My aim is to utilize my expertise in protection engineering to ensure the safety and reliability of electrical systems.
Ensure the proper functioning of protective relays and devices
Minimize downtime and prevent damage to equipment
Optimize system performance and reliability through effective protection schemes
My future goal is to become a lead Protection Engineer in a reputable company, where I can contribute to innovative projects and mentor junior engineers.
Advance my technical skills in protection engineering through continuous learning and training
Lead and manage complex protection projects from conception to completion
Mentor and guide junior engineers to help them grow in their careers
Contribute to the development of n...
Top trending discussions
I applied via Job Portal and was interviewed before Oct 2022. There were 3 interview rounds.
I have extensive experience in machine maintenance and troubleshooting, including working on various types of equipment.
Performed regular maintenance checks on machines to ensure optimal performance
Identified and resolved mechanical issues to minimize downtime
Utilized diagnostic tools and equipment to troubleshoot problems
Collaborated with team members to develop preventive maintenance plans
Trained new employees on mac
I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.
I handle customers with patience, empathy, and effective communication.
Listen actively to their concerns and needs
Provide clear and concise information
Offer solutions and alternatives
Remain calm and professional, even in difficult situations
Follow up to ensure satisfaction
The process of tower foundation involves several steps that are carried out day by day.
Day 1: Site preparation and layout survey
Day 2: Excavation for foundation
Day 3: Reinforcement placement
Day 4: Formwork installation
Day 5: Concrete pouring
Day 6: Curing of concrete
Day 7: Removal of formwork
Day 8: Quality inspection and testing
Day 9: Backfilling around the foundation
Day 10: Final inspection and documentation
Cube mould size refers to the dimensions of the mould used to cast concrete cubes for testing.
Cube moulds are typically made of steel or cast iron.
The most common cube mould size used in construction is 150mm x 150mm x 150mm.
Other sizes like 100mm x 100mm x 100mm or 200mm x 200mm x 200mm may also be used depending on the requirements.
Cube moulds have removable base plates to facilitate easy removal of the hardened conc...
Quality points at the pouring time of concrete include proper mix proportions, correct placement, adequate compaction, and appropriate curing.
Proper mix proportions ensure the desired strength and durability of the concrete.
Correct placement involves placing the concrete in the designated location without segregation or excessive bleeding.
Adequate compaction ensures that there are no voids or air pockets in the concret...
Sloped cutting refers to the excavation of soil or rock at an inclined angle to create a slope or incline.
Sloped cutting is commonly used in construction projects to create roadways, railways, or canals on hilly terrains.
It involves removing the excess material from a higher elevation to a lower elevation, forming a sloping surface.
The angle of the slope is determined based on factors such as soil stability, desired gr...
Deputy Manager
1.3k
salaries
| ₹5 L/yr - ₹12 L/yr |
Manager
666
salaries
| ₹6.9 L/yr - ₹19 L/yr |
Senior Manager
660
salaries
| ₹8.5 L/yr - ₹28 L/yr |
Assistant Manager
322
salaries
| ₹3.8 L/yr - ₹11 L/yr |
Deputy General Manager
303
salaries
| ₹15 L/yr - ₹41 L/yr |
Siemens
ABB
Honeywell Automation
Emerson Electric Co.