Filter interviews by
I applied via Walk-in and was interviewed in Jan 2024. There were 3 interview rounds.
15min easy questions basic maths
2 different topics was given and told to discuss
The height of a column in residential buildings depends on various factors such as load-bearing capacity, structural design, and architectural preferences.
The height of a column in residential buildings is determined by the load it needs to support. Heavier loads may require taller columns.
The structural design of the building also plays a role in determining the height of the columns. Engineers consider factors like t...
Various types of steel are used, depending on the specific application and requirements.
Different types of steel are used in construction, automotive industry, manufacturing, and more.
Some common types of steel include carbon steel, stainless steel, alloy steel, and tool steel.
Carbon steel is widely used due to its strength and affordability.
Stainless steel is corrosion-resistant and commonly used in kitchen appliances...
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
There is no direct conversion between square feet and cubic meters as they measure different dimensions.
Square feet (ft²) is a unit of area, while cubic meters (m³) is a unit of volume.
To convert between the two, you would need to know the height or depth of the space in question.
For example, if you have a room that is 10 feet wide, 10 feet long, and 10 feet high, the volume would be 1,000 cubic feet (10 ft × 10 ft × 1...
The permetric weight of 25mm reinforcement can be found using the formula: weight = (d^2/162) * L, where d is the diameter and L is the length.
Calculate the square of the diameter of the reinforcement (25mm * 25mm = 625mm^2)
Divide the square by 162 (625mm^2 / 162 = 3.858mm)
Multiply the result by the length of the reinforcement to get the permetric weight
Strength of 28 days refers to the compressive strength of concrete after 28 days of curing.
It is a measure of the concrete's ability to resist compression.
It is an important factor in determining the quality of the concrete.
The strength of concrete can vary depending on the mix design, curing conditions, and other factors.
The standard for minimum compressive strength of concrete after 28 days is 20 MPa.
Testing is done ...
The answer is 0.1818
The formula is a division operation
The result is a decimal number
The answer is recurring
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 19 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.
Explain logic of stack
posted on 15 Jul 2024
Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.
Understanding the overall goals and objectives of the organization
Developing detailed action plans to achieve those goals
Assigning tasks and responsibilities to team members
Monitoring progress and making adjustments as needed
Ensuring that resources are allocated efficiently
Communicating effectively w...
posted on 11 Jul 2025
I appeared for an interview before Jul 2024, where I was asked the following questions.
My strength lies in my problem-solving skills, adaptability, and ability to collaborate effectively with diverse teams.
Strong analytical skills: I successfully led a project that reduced processing time by 30% through data analysis.
Adaptability: I quickly learned a new programming language to meet project demands, resulting in timely delivery.
Collaboration: I facilitated cross-functional team meetings that improved com...
Yes, I am familiar with IS codes, which are standards set by the Bureau of Indian Standards for various engineering practices.
IS codes cover a wide range of engineering disciplines, including civil, mechanical, and electrical engineering.
For example, IS 456:2000 provides guidelines for plain and reinforced concrete design.
IS 800:2007 outlines the general construction in steel, ensuring safety and reliability.
These code...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
It is very good in study for
Further studies.
I appeared for an interview in Oct 2024, where I was asked the following questions.
A Data Analyst interprets data to help organizations make informed decisions.
Collects and cleans data from various sources, e.g., databases, surveys.
Analyzes data trends and patterns using statistical tools, e.g., Excel, SQL.
Creates visualizations to present findings, e.g., dashboards in Tableau.
Collaborates with teams to understand data needs and provide insights.
Prepares reports summarizing analysis results for stake...
Expected salary for a Data Analyst varies based on experience, location, and industry, typically ranging from $60,000 to $100,000.
Entry-level positions may start around $60,000 in smaller markets.
Experienced analysts in major cities can earn upwards of $90,000.
Specialized roles, like data science, may command higher salaries, exceeding $100,000.
Industry also matters; finance and tech sectors often pay more than healthc...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.
Experienced business analyst with a background in data analysis and process improvement.
Over 5 years of experience in analyzing business processes and identifying areas for improvement
Skilled in data analysis tools such as Excel, SQL, and Tableau
Strong communication and problem-solving skills
Led a project to streamline inventory management processes, resulting in a 20% reduction in costs
based on 2 interview experiences
Difficulty level
Duration
based on 20 reviews
Rating in categories
Civil Engineer
9
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Site Engineer
8
salaries
| ₹1.5 L/yr - ₹3.4 L/yr |
Civil Site Engineer
8
salaries
| ₹1.7 L/yr - ₹5.6 L/yr |
Site Supervisor
7
salaries
| ₹1.5 L/yr - ₹4.9 L/yr |
Junior Engineer
4
salaries
| ₹1.8 L/yr - ₹2.4 L/yr |
GAMMON INDIA
Patil Group
Millennium Engineers & Contractors
Karam Industries