SS Infrastructure Site Engineer Interview Questions and Answers

Updated 10 Jan 2024

SS Infrastructure Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Jan 2024

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. About familly background
  • Q2. SSIDC whole time director briefed about company gave reference of DRDO and other Govt agencies projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - Discuss about salary date and if they are unable to pay salaries on time ( keep some margin) ask old employees if there and leave.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(4 Questions)

  • Q1. Power plant operation And maintenance
  • Q2. Thermal power plant operation
  • Ans. 

    Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.

    • Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.

    • The steam is used to rotate a turbine, which drives a generator to produce electricity.

    • The process involves several components such as boilers, turbines, condensers, and cooling towers.

    • Thermal power plants require a constan...

  • Answered by AI
  • Q3. Personal and operation
  • Q4. Plant operation

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of d...
  • Ans. 

    Sample interview questions for Site Engineer position

    • BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications

    • Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase

    • Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement

    • Full form of TMT ...

  • Answered by AI
  • Q2. 1.introduction your self 2.Why you choose civil engineering? 3.whats ur salary expections? 4.Why u leave previous company?

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Civil Engineering
  • Concrete technology
  • Bmc
  • Quantity Surveyor Activities
Interview preparation tips for other job seekers - Prepare properly and crack interview because not hard question. Firstly 50 marks question paper provide and give you 30 minutes and after getting more than 25 then personal interview.

I applied via Campus Placement and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Whats is a gsb tollrance
  • Ans. 

    GSB tolerance refers to the acceptable level of deviation from the specified requirements in the GSB (Granular Sub Base) layer of a construction project.

    • GSB tolerance determines the allowable variation in thickness, compaction, and gradation of the GSB layer.

    • It is important to adhere to the specified GSB tolerance to ensure the stability and durability of the road or pavement.

    • For example, if the GSB tolerance for compa...

  • Answered by AI
  • Q2. Please explained the bumping removing process
  • Ans. 

    Bumping removing process is a method used to eliminate or reduce the occurrence of bumps or uneven surfaces on a construction site.

    • Bumping removing process involves identifying and addressing the causes of bumps or uneven surfaces on the site.

    • Common causes of bumps include improper compaction of soil, uneven grading, or the presence of debris.

    • The process may include activities such as regrading, compacting the soil, re...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice job & company hr barbrik project limited raipur my first attempted sending resume accepted here but I love hr recall back process
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(4 Questions)

  • Q1. Power plant operation And maintenance
  • Q2. Thermal power plant operation
  • Ans. 

    Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.

    • Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.

    • The steam is used to rotate a turbine, which drives a generator to produce electricity.

    • The process involves several components such as boilers, turbines, condensers, and cooling towers.

    • Thermal power plants require a constan...

  • Answered by AI
  • Q3. Personal and operation
  • Q4. Plant operation
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How many year experience
  • Q2. What about drainage contraction knowledge
  • Ans. 

    Drainage contraction knowledge is essential for a Site Engineer to ensure proper water flow and prevent flooding.

    • Understanding of drainage systems and their components

    • Knowledge of local regulations and standards for drainage design

    • Ability to calculate drainage capacity and slope requirements

    • Experience in designing and implementing drainage solutions

    • Familiarity with different types of drainage materials and their proper

  • Answered by AI

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Excavation
  • Concrete
  • Shuttering
  • Steel
Interview preparation tips for other job seekers - Make it last option.

I applied via Walk-in and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Civil basic question

Interview Preparation Tips

Interview preparation tips for other job seekers - 1 St written exam 100 marks
2 nd Ms office
3 rd Excell

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of d...
  • Ans. 

    Sample interview questions for Site Engineer position

    • BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications

    • Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase

    • Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement

    • Full form of TMT ...

  • Answered by AI
  • Q2. 1.introduction your self 2.Why you choose civil engineering? 3.whats ur salary expections? 4.Why u leave previous company?

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Civil Engineering
  • Concrete technology
  • Bmc
  • Quantity Surveyor Activities
Interview preparation tips for other job seekers - Prepare properly and crack interview because not hard question. Firstly 50 marks question paper provide and give you 30 minutes and after getting more than 25 then personal interview.
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Exam for Qs related questions
  • Q2. Excel related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Atten the walk in, write the test, thn face the face to face
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How many year experience
  • Q2. What about drainage contraction knowledge
  • Ans. 

    Drainage contraction knowledge is essential for a Site Engineer to ensure proper water flow and prevent flooding.

    • Understanding of drainage systems and their components

    • Knowledge of local regulations and standards for drainage design

    • Ability to calculate drainage capacity and slope requirements

    • Experience in designing and implementing drainage solutions

    • Familiarity with different types of drainage materials and their proper

  • Answered by AI

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Excavation
  • Concrete
  • Shuttering
  • Steel
Interview preparation tips for other job seekers - Make it last option.

SS Infrastructure Interview FAQs

How many rounds are there in SS Infrastructure Site Engineer interview?
SS Infrastructure interview process usually has 1 rounds. The most common rounds in the SS Infrastructure interview process are HR.
What are the top questions asked in SS Infrastructure Site Engineer interview?

Some of the top questions asked at the SS Infrastructure Site Engineer interview -

  1. SSIDC whole time director briefed about company gave reference of DRDO and oth...read more
  2. About familly backgro...read more

Tell us how to improve this page.

SS Infrastructure Site Engineer Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more
SS Infrastructure Site Engineer Salary
based on 6 salaries
₹2.1 L/yr - ₹3.6 L/yr
26% less than the average Site Engineer Salary in India
View more details

SS Infrastructure Site Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

2.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Site Engineer
6 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Project Manager
5 salaries
unlock blur

₹3 L/yr - ₹3.6 L/yr

Senior Systems Engineer
4 salaries
unlock blur

₹9 L/yr - ₹11 L/yr

Sales Manager
4 salaries
unlock blur

₹13.5 L/yr - ₹17.7 L/yr

Senior Architect
4 salaries
unlock blur

₹4.5 L/yr - ₹13.8 L/yr

Explore more salaries
Compare SS Infrastructure with

GAMMON INDIA

3.8
Compare

McNally Bharat Engineering

4.1
Compare

Military Engineer Services

4.4
Compare

Chetak Enterprises

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview