I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.
MQP stands for Manufacturing Quality Plan. It is a document that outlines the quality control processes and procedures for manufacturing a product.
MQP includes details on quality control checkpoints throughout the manufacturing process.
It specifies the quality standards that need to be met for the product.
It outlines the responsibilities of different team members in ensuring quality control.
Examples of documents provid...
FMEA stands for Failure Mode and Effects Analysis. RPN value is Risk Priority Number calculated by multiplying severity, occurrence, and detection ratings.
FMEA is a systematic method for identifying and prioritizing potential failure modes in a process or product.
RPN value is calculated by multiplying severity, occurrence, and detection ratings assigned to each potential failure mode.
RPN helps prioritize which failure ...
A flow chart diagram is a visual representation of a process or workflow using symbols and arrows.
Flow chart diagrams use different shapes to represent different steps or actions in a process.
Arrows are used to show the flow of the process from one step to another.
Common symbols used in flow charts include rectangles for processes, diamonds for decisions, and ovals for start/end points.
Flow charts are helpful in visual...
PFMEA stands for Process Failure Mode and Effects Analysis. It is a structured approach to identifying and prioritizing potential failure modes in a process.
PFMEA is used to anticipate and prevent potential failures in a process by identifying failure modes, their causes, and their effects.
It involves ranking failure modes based on their severity, occurrence, and detection, to prioritize improvement efforts.
PFMEA helps...
PFMEA stands for Process Failure Mode and Effects Analysis, MQP stands for Manufacturing Quality Plan, QA focuses on preventing defects while QC focuses on identifying defects.
PFMEA is a structured approach to identifying and prioritizing potential failure modes in a process and their effects.
MQP is a document that outlines the quality control processes and procedures for manufacturing a product.
QA (Quality Assurance) ...
Top trending discussions
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Referral and was interviewed before Jul 2021. There was 1 interview round.
posted on 11 Oct 2020
I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 16 Oct 2024
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
posted on 2 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
based on 1 interview
Interview experience
Assistant Manager
73
salaries
| ₹5 L/yr - ₹10.8 L/yr |
Senior Engineer
46
salaries
| ₹4.7 L/yr - ₹8.1 L/yr |
Junior Engineer
38
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Associate Engineer
23
salaries
| ₹2.1 L/yr - ₹5 L/yr |
Graduate Engineer Trainee (Get)
22
salaries
| ₹3.2 L/yr - ₹7 L/yr |
Thermax Limited
ABB
Isgec Heavy Engineering
Kirloskar Oil Engines