The main reason for belt joint failure is usually due to improper installation or maintenance.
Improper installation of the belt joint, such as incorrect alignment or tensioning
Lack of proper maintenance, leading to wear and tear of the joint
Use of low-quality materials for the joint
Excessive load or stress on the belt joint
Environmental factors like temperature or humidity affecting the joint
The alignment maximum tolerance refers to the maximum allowable deviation from the specified alignment.
Alignment maximum tolerance is the maximum allowable deviation from the specified alignment.
It is typically expressed in terms of a percentage or a specific measurement unit.
For example, a machine part may have an alignment maximum tolerance of +/- 0.005 inches.
Exceeding the alignment maximum tolerance can lead to per
To replace the bucket wheel reclaimer luffing cylinder, follow these steps.
1. Shut down the machine and ensure all power sources are disconnected.
2. Remove any surrounding components that may obstruct access to the luffing cylinder.
3. Use appropriate tools to disconnect the hydraulic hoses and fittings from the cylinder.
4. Support the weight of the cylinder as it is removed to prevent damage to surrounding components.
5...
JSA stands for Job Safety Analysis, focusing on specific job tasks, while HIRA stands for Hazard Identification and Risk Assessment, focusing on overall workplace hazards.
JSA is task-specific, focusing on individual job tasks and potential hazards
HIRA is broader, looking at overall workplace hazards and assessing risks
JSA involves breaking down a job into steps and identifying potential hazards for each step
HIRA involv...
To create a PR in SAP, you can use transaction code ME51N or ME21N.
Use transaction code ME51N to create a purchase requisition in SAP.
Enter the necessary details such as material, quantity, delivery date, etc.
Save the purchase requisition and it will be created in the system.
Alternatively, you can also use transaction code ME21N to create a purchase order directly.
The procedure of pulley replacement involves identifying the faulty pulley, removing the old pulley, installing the new pulley, and testing the system.
Identify the faulty pulley by checking for any signs of wear or damage.
Use appropriate tools to remove the old pulley, such as a pulley puller or wrench.
Install the new pulley by aligning it properly and securing it in place.
Test the system to ensure the new pulley is fu...
PTW stands for Permit to Work, a procedure used to ensure that work is carried out safely in potentially hazardous environments.
PTW is a formal written system used to control certain types of work that are identified as potentially hazardous.
Before starting work, a permit must be obtained from a designated authority.
The permit outlines the work to be done, the hazards involved, and the necessary precautions to be taken...
The AIAG manual Daily Work Management is a guide for managing daily work activities in the automotive industry.
The manual provides guidelines for managing daily work activities such as production planning, scheduling, and quality control.
It emphasizes the importance of continuous improvement and problem-solving techniques.
The manual also includes tools and templates for tracking and analyzing data to identify areas for...
posted on 24 Jun 2024
posted on 10 Sep 2020
I applied via Referral and was interviewed before Sep 2019. There were 4 interview rounds.
I will prioritize and delegate tasks, find cost-effective solutions, and communicate effectively with the team.
Prioritize tasks based on urgency and importance
Delegate tasks to team members based on their strengths and workload
Find cost-effective solutions by analyzing data and brainstorming with the team
Communicate effectively with the team to ensure everyone is on the same page and working towards the same goal
Regula
posted on 26 Jul 2024
I have 5 years of experience in substation maintenance, including incident response and resolution.
Managed regular maintenance schedules for substation equipment
Responded to and resolved incidents such as power outages or equipment failures
Implemented safety protocols to prevent future incidents
Trained team members on proper maintenance procedures
Collaborated with engineers to improve substation efficiency
The AIAG manual Daily Work Management is a guide for managing daily work activities in the automotive industry.
The manual provides guidelines for managing daily work activities such as production planning, scheduling, and quality control.
It emphasizes the importance of continuous improvement and problem-solving techniques.
The manual also includes tools and templates for tracking and analyzing data to identify areas for...
posted on 1 Sep 2022
I applied via Company Website and was interviewed in Jul 2022. There were 3 interview rounds.
Manpower management involves proper allocation and utilization of resources, documentation ensures accountability, and safety measures are crucial for a secure work environment.
Create a detailed manpower plan outlining roles, responsibilities, and tasks for each team member.
Regularly assess workload and adjust manpower allocation as needed to ensure efficiency.
Implement a documentation system to track progress, identif...
posted on 4 Dec 2021
I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.
To find bearing details from bearing number, refer to bearing catalogs or manufacturer's website.
Refer to bearing catalogs or manufacturer's website for detailed information
Search for the bearing number on the manufacturer's website to find specifications, dimensions, load ratings, and other details
Consult the bearing catalog to understand the type of bearing, its construction, and its applications
Contact the manufactu...
Coal yard management involves efficient handling, storage, and transportation of coal.
Ensure proper storage and handling of coal to prevent contamination and loss
Implement safety measures to prevent accidents and injuries
Regularly inspect and maintain equipment to ensure smooth operations
Monitor coal inventory and plan for timely replenishment
Coordinate with suppliers and transporters for timely delivery of coal
Impleme...
SCC stands for Social Cost of Carbon and is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions.
SCC is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions
It takes into account the long-term effects of climate change on agriculture, health, property damage, and other factors
The SCC value is used to determine the cost-effectiveness of polic...
posted on 26 Jul 2024
I have 5 years of experience in substation maintenance, including incident response and resolution.
Managed regular maintenance schedules for substation equipment
Responded to and resolved incidents such as power outages or equipment failures
Implemented safety protocols to prevent future incidents
Trained team members on proper maintenance procedures
Collaborated with engineers to improve substation efficiency
based on 1 review
Rating in categories
Customer Service Engineer
19
salaries
| ₹1.5 L/yr - ₹3.2 L/yr |
Service Engineer
16
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Executive Accountant
8
salaries
| ₹2.3 L/yr - ₹5.7 L/yr |
Assistant Project Engineer
8
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
Customer Service Officer
8
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Gilbarco Veeder Root
Dover India
Bennett University
Petroserv