Theeta Electricals Production Engineer Team Lead Interview Questions, Process, and Tips for Experienced

Updated 27 Jan 2024

Theeta Electricals Production Engineer Team Lead Interview Experiences for Experienced

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Technical 

(10 Questions)

  • Q1. Self introduction
  • Q2. Jobs responsibility
  • Q3. Update Line in FMDC bord
  • Ans. 

    To update the line in FMDC board, follow these steps:

    • Access the FMDC board

    • Identify the line that needs to be updated

    • Make necessary changes or modifications to the line

    • Ensure the updated line meets the required specifications

    • Test the updated line for functionality and quality

    • Document the changes made for future reference

  • Answered by AI
  • Q4. What is this oee calculation
  • Ans. 

    OEE (Overall Equipment Efficiency) is a calculation used to measure the effectiveness of a production process.

    • OEE is a metric that combines availability, performance, and quality to determine the overall efficiency of a production line.

    • It is calculated by multiplying the availability, performance, and quality factors together.

    • OEE provides insights into how well the equipment is being utilized and identifies areas for i...

  • Answered by AI
  • Q5. What is this kaizen and suggestion
  • Ans. 

    Kaizen is a continuous improvement philosophy in production engineering that encourages employees to suggest and implement ideas for process improvement.

    • Kaizen is a Japanese term meaning 'change for the better' or 'continuous improvement'.

    • It involves small, incremental changes made by employees to improve processes, reduce waste, and increase efficiency.

    • Kaizen encourages a culture of continuous learning, problem-solvin...

  • Answered by AI
  • Q6. What is this tpm
  • Ans. 

    TPM stands for Total Productive Maintenance, a systematic approach to equipment maintenance that aims to maximize productivity and minimize downtime.

    • TPM focuses on proactive and preventive maintenance to improve equipment reliability and performance.

    • It involves the participation of all employees in the maintenance process.

    • TPM aims to eliminate all losses, including breakdowns, setup and adjustment time, and defects.

    • It ...

  • Answered by AI
  • Q7. What's is this TPM-JH
  • Ans. 

    TPM-JH stands for Total Productive Maintenance - Jishu Hozen.

    • TPM-JH is a maintenance methodology used to improve equipment effectiveness and reduce downtime.

    • It focuses on proactive maintenance activities to prevent equipment failures.

    • Jishu Hozen is a Japanese term meaning autonomous maintenance.

    • TPM-JH involves training operators to perform routine maintenance tasks and inspections.

    • It aims to create a culture of ownersh...

  • Answered by AI
  • Q8. About your previous organization
  • Q9. What's is this 7QC tool
  • Ans. 

    The 7QC tools are a set of quality control tools used in production engineering to identify and solve quality-related issues.

    • The 7QC tools include: Pareto chart, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart.

    • These tools help in analyzing data, identifying root causes of problems, and implementing corrective actions.

    • For example, a Pareto chart can be used to prioritize q...

  • Answered by AI
  • Q10. What's is this cycle time and take time
  • Ans. 

    Cycle time is the total time it takes to complete a process or task, while take time is the time it takes for an individual to complete their part of the process.

    • Cycle time is a measure of efficiency and productivity.

    • Take time is the time taken by an individual to complete their specific task within the overall cycle time.

    • Cycle time includes all the steps and activities involved in completing a process.

    • Take time can va...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. Please tell me behind Organisation jobs responsibility.
  • Q2. What's is this rejection analysis
  • Ans. 

    Rejection analysis is the process of identifying and understanding the reasons for product or process failures.

    • Rejection analysis helps in identifying the root causes of failures.

    • It involves analyzing rejected products or components to determine the reasons for rejection.

    • The analysis may include examining manufacturing processes, quality control measures, and product specifications.

    • By understanding the reasons for reje...

  • Answered by AI
  • Q3. What is this spm machine
  • Ans. 

    SPM machine stands for Special Purpose Machine. It is a custom-built machine designed to perform specific manufacturing tasks efficiently.

    • SPM machines are designed for specific manufacturing tasks and are not versatile like general-purpose machines.

    • They are often used in industries like automotive, aerospace, and electronics.

    • Examples of SPM machines include CNC machines, drilling machines, and assembly machines.

    • These m...

  • Answered by AI

Interview questions from similar companies

Interview Questionnaire 

4 Questions

  • Q1. Instrumentation Basics
  • Q2.  DCS Architecture for various Projects handled in my career
  • Ans. 

    I have worked on various DCS architectures in my career, including those for chemical plants and power plants.

    • Designed and implemented DCS architecture for a chemical plant project

    • Developed DCS architecture for a power plant project

    • Worked on DCS architecture for a water treatment plant project

    • Collaborated with team to create DCS architecture for a pharmaceutical plant project

  • Answered by AI
  • Q3. Boiler Process and Logic Configurations
  • Q4. Package Negotiation

Interview Preparation Tips

Round: Resume Shortlist
Experience: DCS and Industrial Automation

Interview Questionnaire 

3 Questions

  • Q1. About Brazing process.
  • Q2. Line balancing
  • Q3. Man power handling

I applied via Walk-in and was interviewed in May 2019. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. I am sharing all questions in advice box..

Interview Preparation Tips

Interview preparation tips for other job seekers - Firstly asked me to tell something about myself.. He had some queried about my responsibilities for my family . After cleared those he asked about my working experience, safety related questions.
After that he started to ask me some questions from design of machine which i could not make him satisfy with my answer
Then he asked about my favourite topic during diploma engineering.. as i said him IC engine, steam engine, heat transfer, pump he started to ask questions from there like what is engine, types, d/f among them , volumetric efficiency, stroke length, compression ratio, turbocharger, pump working principle etc..
I attended those all
After that he gave some info about site environment, and asked to me that i m ok with it or not..
That's it..
Be confident and be honest are the key to crack L&T interview..
Good luck
Thank you

I was interviewed in May 2019.

Interview Questionnaire 

2 Questions

  • Q1. How many types off bricks are uses in construction..
  • Ans. 

    There are several types of bricks used in construction, including clay bricks, concrete bricks, and fire bricks.

    • Clay bricks are the most common type of brick used in construction.

    • Concrete bricks are made from cement, sand, and water and are used for their strength and durability.

    • Fire bricks are designed to withstand high temperatures and are used in fireplaces, ovens, and kilns.

    • Other types of bricks include sand-lime b...

  • Answered by AI
  • Q2. Now can control the many critical conditions on site.

I applied via Naukri.com and was interviewed in Nov 2018. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. In this Round Bajaj Deputy manager asking questions regarding my experiance in which i gain. Actually my Experience is in Rural Electification so that question best on it. I want share questions.
  • Q2. 1)What is servey in R.E. 2)Write DTR structure with BOQ. 3)if i give you a unelectified habitation then How to electified it and Burn a bulb on a consumer.
  • Ans. 

    Survey in R.E. refers to the process of collecting data and information about a specific area or site.

    • Survey in R.E. involves measuring and mapping the land, identifying boundaries, and assessing topography.

    • It helps in understanding the existing conditions of the site and is crucial for planning and designing construction projects.

    • Survey techniques include using GPS, total stations, and other instruments to gather accu...

  • Answered by AI
  • Q3. 4)what is sag and how to minimize it. 5)if a consumer having distance between pole and his house is 5mtr then how much cable you provide him for connection. 6)write Bill of materials of service connection
  • Ans. 

    Sag is the vertical distance between a conductor's position when it is in tension and its position when it is in a relaxed state.

    • Sag is caused by the weight of the conductor and environmental factors such as temperature and wind.

    • To minimize sag, conductors can be made of materials with higher tensile strength, or additional support structures like suspension insulators can be used.

    • Sag can also be minimized by increasin...

  • Answered by AI
  • Q4. 7)How to billing 1 km line.
  • Ans. 

    Billing for a 1 km line involves calculating the cost based on the length of the line and any additional factors.

    • Determine the cost per unit length of the line

    • Multiply the cost per unit length by the length of the line to calculate the total billing amount

    • Consider any additional factors that may affect the billing, such as taxes or fees

    • Provide a detailed breakdown of the billing to the client, including the cost per un

  • Answered by AI
  • Q5. 1)In this round only salary discussion.

Interview Preparation Tips

Round: Project manager interview on job location
Experience: 1)How to Earth a HT line .
2)Phase difference between Conductors.


General Tips: I advice all the Interviee during interview time take confidence on self. And reminder on mind that what we done from starting till now.



Skills: Computer knowledge, Body Language, Leadership, Presentation Skills, Decision Making Skills
Duration: 1-4 weeks

Interview Questionnaire 

1 Question

  • Q1. How we can increase efficiency of boiler ?
  • Ans. 

    Efficiency of a boiler can be increased by improving insulation, optimizing combustion, and regular maintenance.

    • Improve insulation to reduce heat loss

    • Optimize combustion by adjusting air-to-fuel ratio and using efficient burners

    • Regular maintenance to clean and repair components

    • Use economizers to recover waste heat

    • Upgrade to high-efficiency boilers

    • Implement energy management systems to monitor and control boiler operati

  • Answered by AI

I applied via Recruitment Consulltant and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Your current living details current work salary current ctc and expected ctc
Round 2 - Aptitude Test 

Basic questions related to your previous work and basic electronics.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be loyal think positive and do not tell lie. Answer the all questions confidently.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is working principle of induction motor
  • Ans. 

    Induction motor works on the principle of electromagnetic induction to generate rotating magnetic field.

    • Induction motor has a stator with a set of windings that are connected to an AC power supply.

    • When AC current flows through the stator windings, it creates a rotating magnetic field.

    • This rotating magnetic field induces currents in the rotor windings, causing the rotor to rotate.

    • The rotor never reaches the synchronous ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You must have knowledge about Induction or BLDC fan manufacturing
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Transfermar kya hai
  • Q2. Types of motar 2phage
  • Ans. 

    Types of mortar in 2 phase include dry pack mortar and wet pack mortar.

    • Dry pack mortar is a stiff mixture of sand, cement, and water used for filling gaps and cracks.

    • Wet pack mortar is a fluid mixture of sand, cement, and water used for laying bricks and stones.

    • Other types of mortar include lime mortar, cement mortar, and epoxy mortar.

  • Answered by AI
Round 2 - Aptitude Test 

Language English Hindi

Round 3 - Technical 

(2 Questions)

  • Q1. Power generation
  • Q2. Circuit kinte prakar ki hoti hai

Theeta Electricals Interview FAQs

How many rounds are there in Theeta Electricals Production Engineer Team Lead interview for experienced candidates?
Theeta Electricals interview process for experienced candidates usually has 2 rounds. The most common rounds in the Theeta Electricals interview process for experienced candidates are Technical.
What are the top questions asked in Theeta Electricals Production Engineer Team Lead interview for experienced candidates?

Some of the top questions asked at the Theeta Electricals Production Engineer Team Lead interview for experienced candidates -

  1. What is this kaizen and suggest...read more
  2. What's is this cycle time and take t...read more
  3. What's is this rejection analy...read more

Tell us how to improve this page.

Theeta Electricals Production Engineer Team Lead Interview Process for Experienced

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 419 Interviews
ABB Interview Questions
4.1
 • 235 Interviews
Havells Interview Questions
4.0
 • 209 Interviews
GAO Tek Interview Questions
4.4
 • 170 Interviews
Bajaj Electricals Interview Questions
4.0
 • 124 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
View all
Production Engineer
26 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Purchase Executive
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Production Engineer
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quality Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Production Supervisor
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Theeta Electricals with

ABB

4.1
Compare

Siemens

4.1
Compare

Schneider Electric

4.1
Compare

Havells

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview