i
Tesco
Filter interviews by
Focus on basics of your study
Slump value of column is a measure of consistency of fresh concrete.
Slump value is determined by measuring the change in height of the concrete when a cone is removed.
It indicates the workability of the concrete mix.
Different slump values are required for different types of construction projects.
For example, a high slump value is needed for concrete that needs to be pumped long distances.
Top trending discussions
I applied via Referral and was interviewed in Aug 2023. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jun 2023. There were 2 interview rounds.
Good environment and giving chance to share the knowledge
To install Linux on the laptop, you need to create a bootable USB drive or DVD with the Linux distribution of your choice and then boot from it.
Download the Linux distribution of your choice from the official website
Create a bootable USB drive or DVD using software like Rufus or Etcher
Insert the bootable USB drive or DVD into the laptop and restart it
Press the key to enter the boot menu (usually F12 or Esc)
Select the b...
I applied via Monster and was interviewed before Aug 2020. There was 1 interview round.
Interview experience
Senior Associate
474
salaries
| ₹3.2 L/yr - ₹10 L/yr |
Associate
214
salaries
| ₹2.2 L/yr - ₹7.8 L/yr |
Software Development Engineer II
201
salaries
| ₹20.5 L/yr - ₹58 L/yr |
Team Lead
177
salaries
| ₹5 L/yr - ₹16.7 L/yr |
Software Engineer
157
salaries
| ₹2.8 L/yr - ₹9.8 L/yr |
Walmart
Carrefour
Amazon
Reliance Retail