Filter interviews by
I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
It is confidential not possible to share.
7QC tools are a set of quality control tools used for process improvement and problem-solving in quality management.
7QC tools include Pareto chart, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart.
These tools help identify and analyze quality problems, prioritize issues, and make data-driven decisions for improvement.
For example, a Pareto chart can help identify the most s...
Top trending discussions
posted on 17 Dec 2024
Introduction & Personal questions
I appeared for an interview in Sep 2023.
posted on 12 Feb 2023
I applied via Approached by Company and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jul 2022. There were 2 interview rounds.
A single mechanical seal consists of one set of sealing surfaces, while a double mechanical seal consists of two sets of sealing surfaces.
Single mechanical seals are commonly used in applications with low to moderate pressure and temperature.
Double mechanical seals are used in applications with high pressure and temperature to provide an extra layer of protection.
Single mechanical seals are simpler and easier to instal...
The type of gearbox used in SSR reactors is typically a helical gearbox.
SSR reactors commonly use helical gearboxes for their efficient power transmission.
Helical gearboxes have high load-carrying capacity and smooth operation.
They are suitable for applications requiring high torque and low noise levels.
Examples of helical gearboxes used in SSR reactors include inline helical gearboxes and parallel shaft helical gearbo
I applied via Campus Placement and was interviewed before Jan 2023. There was 1 interview round.
Dealing with liquid measurement involves understanding units, using appropriate tools, and considering factors like temperature and viscosity.
Understand different units of liquid measurement, such as liters, milliliters, gallons, and fluid ounces.
Use appropriate tools like measuring cups, graduated cylinders, or pipettes to accurately measure liquids.
Consider factors like temperature and viscosity, as they can affect t...
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 3 interview rounds.
I am not currently working with a boiler.
I do not have experience with boilers.
I am willing to learn and adapt to new systems.
If there is a specific type of boiler required for the job, I am open to training and gaining experience with it.
Our plant process has a capacity of 500 units per day.
Our plant process is designed to handle up to 500 units per day.
We have optimized our production line to achieve a maximum capacity of 500 units per day.
Our current production rate is at 80% of our plant process capacity.
We are constantly looking for ways to improve our plant process to increase capacity.
CFBC boiler problems can include ash buildup, erosion, and corrosion.
Regular cleaning and maintenance can prevent ash buildup
Using high-quality refractory materials can prevent erosion
Using corrosion-resistant materials can prevent corrosion
Monitoring and controlling the temperature and pressure can prevent other issues
Consulting with experts and following manufacturer guidelines can help address any problems
I applied via Job Portal and was interviewed before Aug 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Junior Engineer
988
salaries
| ₹2.1 L/yr - ₹9.4 L/yr |
Senior Executive
417
salaries
| ₹4.5 L/yr - ₹13.5 L/yr |
Assistant Manager
195
salaries
| ₹7.1 L/yr - ₹16.1 L/yr |
Junior Officer
191
salaries
| ₹2.5 L/yr - ₹9 L/yr |
Technician
185
salaries
| ₹2.4 L/yr - ₹6.6 L/yr |
Asian Paints
Berger Paints
Pidilite Industries
Kansai Nerolac Paints