Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
To update the line in FMDC board, follow these steps:
Access the FMDC board
Identify the line that needs to be updated
Make necessary changes or modifications to the line
Ensure the updated line meets the required specifications
Test the updated line for functionality and quality
Document the changes made for future reference
OEE (Overall Equipment Efficiency) is a calculation used to measure the effectiveness of a production process.
OEE is a metric that combines availability, performance, and quality to determine the overall efficiency of a production line.
It is calculated by multiplying the availability, performance, and quality factors together.
OEE provides insights into how well the equipment is being utilized and identifies areas for i...
Kaizen is a continuous improvement philosophy in production engineering that encourages employees to suggest and implement ideas for process improvement.
Kaizen is a Japanese term meaning 'change for the better' or 'continuous improvement'.
It involves small, incremental changes made by employees to improve processes, reduce waste, and increase efficiency.
Kaizen encourages a culture of continuous learning, problem-solvin...
TPM stands for Total Productive Maintenance, a systematic approach to equipment maintenance that aims to maximize productivity and minimize downtime.
TPM focuses on proactive and preventive maintenance to improve equipment reliability and performance.
It involves the participation of all employees in the maintenance process.
TPM aims to eliminate all losses, including breakdowns, setup and adjustment time, and defects.
It ...
TPM-JH stands for Total Productive Maintenance - Jishu Hozen.
TPM-JH is a maintenance methodology used to improve equipment effectiveness and reduce downtime.
It focuses on proactive maintenance activities to prevent equipment failures.
Jishu Hozen is a Japanese term meaning autonomous maintenance.
TPM-JH involves training operators to perform routine maintenance tasks and inspections.
It aims to create a culture of ownersh...
The 7QC tools are a set of quality control tools used in production engineering to identify and solve quality-related issues.
The 7QC tools include: Pareto chart, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart.
These tools help in analyzing data, identifying root causes of problems, and implementing corrective actions.
For example, a Pareto chart can be used to prioritize q...
Cycle time is the total time it takes to complete a process or task, while take time is the time it takes for an individual to complete their part of the process.
Cycle time is a measure of efficiency and productivity.
Take time is the time taken by an individual to complete their specific task within the overall cycle time.
Cycle time includes all the steps and activities involved in completing a process.
Take time can va...
Rejection analysis is the process of identifying and understanding the reasons for product or process failures.
Rejection analysis helps in identifying the root causes of failures.
It involves analyzing rejected products or components to determine the reasons for rejection.
The analysis may include examining manufacturing processes, quality control measures, and product specifications.
By understanding the reasons for reje...
SPM machine stands for Special Purpose Machine. It is a custom-built machine designed to perform specific manufacturing tasks efficiently.
SPM machines are designed for specific manufacturing tasks and are not versatile like general-purpose machines.
They are often used in industries like automotive, aerospace, and electronics.
Examples of SPM machines include CNC machines, drilling machines, and assembly machines.
These m...
I have worked on various DCS architectures in my career, including those for chemical plants and power plants.
Designed and implemented DCS architecture for a chemical plant project
Developed DCS architecture for a power plant project
Worked on DCS architecture for a water treatment plant project
Collaborated with team to create DCS architecture for a pharmaceutical plant project
posted on 23 Nov 2019
I applied via Walk-in and was interviewed in May 2019. There was 1 interview round.
posted on 6 May 2019
I was interviewed in May 2019.
There are several types of bricks used in construction, including clay bricks, concrete bricks, and fire bricks.
Clay bricks are the most common type of brick used in construction.
Concrete bricks are made from cement, sand, and water and are used for their strength and durability.
Fire bricks are designed to withstand high temperatures and are used in fireplaces, ovens, and kilns.
Other types of bricks include sand-lime b...
I applied via Naukri.com and was interviewed in Nov 2018. There were 5 interview rounds.
Survey in R.E. refers to the process of collecting data and information about a specific area or site.
Survey in R.E. involves measuring and mapping the land, identifying boundaries, and assessing topography.
It helps in understanding the existing conditions of the site and is crucial for planning and designing construction projects.
Survey techniques include using GPS, total stations, and other instruments to gather accu...
Sag is the vertical distance between a conductor's position when it is in tension and its position when it is in a relaxed state.
Sag is caused by the weight of the conductor and environmental factors such as temperature and wind.
To minimize sag, conductors can be made of materials with higher tensile strength, or additional support structures like suspension insulators can be used.
Sag can also be minimized by increasin...
Billing for a 1 km line involves calculating the cost based on the length of the line and any additional factors.
Determine the cost per unit length of the line
Multiply the cost per unit length by the length of the line to calculate the total billing amount
Consider any additional factors that may affect the billing, such as taxes or fees
Provide a detailed breakdown of the billing to the client, including the cost per un
Efficiency of a boiler can be increased by improving insulation, optimizing combustion, and regular maintenance.
Improve insulation to reduce heat loss
Optimize combustion by adjusting air-to-fuel ratio and using efficient burners
Regular maintenance to clean and repair components
Use economizers to recover waste heat
Upgrade to high-efficiency boilers
Implement energy management systems to monitor and control boiler operati
posted on 30 Jun 2022
I applied via Recruitment Consulltant and was interviewed in May 2022. There were 2 interview rounds.
Basic questions related to your previous work and basic electronics.
posted on 18 Mar 2024
Induction motor works on the principle of electromagnetic induction to generate rotating magnetic field.
Induction motor has a stator with a set of windings that are connected to an AC power supply.
When AC current flows through the stator windings, it creates a rotating magnetic field.
This rotating magnetic field induces currents in the rotor windings, causing the rotor to rotate.
The rotor never reaches the synchronous ...
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 3 interview rounds.
Types of mortar in 2 phase include dry pack mortar and wet pack mortar.
Dry pack mortar is a stiff mixture of sand, cement, and water used for filling gaps and cracks.
Wet pack mortar is a fluid mixture of sand, cement, and water used for laying bricks and stones.
Other types of mortar include lime mortar, cement mortar, and epoxy mortar.
Language English Hindi
based on 1 interview
Interview experience
Production Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Purchase Executive
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Production Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Supervisor
6
salaries
| ₹0 L/yr - ₹0 L/yr |
ABB
Siemens
Schneider Electric
Havells