Upload Button Icon Add office photos

Filter interviews by

Suntech Infra Solutions Senior Quantity Surveyor Interview Questions and Answers

Updated 18 Oct 2023

Suntech Infra Solutions Senior Quantity Surveyor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What is the name
  • Ans. 

    The name of the Senior Quantity Surveyor is not provided in the question.

    • The name of the Senior Quantity Surveyor was not mentioned in the question.

    • It is important to focus on the qualifications and experience of the candidate instead of their name.

  • Answered by AI
  • Q2. What is the village
  • Q3. What is the education
  • Ans. 

    A degree in Quantity Surveying, Construction Management, or a related field is typically required for a Senior Quantity Surveyor role.

    • Bachelor's degree in Quantity Surveying, Construction Management, or a related field is essential

    • Professional certifications such as RICS or CIOB may be preferred

    • Advanced degrees or specialized training can be beneficial for career advancement

  • Answered by AI
  • Q4. What is the state
  • Ans. 

    The state refers to the condition or status of something at a particular point in time.

    • State can refer to the physical condition of a building or structure.

    • State can also refer to the legal status of a project or contract.

    • State can also refer to the progress or completion level of a task or project.

  • Answered by AI

Interview questions from similar companies

I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

General mathematical question like work, force, percentage etc.

Round 3 - Technical 

(4 Questions)

  • Q1. What type of boq you worked earlier ?
  • Q2. What is Secured advance in client billing ?
  • Ans. 

    Secured advance in client billing is a payment made by the client to the contractor before the work is completed.

    • It is a form of pre-payment made by the client to the contractor

    • It is usually made to help the contractor cover the cost of materials and labor before the work is completed

    • The amount of the secured advance is usually a percentage of the total contract value

    • The contractor must provide security for the advance...

  • Answered by AI
  • Q3. Shear force max at which point ?
  • Ans. 

    Shear force max depends on the material and cross-sectional shape of the beam.

    • Shear force max is the maximum force that a beam can withstand before it fails in shear.

    • It depends on the material properties of the beam, such as its yield strength and modulus of elasticity.

    • It also depends on the cross-sectional shape of the beam, such as whether it is rectangular, circular, or I-shaped.

    • Calculating shear force max requires ...

  • Answered by AI
  • Q4. Wastage percentage of diff types of work
  • Ans. 

    The wastage percentage varies depending on the type of work.

    • Wastage percentage for construction work can range from 5% to 20% depending on the type of material used.

    • For electrical work, the wastage percentage can be around 2% to 5% due to damaged or defective components.

    • In plumbing work, the wastage percentage can be around 10% to 15% due to incorrect measurements or damaged pipes.

    • For painting work, the wastage percent...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very polite and humble , he guided if any wrong answer you will give
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Tell me abt yourself
  • Q2. What is rolling margin
  • Ans. 

    Rolling margin is the difference between the actual cost and the estimated cost of a project, calculated at various stages of the project.

    • Rolling margin helps in tracking the financial performance of a project over time.

    • It is calculated by subtracting the estimated cost from the actual cost at different intervals.

    • For example, if the estimated cost of a project is $100,000 and the actual cost at the halfway point is $60

  • Answered by AI
  • Q3. What is productive of a bar bender
  • Ans. 

    A bar bender is productive when they efficiently bend reinforcing bars according to specifications.

    • Ability to accurately read and interpret construction drawings

    • Skill in using bending machines and tools

    • Knowledge of different types of reinforcement bars and bending techniques

    • Attention to detail to ensure bars are bent to the correct angles and dimensions

    • Efficiency in completing tasks to meet project deadlines

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What you want change d company
  • Q2. Salary negotiation

I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Related about to quantity and IS codes.
  • Q2. According to IS code and as per site execution knowledge I answered.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't take tension at the time of interview. And if you don't know that you clearly describe that what youu know and what you don't.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Dec 2023.

Round 1 - Technical 

(5 Questions)

  • Q1. What is the standard deduction as per IS 1200?
  • Ans. 

    The standard deduction as per IS 1200 is a fixed amount that can be deducted from the measured quantities of certain items in a construction project.

    • The standard deduction is typically used for items like scaffolding, formwork, and centering in construction projects.

    • It is a fixed percentage of the measured quantity, usually ranging from 2% to 5% depending on the item and project.

    • The purpose of the standard deduction is...

  • Answered by AI
  • Q2. Steel reconciliation
  • Q3. Material properties
  • Ans. 

    Material properties refer to the characteristics and behavior of materials used in construction projects.

    • Material properties include density, strength, durability, thermal conductivity, and elasticity.

    • Understanding material properties is crucial for selecting the right materials for a project.

    • Examples of material properties affecting construction include water absorption in concrete and thermal expansion in metals.

  • Answered by AI
  • Q4. Price escalation
  • Q5. Rate Analysis, Budgeting, Client billing
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. IS code for BBS
  • Ans. 

    IS code for BBS is IS 1786:2008

    • IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement

    • BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction

    • Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects

  • Answered by AI
  • Q2. Previous project scope and type of project
  • Q3. Tell about previous project scope and rate type of project etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Learnt about IS code for RCC,Prestress concrete and steel

I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about your roles and responsibilities as Quantity Surveyor

Interview Preparation Tips

Interview preparation tips for other job seekers - everything detailed will be asked on what is written on resume

I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About myself , my previous employer
  • Q2. My family background
Round 3 - Technical 

(2 Questions)

  • Q1. About my previous company job responsibilities
  • Q2. About my working knowledge

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Quantity Surveyor interview:
  • Technical Skills
Interview preparation tips for other job seekers - Good experience about interview with HR & technical round

Interview Questionnaire 

9 Questions

  • Q1. What is rolling margin
  • Ans. 

    Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.

    • Rolling margin is used to measure the profitability of a business or project.

    • It helps in assessing the efficiency of operations and identifying areas for cost reduction.

    • The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.

    • For e...

  • Answered by AI
  • Q2. What will you do if the site qty differ from Drawing qty
  • Ans. 

    If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.

    • I will review the drawings and specifications to ensure accuracy.

    • I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.

    • I will conduct a site visit to physically verify the quantities and compare them with the drawings.

    • If there are significant differences, I ...

  • Answered by AI
  • Q3. Tell me about ur self
  • Q4. What is reconciliation of steel
  • Ans. 

    Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.

    • Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.

    • It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...

  • Answered by AI
  • Q5. What is the procedure for BBS
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.

    • BBS is prepared based on the structural drawings and specifications.

    • It includes the diameter, length, shape, and number of reinforcement bars required for the element.

    • BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.

    • It is an essential document for t...

  • Answered by AI
  • Q6. How you do the rate analysis
  • Ans. 

    Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.

    • Rate analysis involves breaking down the cost of each item in a construction project.

    • The cost of materials, labor, and equipment is analyzed to determine the overall cost.

    • Quantities of each item are measured and multiplied by their respective rates to calculate the cost.

    • Rate analysis helps in estimating ...

  • Answered by AI
  • Q7. What is margin for OH & Profits in Rate analysis
  • Ans. 

    Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.

    • Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.

    • It is usually expressed as a percentage of the direct cost.

    • The margin for OH & Profits varies depending on the nature of the project and market conditions.

    • For example, if the direct cost of a proje...

  • Answered by AI
  • Q8. Wastage % for Reinforcement Steel
  • Ans. 

    The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.

    • Wastage percentage for reinforcement steel is typically estimated between 2-5%.

    • Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.

    • Proper planning, accurate cutting, and careful handling can help minimize wastage.

    • Examples of wastage include incorrect cu...

  • Answered by AI
  • Q9. Code for Structural steel and reinforced steel
  • Ans. 

    The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).

    • Structural steel is commonly used in the construction of buildings, bridges, and other structures.

    • The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.

    • Reinforced steel, also known as reba...

  • Answered by AI
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. After one round from Walk in Interview didn't call for 2nd round although they b committed for the same
  • Q2. Technical questions in viva plus written test
  • Q3. Theoretical test
Round 2 - One-on-one 

(2 Questions)

  • Q1. Never called for second round
  • Q2. Yes didn't call even after selection from 1st round

Interview Preparation Tips

Interview preparation tips for other job seekers - don't expect from walk in interview

Suntech Infra Solutions Interview FAQs

How many rounds are there in Suntech Infra Solutions Senior Quantity Surveyor interview?
Suntech Infra Solutions interview process usually has 2 rounds. The most common rounds in the Suntech Infra Solutions interview process are Resume Shortlist and HR.
What are the top questions asked in Suntech Infra Solutions Senior Quantity Surveyor interview?

Some of the top questions asked at the Suntech Infra Solutions Senior Quantity Surveyor interview -

  1. What is the educat...read more
  2. What is the n...read more
  3. What is the st...read more

Tell us how to improve this page.

Suntech Infra Solutions Senior Quantity Surveyor Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 715 Interviews
Tata Projects Interview Questions
4.2
 • 413 Interviews
KEC International Interview Questions
4.1
 • 289 Interviews
Tata Technologies Interview Questions
3.6
 • 252 Interviews
TCE Interview Questions
3.8
 • 244 Interviews
View all

Suntech Infra Solutions Senior Quantity Surveyor Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
7 salaries
unlock blur

₹1.8 L/yr - ₹4.7 L/yr

Civil Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹6 L/yr

Senior Accounts and Taxation Manager
5 salaries
unlock blur

₹6.6 L/yr - ₹13 L/yr

Safety Supervisor
5 salaries
unlock blur

₹2.4 L/yr - ₹2.8 L/yr

QA QC Engineer
5 salaries
unlock blur

₹4 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Suntech Infra Solutions with

Larsen & Toubro Limited

4.0
Compare

Tata Technologies

3.6
Compare

Tata Projects

4.2
Compare

L&T Construction

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview