A Head security Jaypee Rewa Assets was asked 1mo ago
Q. What are the security challenges faced in an industrial estate?
Ans. 

Industrial estates face various security challenges including theft, vandalism, and safety compliance issues.

  • Theft and Burglary: Industrial estates are often targets for theft of machinery and raw materials. For example, a factory may experience repeated break-ins.

  • Vandalism: Property damage can occur from vandalism, affecting production and safety. An example is graffiti on equipment or buildings.

  • Access Control: M...

A Civil Engineer was asked 3mo ago
Q. What are the differences between nominal mix and design mix in concrete production?
Ans. 

Nominal mix uses fixed ratios for concrete, while design mix is tailored for specific requirements and performance criteria.

  • Nominal mix is based on predefined proportions (e.g., 1:2:4 for M15 grade).

  • Design mix is calculated based on desired strength, workability, and durability.

  • Nominal mix is simpler and quicker, suitable for small projects.

  • Design mix requires lab testing and is more precise, ideal for large struc...

View all Civil Engineer interview questions
A Civil Engineer was asked 3mo ago
Q. What is the difference between compaction and consolidation?
Ans. 

Compaction is a mechanical process to increase soil density, while consolidation is a gradual process of soil settlement under load.

  • Compaction involves applying mechanical force to reduce air voids in soil, e.g., using rollers or vibratory plates.

  • Consolidation occurs over time as water is expelled from soil pores under sustained load, e.g., clay soils settling after construction.

  • Compaction is immediate and affects...

View all Civil Engineer interview questions
A Civil Engineer was asked 3mo ago
Q. What does DPC stand for?
Ans. 

DPC stands for Damp Proof Course, a barrier to prevent moisture from rising in buildings.

  • DPC is typically made of materials like bitumen, plastic, or concrete.

  • It is installed at the foundation level of a building.

  • Prevents rising damp, which can cause structural damage and health issues.

  • Commonly used in residential and commercial buildings.

  • Example: In a brick wall, a DPC is placed to stop moisture from the ground.

View all Civil Engineer interview questions
A Civil Engineer was asked 3mo ago
Q. What is the density of stone?
Ans. 

Stone density refers to the mass per unit volume of stone materials, influencing their strength and durability in construction.

  • Density is typically measured in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

  • Different types of stone have varying densities; for example, granite has a density of about 2.63 g/cm³.

  • Density affects the weight of stone, which is crucial for structural calculations...

View all Civil Engineer interview questions
A Civil Engineer was asked 3mo ago
Q. How many cubic feet are in one bag of cement?
Ans. 

One bag of cement typically contains about 1.0 cubic foot of volume when dry.

  • A standard bag of cement weighs 94 pounds.

  • 1 cubic foot of cement can fill approximately 27 cubic feet of concrete when mixed.

  • Different types of cement may have slightly different volumes.

  • For example, a 50-pound bag of cement yields about 0.5 cubic feet.

View all Civil Engineer interview questions
A Senior Project Engineer Civil was asked 4mo ago
Q. What is the purpose of a cofferdam?
Ans. 

A cofferdam is a temporary structure used to create a dry work environment in water bodies for construction projects.

  • Cofferdams are often used in bridge construction to keep the work area dry.

  • They can be made from steel, concrete, or earth materials.

  • An example is the use of cofferdams in dam construction to divert water.

  • Cofferdams help in excavation and foundation work below water level.

View all Senior Project Engineer Civil interview questions
Are these interview questions helpful?
A Senior Project Engineer Civil was asked 4mo ago
Q. What is the meaning of a D/S coffer dam?
Ans. 

D/S coffer dam refers to a temporary structure built downstream to control water flow during construction activities.

  • Coffer dams are used to create a dry work environment for construction projects in water bodies.

  • D/S stands for downstream, indicating the location of the coffer dam relative to the project site.

  • They help in preventing water from flooding the construction area, ensuring safety and efficiency.

  • Examples...

View all Senior Project Engineer Civil interview questions
A Senior Project Engineer Civil was asked 4mo ago
Q. What is the meaning of u/s coffer dam?
Ans. 

U/S coffer dam refers to a temporary structure built upstream to control water flow during construction activities.

  • Used to create a dry work environment for construction projects like dams or bridges.

  • Helps in diverting water away from the construction site.

  • Example: In dam construction, an upstream coffer dam prevents water from flooding the work area.

  • Typically made of earth, rock, or concrete materials.

View all Senior Project Engineer Civil interview questions
A Senior Project Engineer Civil was asked 4mo ago
Q. What is the meaning of HRT in a hydropower project?
Ans. 

H.R.T. in hydro power projects stands for Head Race Tunnel, crucial for water conveyance to turbines.

  • H.R.T. is a tunnel that directs water from the reservoir to the power station.

  • It helps maintain a consistent flow of water, optimizing energy generation.

  • Example: In large hydro projects, H.R.T. can be several kilometers long.

  • Proper design of H.R.T. minimizes water loss and maximizes efficiency.

View all Senior Project Engineer Civil interview questions

The Jaypee Group Interview Experiences

47 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Coding Test 

@akhoon kamla clamp kuta clamp

Round 3 - Technical 

(7 Questions)

  • Q1. What is the name of rode who installed before shutdown of HT line work
  • Ans. 

    The name of the rode installer before the shutdown of HT line work is not provided.

    • The name of the rode installer was not mentioned in the question.

    • It is important to have proper documentation of all workers involved in such tasks.

    • Without specific information, it is not possible to determine the name of the rode installer.

  • Answered by AI
  • Q2. How much feet grouting of stp pole
  • Ans. 

    The amount of grouting required for an STP pole is typically measured in cubic feet.

    • Grouting of an STP pole is usually done to secure it in place and provide stability.

    • The amount of grouting needed depends on the size and depth of the hole where the pole is placed.

    • Calculations are based on the volume of the hole and the density of the grouting material.

    • For example, a standard 10-foot STP pole may require 1-2 cubic feet...

  • Answered by AI
  • Q3. How much destance single srket pole to pole
  • Ans. 

    The distance between single street poles varies depending on the location and purpose of the poles.

    • The distance between single street poles can range from 50 feet to 200 feet in urban areas.

    • In rural areas, the distance between poles can be as much as 400 feet or more.

    • The distance between poles may also be determined by the type of utility lines running between them, such as power lines, telephone lines, or cable lines.

  • Answered by AI
  • Q4. How much meters long one span of HT line
  • Ans. 

    The length of one span of HT line varies depending on the specific installation and design.

    • The length of one span of HT line can range from 50 meters to 200 meters or more.

    • Factors such as terrain, voltage level, and design specifications can influence the length of a span.

    • For example, in hilly terrain, the span length may be shorter to account for elevation changes.

    • In urban areas with limited space, shorter spans may b...

  • Answered by AI
  • Q5. How much wire can install HT line single srket
  • Ans. 

    The amount of wire needed to install a HT line single srket depends on the length and specifications of the line.

    • The amount of wire required will depend on the length of the HT line

    • Consider the specifications of the HT line, such as the voltage rating and current capacity

    • Factors like terrain, weather conditions, and safety regulations may also impact the amount of wire needed

  • Answered by AI
  • Q6. What is the name of centre wire pin insulation
  • Ans. 

    The name of the centre wire pin insulation is called dielectric

    • Dielectric material is used to insulate the centre wire pin in cables

    • It helps to prevent electrical leakage and maintain signal integrity

    • Common examples of dielectric materials include polyethylene, polypropylene, and Teflon

  • Answered by AI
  • Q7. Who much feet muffing can do it

Interview Preparation Tips

Interview preparation tips for other job seekers - Before starting work you have to wear sefty belt jacket and shoes helmet ⛑️ for owsom work
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. In which type tunnel exvation
  • Ans. 

    Tunnel excavation involves various methods depending on geology, purpose, and environment, including cut-and-cover and boring techniques.

    • Cut-and-Cover: Used for shallow tunnels, involves digging a trench and covering it. Example: subway systems.

    • Bored Tunneling: Suitable for deep tunnels, uses tunnel boring machines (TBMs). Example: water supply tunnels.

    • Drill and Blast: Common in hard rock, involves drilling holes and b...

  • Answered by AI
  • Q2. What is the mean of cofferdam
  • Ans. 

    A cofferdam is a temporary structure used to create a dry work environment in water bodies for construction projects.

    • Cofferdams are often used in bridge construction to keep the work area dry.

    • They can be made from steel, concrete, or earth materials.

    • An example is the use of cofferdams in dam construction to divert water.

    • Cofferdams help in excavation and foundation work below water level.

  • Answered by AI
  • Q3. What is meaning ofH.R.T. in hydro power project.
  • Ans. 

    H.R.T. in hydro power projects stands for Head Race Tunnel, crucial for water conveyance to turbines.

    • H.R.T. is a tunnel that directs water from the reservoir to the power station.

    • It helps maintain a consistent flow of water, optimizing energy generation.

    • Example: In large hydro projects, H.R.T. can be several kilometers long.

    • Proper design of H.R.T. minimizes water loss and maximizes efficiency.

  • Answered by AI
  • Q4. What is meaning of u/s coffer dam
  • Ans. 

    U/S coffer dam refers to a temporary structure built upstream to control water flow during construction activities.

    • Used to create a dry work environment for construction projects like dams or bridges.

    • Helps in diverting water away from the construction site.

    • Example: In dam construction, an upstream coffer dam prevents water from flooding the work area.

    • Typically made of earth, rock, or concrete materials.

  • Answered by AI
  • Q5. Whatis meaning of D/S coffer dam
  • Ans. 

    D/S coffer dam refers to a temporary structure built downstream to control water flow during construction activities.

    • Coffer dams are used to create a dry work environment for construction projects in water bodies.

    • D/S stands for downstream, indicating the location of the coffer dam relative to the project site.

    • They help in preventing water from flooding the construction area, ensuring safety and efficiency.

    • Examples incl...

  • Answered by AI

Research Analyst Interview Questions & Answers

user image Vikrmaditya Thakur

posted on 8 Nov 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is Primary Research
  • Ans. 

    Primary research involves collecting data directly from original sources.

    • Involves collecting data directly from original sources

    • Examples include surveys, interviews, observations, and experiments

    • Helps in obtaining specific and relevant information for a research study

  • Answered by AI
  • Q2. What is Secondary Research
  • Ans. 

    Secondary research involves gathering information from existing sources such as books, articles, and reports.

    • Secondary research is the process of collecting and analyzing data that has already been published or exists in some form.

    • It is used to gain a better understanding of a topic or to support primary research findings.

    • Examples of secondary research sources include academic journals, government publications, and mar...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Civil Engineer Interview Questions & Answers

user image Deepak Chauhan

posted on 2 Apr 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. What is the difference between compaction and consolidation?
  • Ans. 

    Compaction is a mechanical process to increase soil density, while consolidation is a gradual process of soil settlement under load.

    • Compaction involves applying mechanical force to reduce air voids in soil, e.g., using rollers or vibratory plates.

    • Consolidation occurs over time as water is expelled from soil pores under sustained load, e.g., clay soils settling after construction.

    • Compaction is immediate and affects the ...

  • Answered by AI
  • Q2. What are the differences between nominal mix and design mix in concrete production?
  • Ans. 

    Nominal mix uses fixed ratios for concrete, while design mix is tailored for specific requirements and performance criteria.

    • Nominal mix is based on predefined proportions (e.g., 1:2:4 for M15 grade).

    • Design mix is calculated based on desired strength, workability, and durability.

    • Nominal mix is simpler and quicker, suitable for small projects.

    • Design mix requires lab testing and is more precise, ideal for large structures...

  • Answered by AI
  • Q3. What does DPC stand for?
  • Ans. 

    DPC stands for Damp Proof Course, a barrier to prevent moisture from rising in buildings.

    • DPC is typically made of materials like bitumen, plastic, or concrete.

    • It is installed at the foundation level of a building.

    • Prevents rising damp, which can cause structural damage and health issues.

    • Commonly used in residential and commercial buildings.

    • Example: In a brick wall, a DPC is placed to stop moisture from the ground.

  • Answered by AI
  • Q4. How much cubic feet in 1 bag of cement
  • Ans. 

    One bag of cement typically contains about 1.0 cubic foot of volume when dry.

    • A standard bag of cement weighs 94 pounds.

    • 1 cubic foot of cement can fill approximately 27 cubic feet of concrete when mixed.

    • Different types of cement may have slightly different volumes.

    • For example, a 50-pound bag of cement yields about 0.5 cubic feet.

  • Answered by AI
  • Q5. What is stone density ?
  • Ans. 

    Stone density refers to the mass per unit volume of stone materials, influencing their strength and durability in construction.

    • Density is typically measured in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • Different types of stone have varying densities; for example, granite has a density of about 2.63 g/cm³.

    • Density affects the weight of stone, which is crucial for structural calculations in e...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. Fire and safety
  • Q2. Sequrity sup rivision
  • Q3. Sequrity manegement
  • Q4. First aid ⛑️

Interview Questions & Answers

user image Anonymous

posted on 2 Jul 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Slump test Plotting development
  • Q2. Cube test How many type of concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - Well company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Explain about your previous experiences.
  • Ans. 

    I have over 5 years of experience in administrative roles, including managing office operations, coordinating meetings, and handling correspondence.

    • Managed office operations efficiently

    • Coordinated meetings and events

    • Handled correspondence and communication with clients

    • Maintained records and databases

    • Assisted in budgeting and financial tasks

  • Answered by AI
  • Q2. Why do you want to join us?
  • Ans. 

    I want to join your organization because of its reputation for innovation and commitment to employee development.

    • I am impressed by the organization's track record of success in the industry.

    • I believe that the company's values align with my own professional goals.

    • I am excited about the opportunity to contribute to a team that values collaboration and growth.

    • I have heard positive feedback from current employees about the...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. About relationship management
  • Q2. Data analysis
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Mechanical engineering production
  • Q2. Oil and gas fertilizer devision
  • Ans. 

    Oil and gas fertilizer division involves the production and distribution of fertilizers derived from oil and gas byproducts.

    • Fertilizers are produced using byproducts from the oil and gas industry, such as natural gas liquids or sulfur.

    • The fertilizers produced can include nitrogen-based fertilizers like ammonia or urea, as well as sulfur-based fertilizers like ammonium sulfate.

    • The division may involve processes such as ...

  • Answered by AI
  • Q3. Respected sir/ma'am, I Suresh attaching my brief resume for your kind consideration in your organisation. Pls take a look and let me know if any opportunity is there with you. ...
  • Q4. Respected sir/ma'am, I Suresh attaching my brief resume for your kind consideration in your organisation. Pls take a look and let me know if any opportunity is there with you. ...
Round 3 - Group Discussion 

Previous experience and job profile and working

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 

Normal introduction and interview

Round 3 - Technical 

(5 Questions)

  • Q1. Type of electrical motor
  • Ans. 

    There are various types of electrical motors including AC motors, DC motors, synchronous motors, and induction motors.

    • AC motors: commonly used in household appliances and industrial applications

    • DC motors: used in applications where speed control is important, such as in electric vehicles

    • Synchronous motors: used in applications where precise speed control is required, such as in clocks and timers

    • Induction motors: widely...

  • Answered by AI
  • Q2. 3 phase induction motor starter
  • Q3. Protection of transformer
  • Ans. 

    Protection of transformer involves measures to prevent damage from overcurrent, overvoltage, and overheating.

    • Use overcurrent protection devices such as fuses and circuit breakers to prevent damage from excessive current flow.

    • Install overvoltage protection devices like surge arresters to safeguard against voltage spikes.

    • Implement temperature monitoring systems to prevent overheating, such as thermal sensors and cooling ...

  • Answered by AI
  • Q4. ACB VCB maintenance
  • Q5. Star delta connection

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical basic knowledge

Interview Questions & Answers

user image vijay kumar jha

posted on 16 Oct 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Hazop study is mandatory

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to Assistant stores manager operations working
  • Ans. 

    Assistant store managers oversee daily operations to ensure smooth functioning of the store.

    • Assist in managing inventory levels and ordering products as needed

    • Supervise and train staff to provide excellent customer service

    • Handle customer complaints and resolve issues in a timely manner

    • Ensure store cleanliness and organization

    • Monitor sales performance and implement strategies to increase revenue

  • Answered by AI
  • Q2. Assistant stores manager kiya work karna chahiye
  • Ans. 

    Assistant Store Managers should focus on team leadership, inventory management, customer service, and operational efficiency.

    • Team Leadership: Motivate and guide staff to achieve sales targets, like organizing team meetings to boost morale.

    • Inventory Management: Ensure stock levels are maintained, such as conducting regular inventory checks to avoid shortages.

    • Customer Service: Address customer complaints effectively, for...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please help me interview questions d

Top trending discussions

View All
Interview Tips & Stories
6d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about The Jaypee Group?
Ask anonymously on communities.

The Jaypee Group Interview FAQs

How many rounds are there in The Jaypee Group interview?
The Jaypee Group interview process usually has 2-3 rounds. The most common rounds in the The Jaypee Group interview process are Resume Shortlist, Technical and HR.
How to prepare for The Jaypee Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at The Jaypee Group. The most common topics and skills that interviewers at The Jaypee Group expect are Building Construction, Management, Civil, Monitoring and Construction.
What are the top questions asked in The Jaypee Group interview?

Some of the top questions asked at the The Jaypee Group interview -

  1. What is the name of rode who installed before shutdown of HT line w...read more
  2. Which type emergency handle in your pl...read more
  3. Working principle of thermocouple and there ty...read more
What are the most common questions asked in The Jaypee Group HR round?

The most common HR questions asked in The Jaypee Group interview are -

  1. Why are you looking for a chan...read more
  2. What is your family backgrou...read more
  3. What are your salary expectatio...read more
How long is the The Jaypee Group interview process?

The duration of The Jaypee Group interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.4/5

based on 51 interview experiences

Difficulty level

Easy 28%
Moderate 61%
Hard 11%

Duration

Less than 2 weeks 74%
2-4 weeks 16%
More than 8 weeks 11%
View more

The Jaypee Group Reviews and Ratings

based on 1.1k reviews

3.8/5

Rating in categories

3.6

Skill development

3.7

Work-life balance

3.3

Salary

4.0

Job security

3.6

Company culture

3.0

Promotions

3.6

Work satisfaction

Explore 1.1k Reviews and Ratings
Experience Purchase Executive

Kolkata

9-13 Yrs

Not Disclosed

Regional Sales Manager

Kolkata

14-17 Yrs

Not Disclosed

Explore more jobs
Field Engineer
163 salaries
unlock blur

₹2.7 L/yr - ₹7.6 L/yr

Senior Field Engineer
71 salaries
unlock blur

₹4.9 L/yr - ₹8.2 L/yr

Resident Engineer
55 salaries
unlock blur

₹5.7 L/yr - ₹11.7 L/yr

Assistant Manager
47 salaries
unlock blur

₹4.8 L/yr - ₹10.1 L/yr

Senior Engineer
42 salaries
unlock blur

₹5.5 L/yr - ₹9.1 L/yr

Explore more salaries
Compare The Jaypee Group with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
write
Share an Interview