Filter interviews by
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
My course subjects include electrical engineering, electronics, power systems, control systems, and programming.
Electrical engineering: covers the fundamentals of electricity and electrical systems
Electronics: focuses on the design and analysis of electronic circuits and devices
Power systems: deals with the generation, transmission, and distribution of electrical power
Control systems: covers the theory and design of sy...
Process, cycle, 5s, kanban, TPS are all related to manufacturing and lean management.
Process refers to a series of steps taken to produce a product or service.
Cycle time is the time it takes to complete one cycle of a process.
5S is a methodology used to organize and maintain a clean and efficient workplace.
Kanban is a system used to manage inventory and production flow.
TPS (Toyota Production System) is a lean manufactu
Production is the process of creating goods or services, while manufacturing is the process of making products on a large scale.
Production involves creating goods or services from raw materials or components.
Manufacturing involves the use of machines, tools, and labor to produce goods on a large scale.
Production can be done on a small scale, while manufacturing is typically done on a large scale.
Examples of production ...
I applied via Campus Placement and was interviewed before May 2023. There were 2 interview rounds.
Top trending discussions
based on 1 review
Rating in categories
Assistant Engineer
119
salaries
| ₹2.1 L/yr - ₹6 L/yr |
Assistant Manager
106
salaries
| ₹4.8 L/yr - ₹11 L/yr |
Senior Engineer
105
salaries
| ₹3.6 L/yr - ₹8.5 L/yr |
Engineer
100
salaries
| ₹2.8 L/yr - ₹7 L/yr |
Design Engineer
81
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Mahindra Agri Solutions
Godrej Agrovet
Bayer Crop Science Vegetable Seeds
Syngenta