I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Various fire extinguishing methods include water, foam, dry chemical, CO2, and halon.
Water - used for Class A fires involving ordinary combustibles like wood or paper
Foam - effective for Class B fires involving flammable liquids like gasoline or oil
Dry chemical - suitable for Class C fires involving electrical equipment
CO2 - used for Class B and C fires, displaces oxygen to extinguish flames
Halon - effective for Class ...
Top trending discussions
posted on 16 Aug 2021
posted on 14 Jan 2022
posted on 2 Apr 2022
I applied via Referral and was interviewed in Jan 2022. There were 4 interview rounds.
Expected CTC should be based on the candidate's experience, skills, and the industry standards.
Consider the candidate's years of experience in the field
Take into account the candidate's technical skills and expertise
Research industry standards for Senior Engineer salaries
Discuss with the candidate their salary expectations and negotiate if needed
A working drum elements system is a mechanism that allows for the efficient and effective movement of drums.
The system should be designed to handle drums of various sizes and weights
It should include components such as rollers, conveyors, and lifters
The system should be automated to reduce manual labor and increase productivity
Regular maintenance and inspections are necessary to ensure the system is functioning properl
I appeared for an interview before Mar 2024, where I was asked the following questions.
posted on 18 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.
A step-up transformer is used to increase the voltage in an electrical circuit.
Step-up transformers have more turns in the secondary coil than in the primary coil.
They work based on the principle of electromagnetic induction.
The primary coil is connected to a power source with a lower voltage, while the secondary coil is connected to the load.
The increased voltage in the secondary coil is proportional to the ratio of t...
The commissioning process of a PV solar plant involves testing, adjusting, and optimizing the system to ensure it is functioning properly.
Testing the electrical components and connections to ensure they are working correctly
Adjusting the system settings to maximize efficiency and output
Optimizing the performance of the solar panels to achieve the desired energy production
Checking for any potential issues or malfunction
Transformer types of testing include routine tests, type tests, and special tests to ensure proper functioning and safety.
Routine tests include insulation resistance, turns ratio, and polarity tests.
Type tests are conducted on a prototype to verify design parameters like temperature rise and short-circuit withstand.
Special tests may include impulse voltage, partial discharge, and noise level tests.
Testing ensures trans...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Distribution Engineer
9
salaries
| ₹20 L/yr - ₹45 L/yr |
Electrical Technician
8
salaries
| ₹1.8 L/yr - ₹8.9 L/yr |
Electrical Engineer
7
salaries
| ₹12 L/yr - ₹45 L/yr |
Electrician
7
salaries
| ₹2 L/yr - ₹8 L/yr |
Project Manager
6
salaries
| ₹30 L/yr - ₹38 L/yr |
Vestas
Dhoot Transmission
Siemens Energy
Danfoss Power Solutions