I applied via Approached by Company

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Accounts proposed only
  • Q2. My personal data only
  • Q3. And my education detals
  • Q4. Job location area in India
  • Ans. 

    The job location for Accounts Officer in India can vary depending on the company and industry.

    • Job location can be in major cities like Mumbai, Delhi, Bangalore, Chennai, Kolkata, Hyderabad, etc.

    • It can also be in smaller cities or towns where the company has its operations.

    • The location can also depend on the industry, for example, a manufacturing company may have its office and factory in a different location.

    • Remote wor...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hh hsgdgdbjndjddhgdhdbdbn gjshdhbdbdbndnndnd hshhfhchfh hdhdhhdjdh

Interview questions from similar companies

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Introduction about yourself
  • Ans. I'm answering Smoothly about my self
  • Answered Anonymously
Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions Like 1- Estimation and Costing 2- Rate Analysis 3- Planning and Praposal 4- Vendor Selection and Database 6- What do you mean by Hydrocarbon
Round 3 - Assignment 

1- Material Calculation
2- Bar bending Schedule
3- Planning and Chart
4- Making Praposal

Interview Preparation Tips

Interview preparation tips for other job seekers - 1- Special thing is that you should speak in English and be Confident.
2- Learn that before you to interview about which post you choose etc.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. About blasting process
  • Q2. About painting quantity
  • Q3. Material management
  • Q4. About Working skills
  • Q5. Technical question related painting and blasting work

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Will ask all related questions.
  • Q2. Do u know Piping engineering?
  • Ans. 

    Yes, I have knowledge in Piping engineering.

    • I have a degree in Mechanical Engineering which includes coursework in Piping design and analysis.

    • I have practical experience working on piping projects in my previous roles.

    • I am familiar with industry standards and codes related to piping engineering such as ASME B31.3 and API 570.

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Expectation of salary, why job switch.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Telephonic Call 

(1 Question)

  • Q1. Offshore projects, Inch dia calculations, P&ID, Launcher receiver information, Piping fittings
Round 3 - One-on-one 

(1 Question)

  • Q1. Proposal estimation, offshore process, overall crude process

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with politely. L&T peoples are very co-operative

Simplex Infrastructures Interview FAQs

How many rounds are there in Simplex Infrastructures Accounts Officer interview?
Simplex Infrastructures interview process usually has 2 rounds. The most common rounds in the Simplex Infrastructures interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Simplex Infrastructures Accounts Officer interview?

Some of the top questions asked at the Simplex Infrastructures Accounts Officer interview -

  1. Job location area in In...read more
  2. Accounts proposed o...read more
  3. My personal data o...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 765 Interviews
Tata Projects Interview Questions
4.2
 • 458 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
AECOM Interview Questions
4.2
 • 120 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
View all
Simplex Infrastructures Accounts Officer Salary
based on 32 salaries
₹2.8 L/yr - ₹6.7 L/yr
10% less than the average Accounts Officer Salary in India
View more details

Simplex Infrastructures Accounts Officer Reviews and Ratings

based on 16 reviews

3.9/5

Rating in categories

3.3

Skill development

3.1

Work-life balance

2.4

Salary

2.8

Job security

3.7

Company culture

2.9

Promotions

3.2

Work satisfaction

Explore 16 Reviews and Ratings
Assistant Manager
212 salaries
unlock blur

₹3.5 L/yr - ₹11 L/yr

Assistant Engineer
154 salaries
unlock blur

₹1.8 L/yr - ₹5 L/yr

Assistant Engineer - Civil
153 salaries
unlock blur

₹2.6 L/yr - ₹4.5 L/yr

Project Engineer
128 salaries
unlock blur

₹2.9 L/yr - ₹7.8 L/yr

Deputy Manager
110 salaries
unlock blur

₹5.5 L/yr - ₹12 L/yr

Explore more salaries
Compare Simplex Infrastructures with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview