Filter interviews by
To calculate battery backup hours, divide the battery capacity by the load power consumption.
Determine the battery capacity in ampere-hours (Ah)
Determine the load power consumption in watts (W)
Divide the battery capacity by the load power consumption to get backup hours
Example: Battery capacity = 100Ah, Load power consumption = 50W, Backup hours = 100Ah / 50W = 2 hours
Current is the flow of electric charge through a conductor.
Current is measured in amperes (A)
It is caused by the movement of electrons or ions
Current can be direct (DC) or alternating (AC)
Ohm's law relates current, voltage, and resistance
Examples of current include the flow of electricity in a circuit or the movement of ions in a battery
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to increase or decrease the voltage in electrical power transmission and distribution systems.
There are two main types of transformers: step-up transformers, which increase voltage, and step-down transformers, which decrease voltage.
Other types of transformers inclu...
Types of transformers include power transformers, distribution transformers, autotransformers, isolation transformers, and instrument transformers.
Power transformers are used in high voltage transmission systems to step up or step down voltage levels.
Distribution transformers are used to supply power to residential and commercial areas.
Autotransformers have a single winding and are used for voltage regulation.
Isolation...
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I appeared for an interview before May 2016.
I am a recent graduate with a degree in Marketing and a passion for digital media. I have experience in social media management and content creation.
Recent graduate with a degree in Marketing
Passionate about digital media
Experience in social media management and content creation
I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2022. There were 2 interview rounds.
The main difference between .NET and .NET Core is that .NET Core is a cross-platform, open-source framework while .NET is a Windows-only framework.
NET Core is cross-platform, meaning it can run on Windows, macOS, and Linux, while .NET is limited to Windows.
.NET Core is open-source, allowing for community contributions and faster updates, while .NET is primarily developed by Microsoft.
.NET Core is modular, allowing deve...
Functions return a single value, while stored procedures can perform multiple operations and return multiple values.
Functions return a single value, while stored procedures can return multiple values.
Functions are called in SQL statements, while stored procedures are called using the EXECUTE command.
Functions cannot modify the database state, while stored procedures can.
Functions are precompiled and stored in the datab...
I applied via Shine and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
based on 2 interviews
Interview experience
based on 27 reviews
Rating in categories
Electrical Technician
11
salaries
| ₹1.6 L/yr - ₹2.9 L/yr |
HR Executive
6
salaries
| ₹2 L/yr - ₹5 L/yr |
Executive Accountant
6
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Production Supervisor
5
salaries
| ₹2 L/yr - ₹2.5 L/yr |
ITI Electrician
4
salaries
| ₹2 L/yr - ₹4 L/yr |
Adani Electricity
Tata Power
Reliance Infrastructure
Bses Rajdhani Power