I applied via Campus Placement and was interviewed before Jan 2021. There was 1 interview round.
BMD diagram of a propped cantilever beam shows the variation of bending moment along the length of the beam.
BMD diagram is a graphical representation of bending moment variation.
Propped cantilever beam is a beam that is fixed at one end and supported by a prop at some distance from the fixed end.
The BMD diagram of a propped cantilever beam has two maximum points, one at the fixed end and the other at the prop.
The bendi...
The question is unclear and requires clarification.
The question needs to be rephrased or clarified.
It is unclear what is being asked.
More information is needed to provide an answer.
The weight of concrete per cubic metre varies depending on the mix and density.
The weight of normal concrete is around 2400 kg/m³
Lightweight concrete can weigh as little as 1600 kg/m³
Heavyweight concrete can weigh up to 3800 kg/m³
The weight of concrete can also be affected by the aggregates used
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Walk-in and was interviewed in Jul 2021. There were 3 interview rounds.
posted on 17 Jan 2022
The rpm of bucket wheel depends on its size and application.
The rpm can range from 1 to 10 depending on the size of the bucket wheel.
For example, a small bucket wheel used in mining may have an rpm of 1-2, while a larger one used in power generation may have an rpm of 8-10.
The rpm also depends on the speed of the conveyor belt and the amount of material being moved.
The rpm can be calculated using the formula: rpm = (ci...
posted on 21 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.
Drainage contraction knowledge is essential for a Site Engineer to ensure proper water flow and prevent flooding.
Understanding of drainage systems and their components
Knowledge of local regulations and standards for drainage design
Ability to calculate drainage capacity and slope requirements
Experience in designing and implementing drainage solutions
Familiarity with different types of drainage materials and their proper
I applied via Walk-in
Sample interview questions for Site Engineer position
BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications
Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase
Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement
Full form of TMT ...
based on 3 reviews
Rating in categories
Accountant
5
salaries
| ₹2.4 L/yr - ₹3.1 L/yr |
Assistant Engineer
5
salaries
| ₹3 L/yr - ₹7.1 L/yr |
CAD Draughtsman
5
salaries
| ₹3.3 L/yr - ₹4.1 L/yr |
Assistant Bridge Engineer
5
salaries
| ₹3.6 L/yr - ₹4.6 L/yr |
Assistant Surveyor
4
salaries
| ₹2.2 L/yr - ₹2.7 L/yr |
GAMMON INDIA
McNally Bharat Engineering
SPML Infra
Techno Electric & Engineering Company