The .nwc, .nwd, and .nwf formats are used in Autodesk Navisworks for different purposes in project collaboration and visualization.
.nwc: Navisworks Cache file, used for importing and storing 3D model data from various sources.
.nwd: Navisworks Document file, a standalone file that contains all model data and can be shared with others.
.nwf: Navisworks File Set, a project file that references multiple .nwc files, all...
BIM (Building Information Modeling) is a digital representation of physical and functional characteristics of a facility.
BIM integrates 3D modeling with data management, enhancing collaboration among stakeholders.
It allows for better visualization of MEP systems, reducing conflicts during construction.
BIM can simulate energy performance, helping to design more sustainable buildings.
Examples include using BIM for H...
Xref, or external reference, is a feature in CAD software that allows linking to external drawings or files for better collaboration.
Xrefs help manage large projects by linking to separate files instead of embedding them directly.
They allow multiple users to work on different parts of a project simultaneously.
For example, an architectural drawing can be xref'd into an MEP model to ensure coordination.
Changes made ...
Layouts in AutoCAD are views of the drawing sheet where you can arrange and display your drawing in different ways.
Layouts in AutoCAD allow you to create multiple views of your drawing on a single sheet.
You can set different scales, viewports, and annotations for each layout.
Layouts are useful for presenting your drawing in different formats, such as plans, elevations, and sections.
BIM dimensions refer to different aspects of a building model such as width, height, depth, time, cost, and sustainability.
BIM dimensions include 3D (width, height, depth), 4D (time scheduling), 5D (cost estimation), and 6D (sustainability analysis).
Each dimension adds a layer of information and functionality to the building model.
For example, 4D BIM can help in visualizing the construction sequence and identifyin...
RFIs are generated by identifying design conflicts, documenting the issue, proposing a solution, and sending to the client for approval.
Identify design conflicts within the BIM model
Document the issue with clear descriptions and visuals
Propose a solution or alternative design
Send the RFI to the client for approval or further clarification
Layers and block attributes are not directly applicable in Revit as they are in AutoCAD.
Revit does not have a concept of layers like AutoCAD. Instead, elements are organized by categories and subcategories.
Block attributes in AutoCAD are similar to families in Revit, which are reusable groups of elements with predefined properties.
In Revit, parameters are used to define and control the properties of elements, simi...
LOD 300/400 refers to Level of Development in Building Information Modeling, indicating the level of detail and accuracy of the model.
LOD 300 typically includes accurate representation of the building's components and systems, with some specific system information.
LOD 400 includes more detailed information such as specific assemblies, precise quantities, and detailed fabrication and installation information.
These ...
I have extensive knowledge and experience with Revit and other BIM software.
Proficient in creating 3D models, drawings, and schedules using Revit
Experienced in coordinating MEP systems within a BIM environment
Knowledgeable in clash detection and resolution using BIM software
Familiar with Navisworks for project coordination and collaboration
Toolbar details refer to the various options and functions available on the toolbar of a software or application.
Toolbar details typically include icons for different tools or functions such as save, print, cut, copy, paste, etc.
The toolbar may also have dropdown menus for additional options or settings.
Users can customize the toolbar by adding or removing specific tools based on their preferences.
Toolbar details ...
I appeared for an interview in Aug 2024.
My previous role as a BIM Coordinator involved creating and managing 3D models, which is directly relevant to this position as a BIM Architectural Designer.
Experience in creating and managing 3D models using BIM software
Collaborating with architects and engineers to ensure design accuracy
Knowledge of building codes and regulations
Ability to interpret architectural drawings and translate them into 3D models
I switched to a different vertical to broaden my skills and knowledge in the industry.
To gain new perspectives and experiences
To challenge myself and grow professionally
To explore new opportunities and expand my expertise
To stay current with industry trends and technologies
LOD 300/400 refers to Level of Development in Building Information Modeling, indicating the level of detail and accuracy of the model.
LOD 300 typically includes accurate representation of the building's components and systems, with some specific system information.
LOD 400 includes more detailed information such as specific assemblies, precise quantities, and detailed fabrication and installation information.
These level...
BIM dimensions refer to different aspects of a building model such as width, height, depth, time, cost, and sustainability.
BIM dimensions include 3D (width, height, depth), 4D (time scheduling), 5D (cost estimation), and 6D (sustainability analysis).
Each dimension adds a layer of information and functionality to the building model.
For example, 4D BIM can help in visualizing the construction sequence and identifying pot...
Worksets, View Range, and View Templates are important features in Revit for organizing and controlling views.
Worksets allow multiple users to work on different parts of a project simultaneously.
View Range controls the visibility and display of elements within a view.
View Templates are pre-defined settings that can be applied to views for consistency and efficiency.
Yes, I have worked on central file and the Common Data Environment (CDE) in my previous organization.
I have experience working on central files in BIM software such as Revit or ArchiCAD.
I am familiar with managing and coordinating project data within a CDE to ensure all team members have access to the most up-to-date information.
I have collaborated with other disciplines to ensure data integrity and consistency within ...
Layouts in AutoCAD are views of the drawing sheet where you can arrange and display your drawing in different ways.
Layouts in AutoCAD allow you to create multiple views of your drawing on a single sheet.
You can set different scales, viewports, and annotations for each layout.
Layouts are useful for presenting your drawing in different formats, such as plans, elevations, and sections.
Layers and block attributes are not directly applicable in Revit as they are in AutoCAD.
Revit does not have a concept of layers like AutoCAD. Instead, elements are organized by categories and subcategories.
Block attributes in AutoCAD are similar to families in Revit, which are reusable groups of elements with predefined properties.
In Revit, parameters are used to define and control the properties of elements, similar t...
Experience in creating families in Revit for architectural design projects.
Extensive experience in creating custom families for various architectural elements such as doors, windows, furniture, etc.
Proficiency in using Revit's family editor to modify existing families or create new ones from scratch.
Ability to troubleshoot and resolve issues related to family creation in Revit.
Understanding of how families impact the o...
RFIs are generated by identifying design conflicts, documenting the issue, proposing a solution, and sending to the client for approval.
Identify design conflicts within the BIM model
Document the issue with clear descriptions and visuals
Propose a solution or alternative design
Send the RFI to the client for approval or further clarification
I applied via Walk-in
I have extensive knowledge and experience with Revit and other BIM software.
Proficient in creating 3D models, drawings, and schedules using Revit
Experienced in coordinating MEP systems within a BIM environment
Knowledgeable in clash detection and resolution using BIM software
Familiar with Navisworks for project coordination and collaboration
I applied via Walk-in
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
I have over 10 years of experience working in various architectural firms, specializing in BIM technology.
Over 10 years of experience in architectural firms
Specialize in BIM technology
Worked on projects ranging from residential to commercial buildings
I appeared for an interview in Nov 2024, where I was asked the following questions.
I appeared for an interview in Sep 2024, where I was asked the following questions.
BIM families are categorized into three main types: system families, loadable families, and in-place families.
System Families: Predefined families that cannot be loaded or modified, e.g., walls, floors, roofs.
Loadable Families: Custom families created by users, e.g., furniture, fixtures, equipment.
In-Place Families: Families created within a specific project context, e.g., unique architectural features.
I appeared for an interview before Jun 2024, where I was asked the following questions.
Level of Detail (LOD) defines the precision of a building model at various stages of development.
LOD 100: Conceptual design with basic massing and area information.
LOD 200: Generalized systems and components with approximate quantities.
LOD 300: Precise geometry and dimensions for construction documentation.
LOD 400: Fabrication details and assembly information for construction.
LOD 500: As-built model reflecting the actu...
The .nwc, .nwd, and .nwf formats are used in Autodesk Navisworks for different purposes in project collaboration and visualization.
.nwc: Navisworks Cache file, used for importing and storing 3D model data from various sources.
.nwd: Navisworks Document file, a standalone file that contains all model data and can be shared with others.
.nwf: Navisworks File Set, a project file that references multiple .nwc files, allowing...
Tolerance in Navisworks refers to the allowable deviation in model geometry for effective clash detection.
Tolerance defines the acceptable limits of variation in model elements during clash detection.
For example, a tolerance of 5mm means that two elements can be considered clashing if they are within 5mm of each other.
Setting appropriate tolerance levels helps in reducing false positives in clash detection.
In Naviswork...
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Types of LOD (Level of Development) include LOD 100, LOD 200, LOD 300, LOD 400, and LOD 500.
LOD 100: Conceptual design with basic geometric shapes.
LOD 200: Design development with more detailed elements and approximate quantities.
LOD 300: Fully coordinated model with accurate quantities and sizes.
LOD 400: Fabrication and assembly details included.
LOD 500: As-built model with exact details for maintenance and operations...
I applied via LinkedIn and was interviewed in Jul 2023. There were 3 interview rounds.
I am a passionate BIM Architect with over 5 years of experience in designing and managing building information models.
Expert in software like Revit and Navisworks, having led a project that improved collaboration among architects and engineers.
Strong background in sustainable design, contributing to a project that achieved LEED certification.
Experience in coordinating multidisciplinary teams, ensuring seamless integrat...
LOD levels are used in BIM to specify the level of detail in a model, ranging from LOD 100 to LOD 500.
LOD 100 - Conceptual design with basic massing and spatial relationships
LOD 200 - Basic geometric elements with approximate quantities and sizes
LOD 300 - Accurate model with specific system information and quantities
LOD 400 - Fabrication level of detail with detailed elements and connections
LOD 500 - As-built model wit...
Workset in Revit is a way to organize and manage elements within a project.
Worksets allow users to control visibility, editing permissions, and ownership of elements
They can be used to divide a project into manageable sections for team collaboration
Examples include creating worksets for different disciplines like architecture, structure, and MEP
BIM 360 is a cloud-based platform for construction project management, collaboration, and data sharing.
BIM 360 allows for real-time collaboration among project teams
It provides tools for document management, design coordination, and quality control
Users can access project information from anywhere, at any time
Top trending discussions
Some of the top questions asked at the The BIM Engineers interview -
The duration of The BIM Engineers interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 35 interview experiences
Difficulty level
Duration
based on 199 reviews
Rating in categories
BIM Engineer
196
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
BIM Architect
121
salaries
| ₹3.4 L/yr - ₹7.5 L/yr |
MEP Bim Engineer
59
salaries
| ₹4 L/yr - ₹7.2 L/yr |
BIM Modeller
51
salaries
| ₹2.4 L/yr - ₹7.3 L/yr |
Senior BIM Engineer
48
salaries
| ₹4.3 L/yr - ₹9 L/yr |
AECOM
AtkinsRealis
Saipem
Nasser S. Al Hajri Corporation