  • Q1. Draw the Cross section of Slab and Beam
  • Ans. 

    A cross section of a slab and beam shows the structural details of the elements.

    • Draw a horizontal line to represent the ground level.

    • Draw the slab thickness and beam depth to scale above the ground line.

    • Add reinforcement bars and stirrups to the slab and beam.

    • Label the dimensions and materials used.

    • Indicate the direction of the load and the support conditions.

  • Answered by AI
  • Q2. What is size of concrete blocks and their size ?
  • Ans. 

    Concrete blocks come in various sizes depending on their intended use.

    • Standard concrete blocks measure 8 inches by 8 inches by 16 inches.

    • However, there are also smaller blocks that measure 4 inches by 8 inches by 16 inches.

    • Larger blocks are also available for specific purposes such as retaining walls.

    • The size of concrete blocks can also vary depending on the country or region.

    • It is important to choose the appropriate s...

  • Answered by AI
  • Q3. What is the density of Concrete
  • Ans. 

    The density of concrete varies depending on the mix, but typically ranges from 2200 to 2500 kg/m³.

    • Density of concrete is measured in kg/m³

    • The density of concrete varies depending on the mix of materials used

    • Typically, the density of concrete ranges from 2200 to 2500 kg/m³

    • Higher density concrete is used for structures that require greater strength and durability

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Based on your work experience and work you over saw, the questions will be asked. It is like a cycle of questions based on the previous questions answers.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Give Answers to Employer's Answers

I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. All civil engineering construction into work site building construction
  • Q2. All civil engineering construction
  • Q3. RCC PCC into work from site experience on the civil engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes I am also told me that job with me civil engineering building construction All site work experience into Road & building work from site work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

What is the Substation ,
Why need cable trench,
How much room in substation

Round 3 - One-on-one 

(4 Questions)

  • Q1. Substation in civil work
  • Ans. 

    Substation in civil work involves the construction of buildings and structures to house electrical equipment for power distribution.

    • Substation civil work includes site preparation, foundation construction, building erection, and equipment installation.

    • Design considerations include safety, accessibility, and structural integrity.

    • Examples of substation civil work include transformer foundations, control buildings, and sw

  • Answered by AI
  • Q2. What is the control room ??
  • Ans. 

    The control room is a centralized location where monitoring, control, and coordination of various systems and processes take place.

    • Centralized location for monitoring and controlling systems

    • Used in industries like power plants, manufacturing plants, and transportation systems

    • Equipped with control panels, computers, communication systems, and monitoring devices

    • Allows operators to make real-time decisions and adjustments

    • ...

  • Answered by AI
  • Q3. What for battery room
  • Ans. 

    Battery rooms are designated areas where batteries are stored, charged, and maintained.

    • Battery rooms are used to store batteries for backup power systems.

    • They are equipped with charging stations and ventilation systems to ensure safety.

    • Regular maintenance and inspections are conducted in battery rooms to ensure optimal performance.

    • Battery rooms are common in industries such as telecommunications, data centers, and manu

  • Answered by AI
  • Q4. Why need cable trench
  • Ans. 

    Cable trenches are needed to protect and organize cables, prevent damage, and allow for easy maintenance and repairs.

    • Protects cables from physical damage and environmental factors

    • Organizes cables for easy identification and maintenance

    • Facilitates easy access for repairs and upgrades

    • Helps in preventing tripping hazards

    • Ensures compliance with safety regulations and standards

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - building, SP, SSP, ATS in Indian railways WDFCC
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is density of steel
  • Ans. 

    Density of steel is approximately 7.85 g/cm^3

    • The density of steel is around 7.85 grams per cubic centimeter

    • Density can vary slightly depending on the specific type of steel

    • Steel is a commonly used material in construction and manufacturing due to its strength and durability

  • Answered by AI
  • Q2. What is defined M20
  • Ans. 

    M20 is a mix of concrete with a compressive strength of 20 megapascals.

    • M20 refers to the mix of concrete with a compressive strength of 20 megapascals.

    • It is commonly used in construction for residential buildings, pavements, and small-scale projects.

    • The mix ratio for M20 concrete is 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate.

  • Answered by AI
  • Q3. What is the weight of D32 steel baar
  • Ans. 

    The weight of D32 steel bar is approximately 7.65 kg per meter.

    • The weight of D32 steel bar is calculated based on its dimensions and density

    • The density of steel is around 7.85 g/cm^3

    • To calculate the weight, you need to know the length of the bar

    • For example, a 1 meter long D32 steel bar would weigh approximately 7.65 kg

  • Answered by AI
  • Q4. What is density of cement Ans-1440kg/m3
  • Ans. 

    The density of cement is 1440kg/m3.

    • Density of cement is a measure of its mass per unit volume.

    • It is commonly expressed in kilograms per cubic meter (kg/m3).

    • The density of cement can vary slightly depending on the type and brand.

    • For example, Portland cement typically has a density of around 1506kg/m3.

  • Answered by AI
  • Q5. What is ratio of M25 grade concrete? Ans-1:1:2
  • Ans. 

    The ratio of M25 grade concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • M25 grade concrete has a ratio of 1:1:2 for cement, sand, and aggregate respectively

    • This ratio indicates the proportion of each ingredient in the concrete mix

    • For example, for every 1 bag of cement, 1 cubic foot of sand and 2 cubic feet of aggregate are used

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Work in constraction site engineer qustion
  • Q2. DPR DLR railway relited

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Emergency EHS 

(1 Question)

  • Q1. How do you guys handle emergency situations?
  • Ans. 

    We have a designated emergency response team trained to handle various emergency situations.

    • Designated emergency response team trained for various emergency scenarios

    • Regular emergency drills and training sessions to ensure preparedness

    • Established communication protocols to quickly coordinate response efforts

    • Access to emergency supplies and equipment for immediate assistance

    • Collaboration with local authorities and emerg

  • Answered by AI

I applied via Campus Placement and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Civil

Round 3 - Aptitude Test 

Interview Preparation Tips

Interview preparation tips for other job seekers - Excellent for Working company
Civil construction
Round 1 - Technical 

(1 Question)

  • Q1. What are the basic duties of a site Engineer
  • Ans. 

    A site engineer is responsible for overseeing construction projects and ensuring they are completed on time, within budget, and to the required quality standards.

    • Supervising construction activities on site

    • Ensuring compliance with building codes and regulations

    • Managing project timelines and budgets

    • Coordinating with contractors, architects, and other stakeholders

    • Preparing progress reports and presenting to management

    • Ensu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your head calm & try to give a subtle answer

SBR Group Interview FAQs

How many rounds are there in SBR Group Site Engineer interview?
SBR Group interview process usually has 1 rounds. The most common rounds in the SBR Group interview process are One-on-one Round.
What are the top questions asked in SBR Group Site Engineer interview?

Some of the top questions asked at the SBR Group Site Engineer interview -

  1. What is size of concrete blocks and their siz...read more
  2. What is the density of Concr...read more
  3. Draw the Cross section of Slab and B...read more

Tell us how to improve this page.

SBR Group Site Engineer Salary
based on 4 salaries
₹3.2 L/yr - ₹4.5 L/yr
5% more than the average Site Engineer Salary in India
View more details

SBR Group Site Engineer Reviews and Ratings

based on 2 reviews

3.6/5

Rating in categories

5.0

Skill development

4.6

Work-life balance

4.2

Salary

4.0

Job security

4.2

Company culture

4.0

Promotions

3.6

Work satisfaction

Explore 2 Reviews and Ratings
Senior Site Engineer
7 salaries
unlock blur

₹5.5 L/yr - ₹7.5 L/yr

MEP Manager
7 salaries
unlock blur

₹8 L/yr - ₹12 L/yr

Civil Site Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Project Engineer
6 salaries
unlock blur

₹4 L/yr - ₹6 L/yr

Supervisor
5 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Explore more salaries
Compare SBR Group with

Aditya Birla Group

4.1
Compare

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview