Filter interviews by
I applied via Campus Placement
M20 refers to the mix ratio of concrete, where M stands for mix and 20 represents the compressive strength of concrete in N/mm^2 after 28 days.
M20 is a commonly used mix ratio in construction for concrete.
It means 1 part cement, 1.5 parts sand, and 3 parts aggregate.
The compressive strength of M20 concrete is 20 N/mm^2 after 28 days of curing.
It is suitable for moderate exposure conditions.
Characteristic compressive strength is the strength of concrete at 28 days of curing.
It is the maximum compressive stress that a concrete specimen can sustain at 28 days of curing.
It is used to determine the quality of concrete and its ability to resist loads.
It is usually expressed in megapascals (MPa).
For example, a characteristic compressive strength of 30 MPa means that the concrete can withstand a maximum load of
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Cube compressive achieving percentage time periods
The question is asking about the percentage of time periods in which cube compressive strength is achieved
Cube compressive strength refers to the ability of a cube-shaped material to withstand compression
The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength
Examples of data points needed: time periods,
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
posted on 12 Sep 2023
I applied via Campus Placement and was interviewed in Mar 2023. There were 3 interview rounds.
General Aptitude on English Grammar, Maths, Blood Relation and Technical Questions
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 3 reviews
Rating in categories
Civil Site Engineer
14
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Senior Engineer
10
salaries
| ₹4.8 L/yr - ₹7 L/yr |
Site Engineer
9
salaries
| ₹1.9 L/yr - ₹3.6 L/yr |
Structural Engineer
7
salaries
| ₹1.6 L/yr - ₹4 L/yr |
Engineer Trainee
7
salaries
| ₹1.2 L/yr - ₹2.3 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem