Handling work pressure by following a schedule to ensure timely completion of tasks.
Prioritize tasks based on deadlines and importance
Create a detailed schedule outlining daily, weekly, and monthly tasks
Delegate tasks to team members based on their skills and availability
Regularly review and adjust the schedule as needed to meet deadlines
Use tools like Gantt charts or project management software to track progress
Materials requisition is a formal request for materials needed for a project, while materials follow up is tracking the status of the requested materials.
Materials requisition should include details such as quantity, description, and required delivery date.
Materials follow up involves checking with suppliers for availability, tracking delivery status, and updating project team.
Effective communication with suppliers is ...
The senior work progress report includes updates on project milestones, challenges faced, and future plans.
The report should include a summary of completed tasks and achievements.
It should also highlight any delays or obstacles encountered during the project.
Future plans and strategies for overcoming challenges should be outlined in the report.
Recommendations for improvement and areas of focus for the next reporting pe
posted on 5 Jul 2020
I appeared for an interview before Jul 2019.
posted on 29 Aug 2024
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
posted on 10 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
Wire rope slings are commonly used in construction areas for lifting heavy loads.
Wire rope slings are made of multiple strands of wire twisted together to form a strong and flexible sling.
They are used to lift heavy objects such as steel beams, concrete blocks, and machinery.
Wire rope slings are durable and resistant to abrasion, making them suitable for rugged construction environments.
They come in various configurati...
posted on 22 Aug 2023
I applied via Job Fair and was interviewed in Jul 2023. There were 3 interview rounds.
posted on 16 Jun 2024
posted on 18 Oct 2021
I appeared for an interview before Oct 2020.
I applied via Referral and was interviewed before Jan 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Planning Engineer
9
salaries
| ₹6.6 L/yr - ₹19.4 L/yr |
Quantity Surveyor
7
salaries
| ₹17.5 L/yr - ₹22.6 L/yr |
Project Engineer
7
salaries
| ₹4.5 L/yr - ₹10.2 L/yr |
Site Engineer
7
salaries
| ₹3 L/yr - ₹12.5 L/yr |
Safety Officer
6
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures