Filter interviews by
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Refer and check after decided
To check for my performance
Top trending discussions
posted on 24 Mar 2024
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Theory Questions based on your profile or Civil Engineering
The question covers topics related to cubes casting process, slump cone testing, chemical and physical properties of cement, and types of cement.
Cubes casting process involves preparing concrete cubes and curing them for a specified period of time before testing their strength.
Slump cone testing is used to measure the consistency and workability of fresh concrete.
Chemical and physical properties of cement include setti...
Slump cone process is used to measure the consistency of cement.
A slump cone is filled with freshly mixed cement.
The cone is lifted and the cement is allowed to settle.
The difference in height between the original height of the cone and the settled height is measured.
This difference is called the slump and is an indication of the consistency of the cement.
The higher the slump, the more workable the cement is.
I applied via Walk-in and was interviewed before Jan 2022. There was 1 interview round.
I applied via Referral and was interviewed in Sep 2024. There were 3 interview rounds.
Cement is tested for its quality and strength. Types include Portland cement, rapid hardening cement, and white cement.
Cement is tested for compressive strength, fineness, setting time, soundness, and consistency.
Types of cement include Portland cement, rapid hardening cement, white cement, etc.
Example: Portland cement is commonly used in construction for its versatility and durability.
Slump cone test is used to measure the workability of concrete. The size of the slump cone is standardized.
Slump cone test is a common test used in construction to determine the consistency of concrete mix.
The size of the slump cone is typically 12 inches in height, 8 inches in diameter at the base, and 4 inches in diameter at the top.
During the test, the slump cone is filled with concrete, compacted, and then lifted o...
Whose cement is best, Complaint Handling experience?
Seeking new challenges and opportunities for growth.
Looking for a new challenge to expand my skills and knowledge.
Seeking opportunities for career advancement and growth.
Wanting to work in a more dynamic and fast-paced environment.
Interested in exploring different industries or sectors.
Desire for a better work-life balance or location change.
I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
Some things like product knowledge, channel partners.
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
I am currently located in New York City.
Living in a bustling urban environment
Close proximity to various amenities and attractions
Access to public transportation
Diverse cultural experiences
Examples: Times Square, Central Park, Broadway shows
As an Assistant Manager, my job role involves supporting the manager in overseeing daily operations, managing staff, and ensuring the smooth running of the business.
Supporting the manager in daily operations
Managing and supervising staff
Ensuring compliance with company policies and procedures
Assisting in developing and implementing strategies to improve business performance
Handling customer complaints and resolving iss...
I am a dedicated and organized individual with strong leadership skills and a passion for helping others succeed.
Dedicated and hardworking
Strong leadership skills
Passionate about helping others succeed
An erection plan is a detailed document outlining the steps and timeline for constructing a building or structure.
Includes detailed schedule of tasks and milestones
Specifies materials and equipment needed for each phase
Outlines safety measures and quality control procedures
May include diagrams or blueprints for reference
Handling complexity involves breaking down tasks, prioritizing, delegating, and staying organized.
Break down complex tasks into smaller, manageable steps
Prioritize tasks based on importance and deadlines
Delegate tasks to team members when necessary
Stay organized with to-do lists, calendars, and project management tools
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
The circuit of cement process involves various stages from raw material extraction to final product packaging.
Raw materials (such as limestone, clay, and sand) are extracted and transported to the cement plant.
The raw materials are crushed, ground, and mixed to form a raw meal.
The raw meal is heated in a kiln to produce clinker.
The clinker is ground with gypsum to produce cement.
The cement is packed into bags or shippe...
based on 2 reviews
Rating in categories
Assistant Manager
37
salaries
| ₹5.5 L/yr - ₹11.4 L/yr |
Engineer
32
salaries
| ₹2.3 L/yr - ₹6.5 L/yr |
Senior Engineer
31
salaries
| ₹3.6 L/yr - ₹7 L/yr |
Junior Engineer
22
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Junior Manager
16
salaries
| ₹5 L/yr - ₹8.1 L/yr |
Grasim Industries
UltraTech Cement
Ambuja Cements
ACC