess the situation by gathering information from DCS and field operators to understand the extent of the emergency.
Communicate clearly with the control room and all personnel involved to ensure everyone is a...
Safe operation of boiler and turbine systems requires regular maintenance to ensure efficiency and prevent hazards.
Regular inspections of boiler tubes to prevent corrosion and leaks.
Routine calibration of pressure and temperature sensors for accurate readings.
Scheduled maintenance of turbine bearings to reduce wear and tear.
Implementation of a predictive maintenance program using vibration analysis.
Training staff ...
Interlocks in Boiler DCS ensure safe operation by preventing unsafe conditions and protecting equipment from damage.
Low water level interlock: Shuts down the boiler if water level drops below a safe threshold.
High pressure interlock: Prevents operation if pressure exceeds safe limits to avoid explosions.
Flame failure interlock: Automatically stops fuel supply if flame is not detected, preventing unburned fuel rele...
ESP bearings support the pump shaft and ensure smooth operation under various conditions.
1. Radial Bearings: Support radial loads and maintain shaft alignment. Example: Thrust bearings in multi-stage ESPs.
2. Thrust Bearings: Handle axial loads and prevent shaft movement. Example: Used in high-pressure applications.
3. Journal Bearings: Provide support and reduce friction between rotating and stationary parts. Examp...
The erection process involves assembling and installing structural components in construction projects.
Involves lifting and positioning heavy materials, such as steel beams.
Utilizes cranes and other machinery for safe and efficient assembly.
Includes safety protocols to protect workers during the process.
Example: Erecting a steel frame for a high-rise building.
Requires coordination among various teams, including en...
Electrostatic precipitators face issues like maintenance, efficiency drops, and power consumption affecting operational performance.
Maintenance challenges: Regular cleaning of collector plates is necessary to maintain efficiency.
Efficiency drops: High dust loading can lead to reduced collection efficiency, requiring operational adjustments.
Power consumption: Increased energy use during high particulate loads can l...
A permit is an official document granting permission to perform specific activities, ensuring safety and compliance with regulations.
Permits are essential for activities like hot work, confined space entry, and hazardous material handling.
For example, a hot work permit is required before welding or cutting operations to prevent fire hazards.
Confined space permits ensure safety measures are in place before entering...
Full body harnesses are essential for fall protection at heights above 6 feet in various industries.
OSHA recommends using a full body harness when working at heights of 6 feet or more.
In construction, workers on scaffolding or roofs should wear a harness.
In industrial settings, harnesses are used when working on elevated platforms or ladders.
For rescue operations, harnesses are crucial regardless of height to ensu...
Alignment is the process of adjusting components to achieve optimal performance and coherence in systems or teams.
In engineering, alignment ensures that mechanical parts fit together correctly, e.g., aligning gears in a machine.
In project management, team alignment involves ensuring all members understand and work towards the same goals.
In software development, code alignment refers to maintaining consistent codin...
Our head office is located in downtown New York City.
Head office is in downtown New York City
Easily accessible by public transportation
Close to major landmarks and attractions
I appeared for an interview before Apr 2021.
I appeared for an interview in Aug 2024.
I applied via Referral
I appeared for an interview in Jul 2024.
Boiler scale formation is caused by mineral deposits from water, leading to efficiency loss and potential damage.
Hard water contains high levels of calcium and magnesium, which precipitate and form scale.
Temperature increases in the boiler can accelerate scale formation, as seen in high-pressure systems.
Poor water treatment practices can lead to inadequate removal of scale-forming minerals.
Examples include calcium carb...
Softener charge involves adding the right amount of salt and water to regenerate the resin beads in a water softener system.
Check the salt level in the brine tank; it should be at least half full.
Add the appropriate type of salt (rock salt, solar salt, or evaporated salt) to the tank.
Ensure the water level in the brine tank is sufficient to dissolve the salt.
Run a regeneration cycle to allow the softener to recharge th...
Boiler feed water should ideally have low hardness to prevent scaling and corrosion, typically below 100 ppm.
Hardness in water is mainly due to calcium and magnesium ions.
High hardness can lead to scale formation on boiler tubes, reducing efficiency.
Feed water hardness should ideally be below 100 ppm for optimal boiler operation.
Water softening techniques, like ion exchange, are often used to reduce hardness.
For exampl...
Boiler scale can be treated using chemicals like phosphates, sulfamic acid, or citric acid to dissolve and prevent buildup.
Phosphates: Used to prevent scale formation by sequestering calcium and magnesium ions.
Sulfamic Acid: Effective for descaling and removing hard deposits from boiler surfaces.
Citric Acid: A biodegradable option that can dissolve scale and is less corrosive.
I specialize in health, safety, and environmental management, ensuring compliance and promoting a safe workplace culture.
Expert in developing and implementing HSE policies and procedures.
Conduct regular safety audits and risk assessments to identify hazards.
Provide training and workshops on safety protocols and emergency response.
Experience in incident investigation and reporting to prevent future occurrences.
Knowledge...
I am drawn to this organization for its commitment to safety, innovation, and community impact in the HSE field.
The organization's strong reputation for prioritizing health and safety aligns with my professional values.
I admire your innovative approaches to HSE challenges, such as implementing cutting-edge safety technologies.
The opportunity to work with a diverse team of experts excites me, as collaboration fosters gr...
Experienced Senior Design Engineer with a strong background in product development and project management across various industries.
Led a team in designing a medical device that improved patient monitoring efficiency by 30%.
Developed a new product line for a consumer electronics company, resulting in a 25% increase in market share.
Implemented design improvements that reduced manufacturing costs by 15% while maintaining...
Air compressors work by compressing air to increase its pressure, which can then be used for various applications.
Air is drawn into the compressor through an intake valve
The air is then compressed using a piston or rotating impeller
Compressed air is stored in a tank for later use
The compressed air is released through a valve when needed for powering tools or equipment
Regular maintenance, such as changing filters and oi...
The commissioning process ensures systems are installed, tested, and operational according to specifications.
Define project scope and objectives clearly.
Develop a commissioning plan outlining roles and responsibilities.
Conduct pre-commissioning checks to ensure readiness.
Perform functional testing to verify system performance.
Document findings and address any deficiencies.
Provide training to end-users for effective ope...
I have attended various sites for training and workshops related to after sales service.
Attended manufacturer's training site for product knowledge
Visited customer sites to understand their service needs
Participated in industry conferences and seminars
Relocation of places can be challenging but can also offer new opportunities and experiences.
Relocation can be stressful due to leaving familiar surroundings and support networks.
It can also be exciting to explore a new city or country and meet new people.
Consider the cost of living, job opportunities, and quality of life in the new location.
Research schools, healthcare facilities, and other amenities in the new area.
P...
I appeared for an interview in Apr 2025, where I was asked the following questions.
I appeared for an interview in May 2025, where I was asked the following questions.
I took time off to focus on personal development and family commitments, which enriched my skills and perspective.
I took a sabbatical to pursue further education, enhancing my financial analysis skills.
During the gap, I volunteered with a non-profit organization, managing their finances and gaining practical experience.
I faced family health issues that required my attention, but I used this time to stay updated with in...
Top trending discussions
Some of the top questions asked at the Thermax Limited interview for experienced candidates -
The duration of Thermax Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 96 interview experiences
Difficulty level
Duration
based on 3.6k reviews
Rating in categories
Shift Incharge
313
salaries
| ₹3.6 L/yr - ₹8.9 L/yr |
Assistant Manager
277
salaries
| ₹6 L/yr - ₹18 L/yr |
Electrical Engineer
262
salaries
| ₹2.4 L/yr - ₹7.2 L/yr |
Safety Officer
198
salaries
| ₹3.6 L/yr - ₹8.7 L/yr |
Control Room Engineer
195
salaries
| ₹2.5 L/yr - ₹7 L/yr |
John Deere
Cummins
ABB
CNH ( Case New Holland)