Upload Button Icon Add office photos

Filter interviews by

Seco Komos Automotive Mrp Controller Interview Questions and Answers for Experienced

Updated 12 Sep 2021

Seco Komos Automotive Mrp Controller Interview Experiences for Experienced

1 interview found

Interview Questionnaire 

1 Question

  • Q1. Basic planning related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst management
Worst HR Team
Zero learning

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is the size of cutting wheel ? How many tyoes of bearing? What is the main purpose of bearing? Difference between ring spanner and hook spaners?
  • Ans. 

    The cutting wheel size varies depending on the tool. There are different types of bearings used for various applications. Bearings are used to reduce friction and support rotating parts. Ring spanners have a circular opening while hook spanners have a hook-shaped opening.

    • Cutting wheel size varies depending on the tool being used.

    • There are different types of bearings such as ball bearings, roller bearings, and plain bea...

  • Answered by AI
Round 3 - Family background 

(1 Question)

  • Q1. Explain about your faimly?

I applied via Recruitment Consultant and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Stamping

Interview Preparation Tips

Interview preparation tips for other job seekers - It was technical about sheetmetal

I applied via Walk-in and was interviewed before Oct 2019. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions related to lean manufacturing and automobile engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - One crew asked questions simultaneously in different topics to test how much depth of knowledge you are having. I was interviewed for GET position in lucas tvs.

I applied via Company Website and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Tell what you work

I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Question belongs to what you have mentioned in your resume?

I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Mold related
  • Q2. Suitable answers

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice

Interview Questionnaire 

3 Questions

  • Q1. What is MSA SPC and 7qc tools?
  • Ans. 

    MSA SPC and 7qc tools are quality control methods used in manufacturing and engineering.

    • MSA (Measurement System Analysis) is used to evaluate the measurement system's ability to provide accurate and reliable data.

    • SPC (Statistical Process Control) is used to monitor and control a process to ensure it operates within its limits and produces consistent results.

    • 7qc tools (Seven Quality Control Tools) are a set of technique...

  • Answered by AI
  • Q2. Sheet metal process ?
  • Ans. 

    Sheet metal process involves cutting, bending, and shaping metal sheets to create various products.

    • Cutting: using tools like shears, lasers, or plasma cutters to cut the metal sheet into the desired shape

    • Bending: using press brakes or rollers to bend the metal sheet into the desired shape

    • Shaping: using tools like hammers or punches to create specific features or designs on the metal sheet

    • Assembly: joining multiple meta...

  • Answered by AI
  • Q3. Defects in sheet metal?
  • Ans. 

    Defects in sheet metal can occur due to various reasons.

    • Warping

    • Cracking

    • Lack of uniformity

    • Corrosion

    • Scratches

    • Dents

    • Blisters

    • Porosity

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There were 6 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Can you provide an introduction about yourself?
  • Ans. 

    Experienced engineer with a background in mechanical and electrical engineering, specializing in project management and problem-solving.

    • Bachelor's degree in Mechanical Engineering from XYZ University

    • 5+ years of experience working in the automotive industry

    • Proficient in CAD software such as SolidWorks and AutoCAD

    • Led a team of engineers to successfully launch a new product line

  • Answered by AI
  • Q2. What is the organizational structure of the toolroom?
  • Ans. 

    The toolroom is typically organized in a hierarchical structure with a manager overseeing toolmakers and machinists.

    • Typically led by a Toolroom Manager who oversees the operations

    • Toolmakers and machinists report to the Toolroom Manager

    • May have specialized teams for different types of tools or machinery

    • Collaborates closely with engineering and production departments

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Organization structure
  • Q2. What is the process of mold maintenance?
  • Ans. 

    Mold maintenance involves regular cleaning, inspection, and repair of molds used in manufacturing processes.

    • Regularly clean molds to prevent buildup of residue or contaminants

    • Inspect molds for wear and tear, cracks, or other damage

    • Repair any issues found during inspection to ensure molds function properly

    • Store molds properly when not in use to prevent damage or contamination

  • Answered by AI
Round 3 - Assignment 

Encourage a positive culture that fosters the development of new ideas and activities for improvement.

Round 4 - Technical 

(2 Questions)

  • Q1. What is the difference between corrective action and preventive action?
  • Ans. 

    Corrective action is taken to address an existing issue, while preventive action is taken to avoid potential issues in the future.

    • Corrective action is reactive, addressing problems that have already occurred.

    • Preventive action is proactive, aiming to prevent problems from happening in the first place.

    • Corrective action focuses on fixing the root cause of a problem.

    • Preventive action focuses on identifying and eliminating ...

  • Answered by AI
  • Q2. What are the differences between preventive maintenance and predictive maintenance?
  • Ans. 

    Preventive maintenance is scheduled maintenance performed on a regular basis to prevent breakdowns, while predictive maintenance uses data and analytics to predict when equipment will fail.

    • Preventive maintenance is scheduled at regular intervals to prevent breakdowns.

    • Predictive maintenance uses data and analytics to predict when equipment will fail.

    • Preventive maintenance is time-based, while predictive maintenance is c...

  • Answered by AI
Round 5 - Technical 

(2 Questions)

  • Q1. What is breakdown maintenance?
  • Ans. 

    Breakdown maintenance is a type of maintenance where equipment is only repaired after it has broken down.

    • Breakdown maintenance is reactive in nature, as repairs are only done after a breakdown occurs.

    • It can lead to increased downtime and production losses.

    • This type of maintenance is usually more costly compared to preventive maintenance.

    • Examples include fixing a machine only when it stops working or repairing a vehicle

  • Answered by AI
  • Q2. What is the frequency of preventive maintenance?
  • Ans. 

    The frequency of preventive maintenance varies depending on the equipment and industry standards.

    • Frequency of preventive maintenance is typically determined by equipment manufacturer recommendations.

    • Some industries may have specific regulations or standards that dictate the frequency of preventive maintenance.

    • Factors such as usage, environmental conditions, and criticality of the equipment can also influence the freque...

  • Answered by AI
Round 6 - Technical 

(2 Questions)

  • Q1. Lifter pad and lifter different
  • Ans. 

    Lifter pad and lifter are different components used in mechanical systems.

    • Lifter pad is a component used to support and lift heavy objects, while lifter is a device used to lift and move objects vertically.

    • Lifter pads are often made of rubber or other materials to provide cushioning and grip, while lifters can be hydraulic, pneumatic, or mechanical.

    • Lifter pads are stationary and provide a stable base for lifting, while...

  • Answered by AI
  • Q2. What is the frequency of tool life
  • Ans. 

    The frequency of tool life refers to how often a tool needs to be replaced or maintained.

    • Frequency of tool life is determined by factors such as material being worked on, cutting speed, and tool material.

    • Higher cutting speeds or harder materials may require more frequent tool changes.

    • Regular maintenance and monitoring can help extend tool life and reduce frequency of replacements.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job and learning opportunities within the KML group.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How do you manage the Plant Maintenance activities?
  • Ans. 

    I manage Plant Maintenance activities by creating schedules, assigning tasks, monitoring progress, and ensuring equipment reliability.

    • Create maintenance schedules for equipment and machinery

    • Assign tasks to maintenance staff based on priority and skill level

    • Monitor progress of maintenance activities to ensure timely completion

    • Implement preventive maintenance programs to increase equipment reliability

    • Coordinate with prod...

  • Answered by AI
  • Q2. How do you handle the team under you?
  • Ans. 

    I handle my team by setting clear expectations, providing support and guidance, fostering open communication, and recognizing their achievements.

    • Set clear expectations for each team member

    • Provide support and guidance when needed

    • Foster open communication to address any issues or concerns

    • Recognize and celebrate team achievements

    • Lead by example and demonstrate a positive attitude

  • Answered by AI
  • Q3. How do you handle inter departmental issues?
  • Ans. 

    I address inter departmental issues by promoting open communication, fostering collaboration, and mediating conflicts.

    • Encourage open communication between departments to address issues promptly

    • Foster a culture of collaboration and teamwork to prevent conflicts from arising

    • Mediate conflicts between departments to find mutually beneficial solutions

    • Implement regular cross-departmental meetings to improve communication and

  • Answered by AI
  • Q4. What do you know about the TPM?
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing equipment breakdowns through proactive maintenance practices

    • It involves all employees in the maintenance process to create a culture of ownership and accountability

    • TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime and improving productivity

    • ...

  • Answered by AI
  • Q5. What do you know about the liasioning with Govt.department?
  • Ans. 

    Liaisoning with Govt. departments involves building relationships and communication to ensure smooth interactions and compliance with regulations.

    • Building relationships with key officials in government departments

    • Communicating effectively to address any issues or concerns

    • Ensuring compliance with regulations and policies

    • Facilitating approvals and permissions for projects or initiatives

    • Providing necessary documentation a

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Belrise Industries Manager interview:
  • Electrical Engineering
  • Mechanical Engineering
  • Thermal Engineering
Interview preparation tips for other job seekers - Do prepare on technical and genaral logical activities

Tell us how to improve this page.

Interview Questions from Similar Companies

Yazaki Interview Questions
3.8
 • 137 Interviews
Aptiv Interview Questions
3.5
 • 101 Interviews
JK Tyres Interview Questions
3.6
 • 98 Interviews
Krishna Maruti Interview Questions
4.0
 • 94 Interviews
Valeo Interview Questions
4.0
 • 92 Interviews
Delphi TVS Interview Questions
3.9
 • 87 Interviews
Lucas-TVS Interview Questions
3.9
 • 75 Interviews
View all
Junior Engineer
51 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Engineer
17 salaries
unlock blur

₹3.3 L/yr - ₹7.1 L/yr

Senior Engineer
16 salaries
unlock blur

₹4.8 L/yr - ₹6.3 L/yr

Assistant Manager
10 salaries
unlock blur

₹5.7 L/yr - ₹10.5 L/yr

Quality Inspector
8 salaries
unlock blur

₹1.5 L/yr - ₹2 L/yr

Explore more salaries
Compare Seco Komos Automotive with

Yazaki

3.8
Compare

Delphi TVS

3.9
Compare

Lucas-TVS

3.9
Compare

Motherson Automotive Technologies and Engineering

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview