i
Thermax Limited
Filter interviews by
posted on 19 Dec 2024
I applied via Campus Placement and was interviewed in Nov 2024. There were 3 interview rounds.
The hardest round I have experienced during interviews was ultimately successful, as I was selected. Only a few questions were multiple-choice; the rest required one-word or numerical answers to be written manually. Pay special attention to the last portion, as it was a scoring section containing standard technical questions. However, as we begin the assessment, the majority of the time is consumed by reasoning, arithmetic, and similar topics. In summary, I can say that the initial part is the toughest.
posted on 27 Dec 2024
I applied via Campus Placement
It was very difficult level for interview process in which there was 9 sections and each section had 15-20 questions.
It was elimination round.
Top trending discussions
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Experienced Senior Engineer with a strong background in software development, project management, and team leadership.
Led a team of 10 engineers in developing a scalable web application, improving performance by 30%.
Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.
Designed and optimized database systems, reducing query response time by 40%.
Mentored junior engineers, fostering a col...
I bring extensive engineering experience, innovative problem-solving skills, and a passion for enhancing urban mobility solutions.
Proven track record in designing and implementing advanced elevator systems, improving efficiency by 20%.
Strong collaboration skills demonstrated through successful cross-functional projects, leading to a 15% reduction in project timelines.
Expertise in utilizing data analytics to optimize ma...
posted on 27 Oct 2021
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
posted on 4 Sep 2021
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
There are several types of welding including MIG, TIG, Stick, and Flux-Cored welding.
MIG welding uses a wire electrode and a shielding gas to join two pieces of metal together.
TIG welding uses a tungsten electrode and a filler metal to create a strong weld.
Stick welding uses a consumable electrode coated in flux to create a strong bond.
Flux-Cored welding uses a wire electrode with a flux core to create a protective shi
1st angle projection is used in Europe & 3rd angle projection is used in North America. They differ in placement of views.
1st angle projection places the object in front of the viewing plane while 3rd angle projection places the object behind the viewing plane.
In 1st angle projection, the top view is placed below the front view while in 3rd angle projection, the top view is placed above the front view.
1st angle project...
Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.
Six Sigma aims to achieve a level of quality where the probability of defects is extremely low.
It involves a structured approach to problem-solving using statistical analysis.
The methodology uses a set of tools and techniques such as DMAIC (Define, Measure, Analyze, Improve, Control) and statistical process con...
based on 2 interviews
Interview experience
Shift Incharge
310
salaries
| ₹2.6 L/yr - ₹10.5 L/yr |
Assistant Manager
258
salaries
| ₹5.8 L/yr - ₹16 L/yr |
Electrical Engineer
232
salaries
| ₹2.4 L/yr - ₹7.2 L/yr |
Senior Executive
209
salaries
| ₹4 L/yr - ₹11 L/yr |
Control Room Engineer
193
salaries
| ₹2.5 L/yr - ₹7 L/yr |
John Deere
Cummins
ABB
KONE