i
Thermax Limited
Filter interviews by
I applied via Company Website and was interviewed in Feb 2023. There were 3 interview rounds.
As a Safety Officer, I carry a range of safety equipment including a first aid kit, fire extinguisher, safety vest, and hard hat.
First aid kit for emergency medical situations
Fire extinguisher for fire emergencies
Safety vest for visibility and identification
Hard hat for head protection
Working at height safety involves measures to prevent falls and injuries when working at elevated levels.
Employers must conduct risk assessments and provide appropriate safety equipment and training.
Workers must use the provided safety equipment and follow safe work procedures.
Examples of safety equipment include harnesses, guardrails, and safety nets.
The standard also includes requirements for inspection and maintenan...
I would immediately stop the work and assess the situation to determine the necessary safety equipment and documents.
Stop the work immediately to prevent any potential hazards or accidents.
Assess the situation to determine the necessary safety equipment and documents.
Obtain the required safety equipment and documents before resuming work.
Communicate the importance of safety equipment and documents to all team members t
The hazards in oil and gas field include fire, explosion, toxic gas exposure, falls, and equipment failure.
Fire and explosion risks due to the presence of flammable materials
Toxic gas exposure from leaks or releases
Falls from heights during drilling or maintenance activities
Equipment failure due to high pressure or temperature
Environmental hazards such as oil spills or gas leaks
Human error or negligence leading to acci
Safety equipment and working procedures are essential for preventing accidents and injuries in the workplace.
Safety equipment includes personal protective equipment (PPE) such as hard hats, safety glasses, gloves, and safety shoes.
Working procedures involve following established protocols for tasks such as lockout/tagout, confined space entry, and working at heights.
Regular safety training and communication are also im...
JSA and risk assessment involve identifying hazards, evaluating risks, and implementing controls.
Identify the job or task to be analyzed
Break down the job into steps
Identify potential hazards for each step
Evaluate the risks associated with each hazard
Implement controls to eliminate or reduce the risks
Review and update the JSA and risk assessment regularly
Before starting work at height, I check...
The condition of the equipment to be used
The stability of the work surface
The weather conditions
The availability and proper use of personal protective equipment
The presence of a rescue plan
The competency of the workers involved
The communication system in place
The adherence to safety regulations and procedures
Basic PPEs are essential for plant safety. They include hard hats, safety glasses, earplugs, gloves, and safety shoes.
Hard hats protect the head from falling objects and impacts.
Safety glasses protect the eyes from flying debris and harmful substances.
Earplugs protect the ears from loud noises and prevent hearing loss.
Gloves protect the hands from cuts, burns, and chemical exposure.
Safety shoes protect the feet from fa...
posted on 19 Dec 2024
I applied via Campus Placement and was interviewed in Nov 2024. There were 3 interview rounds.
The hardest round I have experienced during interviews was ultimately successful, as I was selected. Only a few questions were multiple-choice; the rest required one-word or numerical answers to be written manually. Pay special attention to the last portion, as it was a scoring section containing standard technical questions. However, as we begin the assessment, the majority of the time is consumed by reasoning, arithmetic, and similar topics. In summary, I can say that the initial part is the toughest.
Our head office is located in downtown New York City.
Head office is in downtown New York City
Easily accessible by public transportation
Close to major landmarks and attractions
I was interviewed in Feb 2025.
My aim in the workplace is to continuously improve my skills, contribute to the success of the projects, and create a positive work environment.
Continuous improvement of skills through learning and training programs
Contribution to the success of projects by meeting deadlines and delivering high-quality work
Creating a positive work environment by fostering teamwork and open communication
When issues are escalated to higher levels, it is important to provide clear and concise updates to ensure transparency and accountability.
Ensure all relevant information is included in the report
Communicate any potential impact on project timeline or budget
Provide recommendations for resolution or mitigation
Follow up with stakeholders to ensure the issue is being addressed
Document all communication and actions taken f
Thermax Limited interview questions for popular designations
I applied via AmbitionBox and was interviewed in Oct 2024. There were 3 interview rounds.
NDT (Non-Destructive Testing) involves testing materials without causing damage, while non-NDT methods may involve destructive testing.
NDT methods include ultrasonic testing, radiography, magnetic particle testing, and dye penetrant testing.
Non-NDT methods may include cutting, drilling, or breaking materials to test their properties.
NDT is commonly used in industries like aerospace, automotive, and construction to ensu...
For welding carbon steel to alloy steel, the electrode commonly used is E7018.
E7018 electrode is commonly used for welding carbon steel to alloy steel
It is a low-hydrogen electrode that provides strong welds with good impact resistance
The electrode operates on DC current and is suitable for both vertical and overhead welding positions
Economizer coil material specification is typically stainless steel or aluminum.
Economizer coils are commonly made of stainless steel or aluminum for corrosion resistance and durability.
The material specification for economizer coils may vary depending on the specific application and operating conditions.
Stainless steel economizer coils are preferred for high temperature and corrosive environments, while aluminum coils...
Superheated coil material specification is typically stainless steel due to its high temperature resistance and durability.
Stainless steel is commonly used for superheated coil material due to its high temperature resistance
Other materials like nickel alloys may also be used for specific applications
Material specifications should meet the required temperature and pressure ratings for the superheated coil
Accounts are financial records, while accountability is the responsibility to justify actions and decisions.
Accounts refer to financial records of transactions, while accountability refers to the obligation to explain and justify actions.
Accounts are used to track financial activities and performance, while accountability ensures transparency and integrity in decision-making.
Examples: Keeping accurate accounts of proje...
Materials can be checked by conducting visual inspections, performing tests, and verifying documentation.
Conduct visual inspections to check for any defects or damages
Perform tests such as strength tests, hardness tests, and chemical tests
Verify documentation such as certificates of conformity and material test reports
Ensure materials meet specifications and standards set by the project
Get interview-ready with Top Thermax Limited Interview Questions
I was interviewed before Apr 2021.
I was interviewed in Jan 2025.
The company's name is XYZ Engineering Solutions, a leading provider of industrial automation solutions.
XYZ Engineering Solutions specializes in providing DCS solutions for boilers in industrial settings.
The company has a team of experienced engineers who design and implement control systems for boiler operations.
XYZ Engineering Solutions has a track record of successful projects in the field of industrial automation.
I applied via Campus Placement and was interviewed in Nov 2024. There were 2 interview rounds.
Aptitude round was moderate level and there are 9 sections.
I was interviewed in Aug 2024.
posted on 27 Dec 2024
I applied via Campus Placement
It was very difficult level for interview process in which there was 9 sections and each section had 15-20 questions.
It was elimination round.
Top trending discussions
The duration of Thermax Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 297 interviews
Interview experience
based on 3.3k reviews
Rating in categories
Shift Incharge
301
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
281
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
253
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
214
salaries
| ₹0 L/yr - ₹0 L/yr |
Control Room Engineer
187
salaries
| ₹0 L/yr - ₹0 L/yr |
Kirloskar Brothers
BHEL
Siemens
Larsen & Toubro Limited