i
Sterling & Wilson
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Feb 2024. There was 1 interview round.
CAD is 2D design software while BIM is 3D modeling software with added information for building components.
CAD (Computer-Aided Design) is primarily used for 2D drafting and design.
BIM (Building Information Modeling) is used for 3D modeling with added information about building components such as materials, dimensions, and costs.
CAD focuses on individual drawings or components, while BIM allows for a more holistic view ...
Prepare an rvt family by creating a new family template, setting up parameters, adding necessary components, and testing for functionality.
Create a new family template in Revit
Set up parameters for the family
Add necessary components such as geometry, dimensions, and materials
Test the family for functionality within a project
Supporting BIM files on the construction site involves ensuring access, coordination, and utilization of the digital models for efficient project management.
Provide training to on-site staff on how to access and use BIM files
Ensure all stakeholders have access to the most updated BIM files
Coordinate with subcontractors to integrate their models into the overall BIM model
Use BIM for clash detection and coordination meet...
Top trending discussions
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
Foundation work involves sinking wells. Challenges include tilt and shift of well. Rectification methods include bottom plugging and cassion methodology.
Foundation work involves sinking wells
Challenges faced include tilt and shift of well
Rectification methods include bottom plugging and cassion methodology
Bottom plugging involves filling the bottom of the well with concrete or other materials to stabilize it
Cassion met...
posted on 20 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There were 2 interview rounds.
Technical interview with Project manager and others members.
posted on 24 Apr 2024
Water treatment process involves several steps to remove impurities and make water safe for consumption.
Coagulation and flocculation to remove particles
Sedimentation to settle out solids
Filtration to remove remaining particles
Disinfection to kill bacteria and viruses
pH adjustment to control acidity or alkalinity
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
posted on 22 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
Group interview at video call
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
239
salaries
| ₹3.2 L/yr - ₹9.1 L/yr |
Project Engineer
198
salaries
| ₹2.4 L/yr - ₹8.5 L/yr |
Electrical Engineer
187
salaries
| ₹1.8 L/yr - ₹8.4 L/yr |
Assistant Manager
185
salaries
| ₹4.2 L/yr - ₹15.5 L/yr |
Deputy Manager
146
salaries
| ₹5.7 L/yr - ₹22 L/yr |
Simplex Infrastructures
Aarvee Associates
Nasser S. Al Hajri Corporation