Filter interviews by
Designing and estimating a conveyor system involves determining the required specifications and calculating the cost.
Identify the purpose and requirements of the conveyor system
Calculate the required length, width, and speed of the conveyor
Select appropriate materials and components based on the application
Estimate the cost of the conveyor system including installation and maintenance
Consider factors such as load capac...
Top trending discussions
It is based on the aptitude questions
Different topics will be asked to share
I applied via Company Website and was interviewed in Jul 2024. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
My goal is that I will do a good marketing job in a good company.
This company is good and I want to learn a lot from this company.
I applied via Company Website and was interviewed in Aug 2024. There were 3 interview rounds.
Logical ability and quantitative ability.
Operating systems, programming languages and other object oriented programming.
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in Jan 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
posted on 10 Dec 2024
Interview experience
Operation & Maintenance Engineer
5
salaries
| ₹2.3 L/yr - ₹2.4 L/yr |
Design Engineer
4
salaries
| ₹3.6 L/yr - ₹5 L/yr |
Engineer
4
salaries
| ₹3 L/yr - ₹3.1 L/yr |
Quality Engineer
4
salaries
| ₹1.2 L/yr - ₹4 L/yr |
Assistant Manager
3
salaries
| ₹4.8 L/yr - ₹4.8 L/yr |
Pneucon Process Technologies
Schenck Process India
Macmet Engineering
Bevcon Wayors