Upload Button Icon Add office photos

SEW Infrastructure

Compare button icon Compare button icon Compare

Filter interviews by

SEW Infrastructure Production Engineer Interview Questions and Answers

Updated 13 Jun 2024

SEW Infrastructure Production Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell about yourself
  • Q2. Tell about your details

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare and study very well then you can win the race

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Type of heat exchanger
  • Ans. 

    Heat exchangers are devices used to transfer heat between two or more fluids.

    • There are several types of heat exchangers, including shell and tube, plate heat exchangers, and finned tube heat exchangers.

    • The type of heat exchanger used depends on factors such as the application, fluid properties, and space constraints.

    • For example, shell and tube heat exchangers are commonly used in industrial applications, while plate he...

  • Answered by AI
  • Q2. She'll & tube, plate, double pipe, U-tube, and scrapped surface heat exchanger

Interview Preparation Tips

Interview preparation tips for other job seekers - I want job

I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Basics related to piperack design
  • Q2. Design parameters for steel structure
  • Ans. 

    Design parameters for steel structure

    • Load capacity and distribution

    • Material strength and durability

    • Environmental factors such as wind and seismic activity

    • Connection details and joint design

    • Fire resistance and protection measures

  • Answered by AI
  • Q3. Number of years exposure to staad
  • Ans. 

    I have 5 years of exposure to STAAD software.

    • I have used STAAD for various structural analysis and design projects.

    • I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.

    • I have experience in using STAAD for seismic analysis and design of structures.

    • I have also used STAAD for foundation design and analysis.

    • I keep myself updated with the latest versions and features of STAAD so

  • Answered by AI
  • Q4. Grating design and deflection limits

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive & confident

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why leave the previous company?
  • Q2. Tell us something about yourself
Round 3 - Assignment 

Total 3 rounds of interview were conducted

Round 4 - HR 

(1 Question)

  • Q1. Salary is getting higher

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview

SEW Infrastructure Interview FAQs

How many rounds are there in SEW Infrastructure Production Engineer interview?
SEW Infrastructure interview process usually has 1 rounds. The most common rounds in the SEW Infrastructure interview process are Technical.

Tell us how to improve this page.

SEW Infrastructure Production Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 116 Interviews
Apco Infratech Interview Questions
3.7
 • 114 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 60 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
Civil Site Engineer
15 salaries
unlock blur

₹1.9 L/yr - ₹7.2 L/yr

Senior Engineer
13 salaries
unlock blur

₹5.6 L/yr - ₹12.8 L/yr

Electrical Engineer
8 salaries
unlock blur

₹2.2 L/yr - ₹4 L/yr

Surveyor
7 salaries
unlock blur

₹2.2 L/yr - ₹3.2 L/yr

Junior Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Explore more salaries
Compare SEW Infrastructure with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview