I applied via Campus Placement and was interviewed in Feb 2022. There were 2 interview rounds.
Easy to moderate
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
based on 1 review
Rating in categories
Senior Engineer
127
salaries
| ₹6.2 L/yr - ₹22 L/yr |
Process Engineer
125
salaries
| ₹3.8 L/yr - ₹14 L/yr |
Senior Principal Engineer
113
salaries
| ₹15 L/yr - ₹35 L/yr |
Piping Designer
105
salaries
| ₹3.7 L/yr - ₹12.8 L/yr |
Deputy Manager
95
salaries
| ₹7 L/yr - ₹23 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM