Upload Button Icon Add office photos

Filter interviews by

Srm Engineering Construction Interview Questions and Answers

Updated 19 May 2022

Srm Engineering Construction Interview Experiences

1 interview found

I applied via Referral and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What you know about bank
  • Ans. 

    Banks are financial institutions that provide various services such as deposits, loans, and investments.

    • Banks accept deposits from customers and pay interest on them

    • They provide loans to individuals and businesses

    • Banks offer various types of accounts such as savings, checking, and money market accounts

    • They also provide investment services such as mutual funds and retirement accounts

    • Banks are regulated by government age

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice experience, great place to work

Operations Executive Interview Questions asked at other Companies

Q1. What is the electric current? How is works ?
View answer (30)

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What is data structure?
  • Ans. 

    Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.

    • Data structures are used to manage large amounts of data efficiently.

    • They provide a way to organize data in a way that makes it easy to access and manipulate.

    • Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.

  • Answered by AI
Round 3 - Coding Test 

Explain logic of stack

Interview Preparation Tips

Interview preparation tips for other job seekers - Its good place to start your career

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. What are the seven quality control tools, and can you provide explanations for each?
  • Ans. 

    The seven quality control tools are essential for process improvement and problem-solving in engineering.

    • Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.

    • Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.

    • Cause-and-effect diagram (Fishbone diagram): Visuali...

  • Answered by AI
  • Q2. 5S and visual management
  • Q3. What are the seven steps of autonomous maintenance?
  • Ans. 

    Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.

    • Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.

    • Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.

    • Step 3: General Inspection - Operators visually inspect the ...

  • Answered by AI
  • Q4. What are the calculations involved in Overall Equipment Effectiveness (OEE)?
  • Ans. 

    OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.

    • Calculate Availability by dividing Operating Time by Planned Production Time.

    • Calculate Performance by dividing Actual Production by Maximum Possible Production.

    • Calculate Quality by dividing Good Units Produced by Total Units Started.

  • Answered by AI
  • Q5. Why is it mandatory for an organization to implement lean practices?
  • Ans. 

    Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.

    • Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.

    • By implementing lean practices, organizations can improve quality control and reduce defects in products or services.

    • Lean practices promote continuous improvement and empower ...

  • Answered by AI
  • Q6. How can downstream team members be motivated?
  • Ans. 

    Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.

    • Provide recognition for their hard work and achievements

    • Communicate clearly about goals, expectations, and feedback

    • Offer opportunities for growth and development, such as training or mentorship programs

    • Create a positive work environment through team-building activities a

  • Answered by AI
  • Q7. What is Pareto analysis and how is it applied in decision-making processes?
  • Ans. 

    Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.

    • Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.

    • It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.

    • By focusing on addressing the most critical fact...

  • Answered by AI
  • Q8. What is a Gemba walk, and how is it performed?
  • Ans. 

    A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.

    • Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.

    • Managers should focus on understanding the work being done and the challenges faced by employees.

    • Gemba walks help in building relationships with employees and fostering a culture of c...

  • Answered by AI
  • Q9. What are the steps involved in performing safety risk assessments?
  • Ans. 

    Steps involved in performing safety risk assessments

    • Identify hazards and potential risks

    • Assess the likelihood and severity of each risk

    • Implement control measures to mitigate risks

    • Monitor and review the effectiveness of control measures

    • Document findings and recommendations

    • Communicate risks to relevant stakeholders

  • Answered by AI
  • Q10. Explain about TPM
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.

    • It involves autonomous maintenance, planned maintenance, and focused improvement activities.

    • TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced business analyst with a background in data analysis and process improvement.

    • Over 5 years of experience in analyzing business processes and identifying areas for improvement

    • Skilled in data analysis tools such as Excel, SQL, and Tableau

    • Strong communication and problem-solving skills

    • Led a project to streamline inventory management processes, resulting in a 20% reduction in costs

  • Answered by AI
  • Q2. Tell me about your roles and responsibilities

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI

I appeared for an interview before Jul 2016.

Interview Questionnaire 

1 Question

  • Q1. Tell me about yourself.
  • Ans. 

    I am a dedicated and experienced HR professional with a passion for helping organizations thrive through effective talent management.

    • Over 5 years of experience in HR roles, including recruitment, employee relations, and performance management

    • Strong communication and interpersonal skills, with a focus on building positive relationships with employees and stakeholders

    • Proven track record of implementing HR strategies that...

  • Answered by AI

Interview Preparation Tips

Round: HR Interview
Experience: They check my confidence level weather i can speak in front of them or anyone.
Tips: Eye contact and Gestures

Skills: Confidence Levels as student, Talking Ability, Working Under Pressure
College Name: SAVERA GROUP OF INSTITUTION

Interview Questionnaire 

6 Questions

  • Q1. Basic questions on concrete mixtures
  • Q2. What are the various types of admixtures?
  • Ans. 

    Admixtures are substances added to concrete to enhance its properties. They can be classified into different types.

    • Water-reducing admixtures: reduce the amount of water needed for a given concrete mix

    • Retarding admixtures: delay the setting time of concrete

    • Accelerating admixtures: speed up the setting time of concrete

    • Air-entraining admixtures: introduce tiny air bubbles to improve workability and durability

    • Superplastici...

  • Answered by AI
  • Q3. Disadvantages of mineral admixtures?
  • Ans. 

    Mineral admixtures have several disadvantages in construction.

    • Mineral admixtures can affect the workability of concrete, making it more difficult to handle and place.

    • They may increase the setting time of concrete, leading to delays in construction.

    • Some mineral admixtures, such as fly ash, can have a negative impact on the strength and durability of concrete.

    • Mineral admixtures may introduce variability in concrete prope...

  • Answered by AI
  • Q4. How is the water cement ratio affected when the admixture is added?
  • Ans. 

    The water cement ratio is affected by the addition of admixture.

    • The water cement ratio is the ratio of the weight of water to the weight of cement in a concrete mix.

    • When an admixture is added, it can change the properties of the concrete mix, including the water cement ratio.

    • Some admixtures, such as water-reducing admixtures, can decrease the water cement ratio by allowing for a lower water content while maintaining wo...

  • Answered by AI
  • Q5. Some basic question on the RCC structures
  • Q6. Where are you based at?
  • Ans. 

    I am based in [location].

    • I am currently based in [location].

    • My current location is [location].

    • I am located in [location].

  • Answered by AI

Interview Preparation Tips

Round: Group Discussion
Experience: There were 8 people in this round. And, it was followed by a small debate.
Duration: 2min each minutes

Round: HR Interview
Experience: It was a bit simple.

General Tips: 1. SWITCH OFF YOUR MOBILE PHONE DURING THE INTERVIEW.
2. Be prepared for the interview, revise the basic courses and know a little about the company.
Skills: ,
College Name: IIT- Kanpur

QC GET Interview Questions & Answers

Patil Group user image rangaswamy allam

posted on 8 Jul 2017

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Test
Duration: 30 minutes
Total Questions: 30

College Name: JNTU College of engineering Manthani

Srm Engineering Construction Interview FAQs

How many rounds are there in Srm Engineering Construction interview?
Srm Engineering Construction interview process usually has 2 rounds. The most common rounds in the Srm Engineering Construction interview process are Resume Shortlist and One-on-one Round.

Tell us how to improve this page.

Interview Questions from Similar Companies

GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Patil Group Interview Questions
3.8
 • 26 Interviews
Six Construct Interview Questions
4.5
 • 5 Interviews
View all

Srm Engineering Construction Reviews and Ratings

based on 7 reviews

4.9/5

Rating in categories

4.9

Skill development

3.7

Work-life balance

2.5

Salary

4.4

Job security

3.7

Company culture

3.1

Promotions

3.1

Work satisfaction

Explore 7 Reviews and Ratings
Manager Civil
4 salaries
unlock blur

₹9 L/yr - ₹9 L/yr

Junior Safety Officer
4 salaries
unlock blur

₹0.2 L/yr - ₹0.2 L/yr

Civil Site Engineer
3 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Account Assistant
3 salaries
unlock blur

₹1.2 L/yr - ₹1.2 L/yr

Explore more salaries
Compare Srm Engineering Construction with

GAMMON INDIA

3.8
Compare

Patil Group

3.8
Compare

Millennium Engineers & Contractors

4.1
Compare

Karam Industries

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview