Filter interviews by
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
Productivity is the measure of efficiency in completing tasks and achieving goals.
Productivity is the ratio of output to input in a given period of time.
It involves maximizing output while minimizing input.
Examples include producing more goods with the same amount of resources or completing tasks in less time.
Productivity can be measured in various ways such as output per hour, revenue per employee, etc.
Implementing a 5S system in the production area resulted in increased productivity by reducing waste and improving organization.
Implemented a 5S system to organize workspaces and standardize processes
Reduced waste by eliminating unnecessary items and optimizing workflow
Improved efficiency by making tools and materials easily accessible
Enhanced safety by keeping work areas clean and organized
I handle manpower issues by addressing them promptly, providing support and guidance to employees, and implementing effective communication strategies.
Regularly communicate with employees to address any concerns or issues
Provide training and development opportunities to improve skills and performance
Implement performance management systems to track and address any issues
Offer support and guidance to employees facing pe...
Yes, implemented a project to optimize production costs by streamlining supply chain processes.
Implemented lean manufacturing principles to reduce waste and improve efficiency
Negotiated better pricing with suppliers to lower material costs
Introduced automation in certain production processes to reduce labor costs
Conducted regular cost analysis to identify areas for further cost reduction
Trained staff on cost-saving mea
Top trending discussions
I applied via Job Fair and was interviewed before Mar 2021. There were 4 interview rounds.
Topic for discussion
My strengths include problem-solving, attention to detail, and strong technical skills. My weaknesses include being overly critical of my own work and sometimes struggling with delegation.
Strength: Problem-solving - I enjoy analyzing complex problems and finding efficient solutions.
Strength: Attention to detail - I have a meticulous approach to my work, ensuring accuracy and quality.
Strength: Strong technical skills - ...
I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
I am a production engineer with experience in optimizing manufacturing processes and ensuring efficient production.
Experienced production engineer
Skilled in optimizing manufacturing processes
Ensuring efficient production
Strong knowledge of production equipment and technologies
Proficient in analyzing data and implementing improvements
Collaborative team player
I was a Senior Production Engineer in my previous company.
I held the position of Senior Production Engineer.
I was responsible for overseeing production processes and ensuring efficiency.
I worked closely with the production team to identify and resolve any issues.
I implemented improvements to optimize production output and reduce costs.
I collaborated with other departments to coordinate production schedules and meet dea...
As a Production Engineer, my role is to oversee the manufacturing process, optimize production efficiency, and ensure quality control.
Overseeing the manufacturing process
Optimizing production efficiency
Ensuring quality control
Identifying and resolving production issues
Implementing process improvements
Collaborating with cross-functional teams
Monitoring production metrics and analyzing data
Creating and maintaining produc
DFT in painting stands for Dry Film Thickness.
DFT is the thickness of the paint film after it has dried.
It is measured using a coating thickness gauge.
The DFT is important for ensuring proper protection and appearance of the painted surface.
For example, a coating may require a minimum DFT of 2 mils to provide adequate corrosion protection.
DFT can also affect the drying time and curing of the paint.
Dry film thickness refers to the thickness of a coating after it has dried and cured.
It is measured using a coating thickness gauge.
It is important to ensure that the dry film thickness meets the specifications for the coating.
The dry film thickness can affect the performance and durability of the coating.
Examples of coatings that require specific dry film thickness include paint, powder coating, and plating.
Dry film t...
Excess DFT can lead to increased cost and longer production time.
Excess DFT can lead to increased material usage and waste.
It can also lead to longer production time and increased cost.
The excess DFT may also affect the performance and durability of the product.
It is important to ensure that the DFT is within the specified range to avoid these issues.
I applied via Job Fair and was interviewed before Mar 2021. There were 2 interview rounds.
I am graduation in Mechanical Engineering and also done my diploma mechanical automobile in ghaziabad
I applied via Job Fair and was interviewed before Mar 2021. There were 2 interview rounds.
I am graduation in Mechanical Engineering and also done my diploma mechanical automobile in ghaziabad
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
Line balance refers to the equal distribution of work among different stations in a production line.
Line balance ensures that each station in a production line has a similar workload.
It helps in optimizing the efficiency and productivity of the production process.
Line balancing techniques involve analyzing the tasks, cycle times, and capacities of each station to achieve optimal balance.
An example of line balance is wh...
Lead time is the time it takes to complete a process from start to finish.
Lead time includes all the steps involved in a process, from planning to delivery.
It is an important metric for businesses to measure and improve efficiency.
Lead time can vary depending on the complexity of the process and the resources available.
For example, the lead time for manufacturing a car can be several months, while the lead time for del
Torque is decided based on the required force and the distance from the axis of rotation.
Determine the required force for the task
Calculate the distance from the axis of rotation
Use the formula T = F x d to calculate torque
Consider any external factors that may affect torque requirements
Choose a motor or engine with sufficient torque output
Working with unions requires clear communication, respect, and a willingness to negotiate.
Establish open lines of communication with union representatives
Respect the collective bargaining agreement and union rules
Negotiate in good faith to find mutually beneficial solutions
Be prepared to compromise and find creative solutions
Stay informed about labor laws and regulations
Address any grievances or disputes promptly and f
Improving shopfloor requires optimizing processes, training employees, and utilizing technology.
Analyze current processes and identify areas for improvement
Invest in employee training and development
Implement technology such as automation and data analytics
Regularly review and adjust processes to ensure efficiency
Encourage employee feedback and suggestions
Maintain a clean and organized workspace
5S is a workplace organization method that uses a set of principles to create and maintain an organized, clean, and efficient work environment.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical manner
Shine - clean the work area and equipment
Standardize - establish procedures for maintaining the first three S's
Sustain - ensure that the first four S's are followed con...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Engineer
166
salaries
| ₹1.5 L/yr - ₹6 L/yr |
Junior Engineer
88
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
Engineer
77
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Production Engineer
71
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Assistant Manager
58
salaries
| ₹5 L/yr - ₹8.6 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda