Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by Tata Power Team. If you also belong to the team, you can get access from here

Tata Power Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Power Technical Retail Associate Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. What is multimeter
  • Ans. 

    A multimeter is an electronic device used to measure voltage, current, and resistance in electrical circuits.

    • It can measure AC and DC voltage

    • It can measure AC and DC current

    • It can measure resistance

    • It can also measure other electrical parameters such as capacitance and frequency

    • It typically has a digital display for easy reading

    • Examples of multimeter brands include Fluke, Klein Tools, and Extech

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jul 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 400 kv hardware detected
  • Ans. 

    400 kv hardware detected - need more context to provide answer

    • What type of hardware is being referred to?

    • What is the context of the detection?

    • What are the potential implications of the detection?

    • What steps need to be taken next?

  • Answered by AI
  • Q2. All 400 kv 220 kv line Hardware knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - All transactions lines hardware detected a tower body ect knowledge
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Solar power plant project and operations maintenance work tecnical questions rounds
  • Q2. Electrical questions
  • Q3. Taye of a transfarmar and inverter pv arya mms work and testing
  • Ans. 

    The question is asking about the work and testing of a transformer, inverter, PV array, and MMS in an electrical engineering context.

    • Transfomer: Explain the function of a transformer in electrical systems, mention testing methods like turns ratio test and insulation resistance test.

    • Inverter: Describe how an inverter converts DC power to AC power, discuss testing procedures such as efficiency testing and harmonic distor...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Tecnical questions rounds in electrical engineer and pese to pese
  • Q2. Interview in mobile call and video call

Interview Preparation Tips

Interview preparation tips for other job seekers - My total experience in 6year for solar power plant project and operations maintenance work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Tell me something about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and honest

I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. All fields related questions and answers
  • Q2. Termination and instalation related
  • Q3. Desion view drawing,masurment
  • Q4. Testing related itd, HT panel, ICOG, CT, PT
  • Q5. Haindling of field work

Interview Preparation Tips

Interview preparation tips for other job seekers - Good working experience in Adani green energy Pvt Ltd good facilities provided

Interview Questionnaire 

1 Question

  • Q1. Power system

I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Electrical question panel breaker HT breaker models HD panel LT breaker LT model circuit diagram motor relay contractor wiring hoist faster activator
  • Q2. Electrical se sambandhit any question

Interview Preparation Tips

Interview preparation tips for other job seekers - Mujhe Jo kam mile mere mehnat ka Paisa chahie mujhe, aur mere kam ka hi Paisa mujhe chahie jitna mujhe knowledge hai, usi hisab se mujhe Paisa chahie jitna hota hai Paisa mere liye utna mere account tak aana chahie

Interview Questionnaire 

1 Question

  • Q1. Working of transformer
  • Ans. 

    A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction

    • They have two coils, primary and secondary, wound around a common magnetic core

    • When an alternating current flows through the primary coil, it creates a magnetic field which induces a voltage in the secondary coil

    • The voltage in...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical question general knowlledge math
Round 3 - Aptitude Test 

Computer technical science mcq question

I applied via Naukri.com and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. TRANSMISSION AND DISTRIBUTION OF ELECTRICITY (HT AND LT)
  • Q2. POWER SYSTEM
  • Q3. TRANSMISSION LINE
  • Q4. LT LINE

Interview Preparation Tips

Interview preparation tips for other job seekers - T

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 218 Interviews
Adani Group Interview Questions
3.9
 • 187 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
Torrent Power Interview Questions
3.7
 • 126 Interviews
Eaton Interview Questions
3.9
 • 119 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
Vestas Interview Questions
4.3
 • 83 Interviews
GE Vernova Interview Questions
4.2
 • 83 Interviews
View all
Lead Engineer
745 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Team Lead
222 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
182 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
179 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Graduate Engineer Trainee (Get)
130 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Tata Power with

Adani Power

3.9
Compare

NTPC

4.2
Compare

Reliance Power

4.1
Compare

JSW Energy

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview