Filter interviews by
I applied via Naukri.com and was interviewed before Feb 2023. There were 2 interview rounds.
To avoid line stoppage, ensure proper maintenance, have backup equipment, train staff, monitor production closely.
Regular maintenance schedules for equipment
Keep backup equipment on hand
Train staff on troubleshooting and quick fixes
Monitor production closely for any potential issues
Top trending discussions
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 11 Oct 2020
I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
Basic aptitude from rs agrawal book is sufficient
I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.
Equipment used in steam turbine include turbine blades, nozzles, casing, rotor, bearings, and governor.
Turbine blades: convert steam energy into mechanical energy
Nozzles: control the flow of steam into the turbine
Casing: contains and directs the steam flow through the turbine
Rotor: connected to the turbine blades and rotates to generate power
Bearings: support the rotor and reduce friction
Governor: regulates the speed o
Woodward 505 is a versatile control system used in industrial applications.
The Woodward 505 is a widely used control system in industries such as power generation, oil and gas, and marine.
It offers advanced features like PID control, sequencing, and communication capabilities.
The Woodward 505 is known for its reliability and robustness in harsh operating environments.
It can be easily integrated with various types of se
The Honeywell DCS (Distributed Control System) is a modular system consisting of controllers, I/O modules, and operator stations.
Consists of controllers, I/O modules, and operator stations
Uses a network to communicate between components
Allows for centralized control and monitoring of processes
Supports various communication protocols such as Modbus, OPC, etc.
Example: Honeywell Experion PKS
PID stands for Proportional-Integral-Derivative, a control loop feedback mechanism used in engineering.
PID is a control algorithm that calculates an error value as the difference between a desired setpoint and a measured process variable.
Proportional (P) control responds to the current error value.
Integral (I) control accumulates past errors to correct the present error.
Derivative (D) control predicts future errors bas...
To assign a new channel in Honeywell DCS, you need to access the configuration software and follow the steps to add the channel.
Access the Honeywell DCS configuration software
Navigate to the channel configuration section
Add a new channel by specifying the channel number, type, and other relevant parameters
Save the changes and verify the new channel is successfully assigned
Interlocks and permissives are safety mechanisms in place to prevent unsafe operation of boiler and turbine systems.
Interlocks prevent certain actions from taking place unless specific conditions are met
Permissives allow certain actions to take place only if specific conditions are met
Example of interlock: Boiler feed pump interlock prevents the boiler from starting unless the feed pump is running
Example of permissive:...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
Achievements in previous experience
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
based on 1 interview
Interview experience
Assistant Manager
310
salaries
| ₹6 L/yr - ₹15 L/yr |
Field Officer
260
salaries
| ₹2 L/yr - ₹5 L/yr |
Senior Engineer
237
salaries
| ₹4 L/yr - ₹10.2 L/yr |
Deputy Manager
178
salaries
| ₹9.4 L/yr - ₹16.5 L/yr |
Territory Manager
172
salaries
| ₹3.6 L/yr - ₹10 L/yr |
John Deere
Thermax Limited
ABB
KONE