Filter interviews by
I applied via Newspaper Ad and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2019. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Apr 2022. There were 3 interview rounds.
posted on 26 Jan 2024
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
Quality parameters asked what they required
I applied via Campus Placement
The company visited our college for a campus drive, screened the CVs, and conducted an aptitude test consisting of basic mathematical questions.
I applied via Naukri.com and was interviewed in Jul 2021. There were 4 interview rounds.
I was interviewed in Oct 2022.
To improve packer TPH, we can focus on optimizing the packing process and equipment.
Analyze the current packing process and identify bottlenecks
Implement lean manufacturing principles to eliminate waste and improve efficiency
Invest in modern packing equipment to increase speed and accuracy
Train packers on proper techniques to minimize errors and reduce downtime
Regularly monitor and measure TPH to track progress and ide
Regular maintenance, proper training of staff, and use of quality equipment can reduce breakdown maintenance.
Implement a preventive maintenance program
Train staff on proper use and maintenance of equipment
Use high-quality equipment and parts
Regularly inspect equipment for signs of wear and tear
Address any issues promptly to prevent further damage
Keep a record of maintenance and repairs for future reference
TAT and GIGO can be reduced by improving processes and data quality.
Identify bottlenecks in the process and streamline them
Train employees to improve efficiency and accuracy
Implement quality control measures to ensure data accuracy
Use technology to automate processes and reduce manual errors
Regularly review and analyze data to identify areas for improvement
Improving safety requires a comprehensive approach that includes training, communication, and continuous evaluation.
Develop and implement safety protocols and procedures
Provide regular safety training to employees
Encourage open communication about safety concerns
Regularly evaluate and update safety measures
Invest in safety equipment and technology
Establish a safety committee to oversee safety initiatives
Attend complain sites how to satisfied customer
General aptitude and math questions
I applied via Approached by Company and was interviewed before Aug 2021. There were 3 interview rounds.
Scaffolding quantities can be calculated by determining the height, length, and width of the area to be covered.
Measure the height, length, and width of the area to be covered
Determine the type of scaffolding needed
Calculate the number of scaffolding units required
Consider the weight capacity and safety regulations
Adjust the quantities based on the complexity of the project
Shuttering oil is used to prevent concrete from sticking to the surface of the shuttering.
Shuttering oil is applied to the surface of the shuttering to prevent the concrete from sticking to it.
It helps in easy removal of the shuttering after the concrete has set.
It also helps in achieving a smooth finish on the concrete surface.
Using shuttering oil reduces the chances of damage to the shuttering during removal.
Differen...
based on 1 interview
Interview experience
based on 24 reviews
Rating in categories
Sales Officer
355
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
235
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Engineer
230
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Sales Officer
157
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
105
salaries
| ₹0 L/yr - ₹0 L/yr |
UltraTech Cement
Ambuja Cements
ACC
Shree Cement