Filter interviews by
I applied via Company Website and was interviewed before Sep 2021. There were 4 interview rounds.
I have a strong profile and extensive experience in project management.
Over 10 years of experience in leading and delivering successful projects
Proven track record of managing large cross-functional teams
Expertise in budgeting, resource allocation, and risk management
Strong communication and stakeholder management skills
Experience in various industries including technology, construction, and healthcare
Electrical engineering involves the study and application of electricity, electronics, and electromagnetism.
Designing and testing electrical systems and equipment
Developing and implementing electrical projects
Troubleshooting and repairing electrical issues
Collaborating with other engineers and professionals
Examples: designing power grids, developing renewable energy sources, creating electronic devices
Top trending discussions
posted on 27 Dec 2020
I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.
posted on 23 Feb 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
To improve profitability, focus on cost reduction, increasing revenue, and optimizing processes.
Identify and eliminate unnecessary expenses
Increase sales through marketing strategies or expanding product offerings
Streamline operations to reduce waste and improve efficiency
posted on 16 Feb 2025
I appeared for an interview before Feb 2024.
posted on 8 Jun 2023
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, schedule, and budget.
Executing: Implement the project plan and manage resources.
Monitoring: Track progress, identify issues, and make adjustments.
Closing: Finalize project deliverables and evaluate project success.
I have expertise in using various planning software such as Microsoft Project, Asana, and Trello to effectively manage projects.
Proficient in creating project plans, assigning tasks, and tracking progress using planning software
Skilled in resource allocation, budget management, and timeline scheduling within the software
Experience in generating reports, Gantt charts, and project timelines for stakeholders
Familiar with ...
I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.
posted on 13 Feb 2023
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
Lap is used in the center of a column or Zone B for structural stability and reinforcement.
Lap joints provide additional strength and stability to the column.
They help in distributing the load evenly across the column.
Lap joints prevent the column from cracking or failing under heavy loads.
Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.
By using lap in the...
Construction joints are provided at mid-span of simply supported slabs.
Construction joints are provided to allow for differential movement between adjacent sections of the slab.
They are typically located at mid-span of the slab, where the bending moment is zero.
The joint should be designed to transfer shear and moment between the two sections of the slab.
Proper reinforcement detailing is necessary to ensure the joint f...
L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.
L/6 is used for residential buildings while L/3 is used for commercial buildings.
The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.
For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...
I appeared for an interview in Mar 2025, where I was asked the following questions.
posted on 11 Apr 2020
Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.
Set clear and measurable goals for the company
Monitor progress regularly and make adjustments as needed
Optimize processes to increase efficiency and reduce costs
Make data-driven decisions based on financial and operational data
Invest in employee training and development to improve perf...
I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.
Implement safety protocols to ensure compliance
Provide proper training to all personnel
Regularly inspect and maintain equipment
Enforce strict adherence to safety guidelines
Monitor and evaluate performance regularly
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
based on 1 review
Rating in categories
Assistant Manager
484
salaries
| ₹4.5 L/yr - ₹13 L/yr |
Manager
354
salaries
| ₹6.1 L/yr - ₹17 L/yr |
Senior Engineer
352
salaries
| ₹3.6 L/yr - ₹10.8 L/yr |
Senior Manager
301
salaries
| ₹10 L/yr - ₹24 L/yr |
Consultant
248
salaries
| ₹4 L/yr - ₹13.1 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company