I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
To update the line in FMDC board, follow these steps:
Access the FMDC board
Identify the line that needs to be updated
Make necessary changes or modifications to the line
Ensure the updated line meets the required specifications
Test the updated line for functionality and quality
Document the changes made for future reference
OEE (Overall Equipment Efficiency) is a calculation used to measure the effectiveness of a production process.
OEE is a metric that combines availability, performance, and quality to determine the overall efficiency of a production line.
It is calculated by multiplying the availability, performance, and quality factors together.
OEE provides insights into how well the equipment is being utilized and identifies areas for i...
Kaizen is a continuous improvement philosophy in production engineering that encourages employees to suggest and implement ideas for process improvement.
Kaizen is a Japanese term meaning 'change for the better' or 'continuous improvement'.
It involves small, incremental changes made by employees to improve processes, reduce waste, and increase efficiency.
Kaizen encourages a culture of continuous learning, problem-solvin...
TPM stands for Total Productive Maintenance, a systematic approach to equipment maintenance that aims to maximize productivity and minimize downtime.
TPM focuses on proactive and preventive maintenance to improve equipment reliability and performance.
It involves the participation of all employees in the maintenance process.
TPM aims to eliminate all losses, including breakdowns, setup and adjustment time, and defects.
It ...
TPM-JH stands for Total Productive Maintenance - Jishu Hozen.
TPM-JH is a maintenance methodology used to improve equipment effectiveness and reduce downtime.
It focuses on proactive maintenance activities to prevent equipment failures.
Jishu Hozen is a Japanese term meaning autonomous maintenance.
TPM-JH involves training operators to perform routine maintenance tasks and inspections.
It aims to create a culture of ownersh...
The 7QC tools are a set of quality control tools used in production engineering to identify and solve quality-related issues.
The 7QC tools include: Pareto chart, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart.
These tools help in analyzing data, identifying root causes of problems, and implementing corrective actions.
For example, a Pareto chart can be used to prioritize q...
Cycle time is the total time it takes to complete a process or task, while take time is the time it takes for an individual to complete their part of the process.
Cycle time is a measure of efficiency and productivity.
Take time is the time taken by an individual to complete their specific task within the overall cycle time.
Cycle time includes all the steps and activities involved in completing a process.
Take time can va...
Rejection analysis is the process of identifying and understanding the reasons for product or process failures.
Rejection analysis helps in identifying the root causes of failures.
It involves analyzing rejected products or components to determine the reasons for rejection.
The analysis may include examining manufacturing processes, quality control measures, and product specifications.
By understanding the reasons for reje...
SPM machine stands for Special Purpose Machine. It is a custom-built machine designed to perform specific manufacturing tasks efficiently.
SPM machines are designed for specific manufacturing tasks and are not versatile like general-purpose machines.
They are often used in industries like automotive, aerospace, and electronics.
Examples of SPM machines include CNC machines, drilling machines, and assembly machines.
These m...
Top trending discussions
posted on 31 Oct 2023
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
posted on 7 May 2021
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
posted on 17 Oct 2021
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
posted on 10 Oct 2022
I applied via Campus Placement and was interviewed in Apr 2022. There were 4 interview rounds.
I attend aptitude test very well , It is my first interview, It was very good experince to me then i never forget that test they will give questions in the test within my syllabus only they give mathematical conversions also iam very thrilled to write the exam finally iam written the exam and i will successfully passed the exam
Yes, soldering is a process of joining two or more metal components using a filler metal called solder.
Soldering is a common technique used in electronics and metalworking industries.
The criteria for soldering include proper cleaning of the surfaces to be soldered, applying flux to promote bonding, and heating the solder to its melting point.
The solder should flow smoothly and evenly to create a strong bond.
The solder ...
Colour coding is a system of assigning specific colors to objects or categories for easy identification and organization.
Colour coding helps in quickly identifying and distinguishing objects or categories.
Different industries and fields use different color coding systems.
Examples of color coding include: red for danger, green for safety, blue for water, yellow for caution, etc.
I am a Production Engineer with experience in optimizing manufacturing processes and ensuring efficient production.
Experienced in analyzing production data and identifying areas for improvement
Proficient in implementing lean manufacturing principles to increase productivity
Skilled in troubleshooting and resolving production issues
Strong knowledge of production equipment and machinery
Effective in collaborating with cros
Yes, I have work experience as a Production Engineer.
Worked as a Production Engineer at XYZ Manufacturing for 3 years
Managed production processes and ensured smooth operations
Implemented lean manufacturing principles to improve efficiency
Collaborated with cross-functional teams to resolve production issues
Implemented quality control measures to ensure product standards
Trained and supervised production staff
I have worked on various projects at the company, including optimizing production processes and implementing new technologies.
Optimized production processes to increase efficiency
Implemented new technologies to improve product quality
Collaborated with cross-functional teams to troubleshoot and resolve production issues
Developed and executed test plans to ensure product reliability
Led continuous improvement initiatives
posted on 26 Sep 2021
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
posted on 14 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
Line balancing is the process of optimizing workloads across a production line to improve efficiency and reduce bottlenecks.
It involves analyzing the tasks required to complete a product and assigning them to workstations in a way that minimizes idle time and maximizes throughput.
Line balancing can help reduce production costs, increase output, and improve quality.
Examples of line balancing techniques include time stud...
Manpower allocation is based on project requirements, skill sets, availability, and workload.
Manpower allocation is a crucial aspect of production engineering.
It involves identifying the required skill sets for a project.
Availability of resources is also taken into consideration.
Workload is another factor that determines manpower allocation.
The allocation process is dynamic and can change based on project progress and
posted on 10 May 2024
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
Group discussion is very friendly way ☺️
posted on 13 Jun 2022
posted on 11 Mar 2024
based on 1 interview
Interview experience
Production Engineer
29
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Purchase Executive
14
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Senior Production Engineer
11
salaries
| ₹3.2 L/yr - ₹4.8 L/yr |
Quality Engineer
8
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Production Supervisor
6
salaries
| ₹1.8 L/yr - ₹2 L/yr |
GAO Tek
Amphenol Interconnect
Kyungshin Industrial Motherson
Electrical Research & Development Association