Filter interviews by
Performance testing is a type of testing to ensure software applications perform well under expected workload.
Performance testing measures the speed, responsiveness, and stability of an application under various load conditions.
It helps identify bottlenecks, assess scalability, and determine if the system meets performance requirements.
Types of performance testing include load testing, stress testing, and scalability t...
Stress testing is a type of performance testing that evaluates the system's stability and reliability under extreme conditions.
Simulates high traffic or heavy load on the system
Helps identify the breaking point of the system
Measures how the system recovers from stress
Examples: sending a large number of simultaneous requests to a web server, running multiple applications on a device to test its performance
I applied via Approached by Company and was interviewed in Jan 2024. There was 1 interview round.
I applied via Campus Placement
M20 refers to the mix ratio of concrete, where M stands for mix and 20 represents the compressive strength of concrete in N/mm^2 after 28 days.
M20 is a commonly used mix ratio in construction for concrete.
It means 1 part cement, 1.5 parts sand, and 3 parts aggregate.
The compressive strength of M20 concrete is 20 N/mm^2 after 28 days of curing.
It is suitable for moderate exposure conditions.
Characteristic compressive strength is the strength of concrete at 28 days of curing.
It is the maximum compressive stress that a concrete specimen can sustain at 28 days of curing.
It is used to determine the quality of concrete and its ability to resist loads.
It is usually expressed in megapascals (MPa).
For example, a characteristic compressive strength of 30 MPa means that the concrete can withstand a maximum load of
Shreeji Infrastructure interview questions for popular designations
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.
Price escalation refers to the increase in the cost of goods or services over time.
It is often caused by factors such as inflation, changes in supply and demand, and fluctuations in currency exchange rates.
Price escalation can have a significant impact on project budgets and must be carefully monitored by billing engineers.
For example, if a construction project is expected to take several years to complete, the cost of...
I appeared for an interview in Sep 2016.
I appeared for an interview before Aug 2016.
based on 4 interviews
Interview experience
based on 106 reviews
Rating in categories
Civil Site Engineer
14
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Senior Engineer
10
salaries
| ₹4.8 L/yr - ₹7 L/yr |
Site Engineer
9
salaries
| ₹1.9 L/yr - ₹3.6 L/yr |
Structural Engineer
7
salaries
| ₹1.6 L/yr - ₹4 L/yr |
Engineer Trainee
7
salaries
| ₹1.2 L/yr - ₹2.3 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem