Filter interviews by
Be the first one to contribute and help others!
I applied via Campus Placement
My goal is to contribute my engineering skills and expertise to help the company achieve its objectives and drive innovation.
To actively participate in the development of new products and technologies
To collaborate with cross-functional teams to solve complex engineering problems
To continuously improve processes and optimize efficiency
To mentor and guide junior engineers to foster a culture of learning and growth
To sta...
I am currently working on designing and implementing a new software system for a manufacturing company.
Designing and implementing a new software system
Working closely with the manufacturing team to understand their requirements
Writing code and conducting tests to ensure the system functions properly
Collaborating with other engineers to integrate the software with existing systems
Providing technical support and troubles
My expectation is to work in a challenging and innovative environment where I can utilize my engineering skills to contribute to the success of the company.
To work on cutting-edge technologies
To have opportunities for professional growth and development
To be part of a collaborative and diverse team
To have a work-life balance
To be recognized and rewarded for my contributions
Yes, I am comfortable working in night hours.
I have prior experience working night shifts and have adapted to the schedule.
I understand the importance of round-the-clock support in engineering roles.
I am flexible and can adjust my sleep patterns accordingly.
I am aware of the potential challenges of working at night and have strategies to stay alert and focused.
I am committed to meeting project deadlines and delivering ...
posted on 3 Nov 2022
Different types of cable trays include ladder, perforated, solid bottom, wire mesh, and trough.
Ladder cable trays have horizontal cross members resembling a ladder.
Perforated cable trays have small holes for ventilation and drainage.
Solid bottom cable trays have a solid base for supporting cables.
Wire mesh cable trays have a grid-like structure for easy cable installation.
Trough cable trays have a U-shaped design for c
The rule of cable laying involves proper planning, routing, securing, and labeling of cables to ensure safety and efficiency.
Plan the cable routes to avoid interference with other systems or equipment.
Secure cables properly to prevent damage or accidents.
Label cables clearly for easy identification and maintenance.
Follow local regulations and standards for cable laying practices.
Consider factors like cable length, bend...
Anticarsia gemmatalis, also known as the velvetbean caterpillar, is a common pest in agriculture.
Anticarsia gemmatalis is a species of moth in the family Erebidae.
It is a major pest of soybean crops, feeding on the leaves and causing significant damage.
Control measures for velvetbean caterpillars include biological control agents, insecticides, and crop rotation.
Monitoring for early signs of infestation can help preven
General Arrangement drawings show the overall layout of electrical systems in a building or structure.
GA drawings provide an overview of the entire electrical system layout
They include details such as equipment locations, cable routing, and connection points
These drawings are essential for understanding the overall design and installation of electrical systems
Examples of GA drawings include floor plans with electrical ...
posted on 2 Jun 2021
I applied via Approached by Company and was interviewed before Jun 2020. There were 2 interview rounds.
Power factor correction methods, load flow analysis, and different types of transformer tests are important topics in operations management.
Power factor correction methods are used to improve the power factor of electrical systems, which helps in reducing energy losses and improving efficiency.
Load flow analysis is a technique used to study the flow of power in an electrical network, helping in determining voltage leve...
posted on 27 Jun 2022
De-ashing process from ESP to silo involves several steps.
The ash is collected in hoppers located at the bottom of the ESP.
The ash is then transported to the silo using a pneumatic conveying system.
The ash is stored in the silo until it can be disposed of properly.
Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.
Proper safety measures must be taken during the de-a
The capacity of ESP hoppers varies depending on the size and model of the equipment.
ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.
The capacity can also depend on the type of material being collected in the hopper.
It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.
posted on 12 Aug 2022
I applied via Campus Placement and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jan 2022. There were 5 interview rounds.
My concrete work level is excellent and I have experience in various finishing techniques.
I have experience in pouring and leveling concrete for foundations, walls, and slabs.
I am skilled in using various finishing techniques such as troweling, stamping, and staining.
I pay close attention to detail to ensure a smooth and even finish.
I am knowledgeable in the proper curing and sealing of concrete to ensure its longevity...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure.
BBS is used in drawing work to ensure the correct amount of reinforcement is used in a structure.
It includes details such as bar diameter, length, shape, and placement.
BBS helps in estimating the amount of steel required for a project and also helps in cost estimation.
It is an important part of the construction process an...
I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.
We used an ERP system called SAP in my previous company.
Previous company used SAP as the primary system.
SAP helped in streamlining business processes and improving efficiency.
It integrated various departments like finance, HR, and supply chain.
SAP provided real-time data and analytics for informed decision-making.
Employees were trained to use SAP for their respective roles.
posted on 26 Aug 2022
I manage channel marketing by developing strategies, analyzing data, and collaborating with cross-functional teams.
Developing and executing channel marketing strategies
Analyzing data to measure effectiveness and optimize campaigns
Collaborating with cross-functional teams to ensure alignment and maximize impact
Managing budgets and resources to achieve goals
Staying up-to-date with industry trends and best practices
Exampl...
I applied via Company Website and was interviewed in Oct 2021. There were 5 interview rounds.
Seeking new challenges and growth opportunities.
Looking for a company that aligns better with my career goals.
Desire to work on more complex projects.
Seeking a better work-life balance.
Company downsizing or restructuring.
Limited opportunities for advancement or professional development.
Relocation or personal reasons.
based on 15 reviews
Rating in categories
Production Engineer
4
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Hardware Engineer
3
salaries
| ₹2 L/yr - ₹2 L/yr |
Site Engineer
3
salaries
| ₹1.5 L/yr - ₹1.8 L/yr |
Assistant Manager- Purchase
3
salaries
| ₹2.2 L/yr - ₹2.6 L/yr |
Embedded Firmware Engineer
3
salaries
| ₹3 L/yr - ₹4 L/yr |
Jakson Group
ReNew
Vestas
Wind World